Loading...
HomeMy WebLinkAboutSTONEBRIDGE GARDEN APARTMENTS PRELIM PUD - 82 93 - CORRESPONDENCE - RESPONSE TO STAFF REVIEW COMMENTSStonebridge Apartments at Courtney Park Harmony Road at Wheaton Drive Ft. Collins, Colorado Square Foot Development c/o Loftus Developments 4700 Walnut Boulder, CO 80301 PRELIMINARY LAND USE DESIGN INFORMATION January 4, 1994 Project Size: 168 Units Unit Mix: Quantity 1 BR 720 s.f. 76 2BR (standard) 910 s.f. 62 2BR (double master) 1,070 s.f. 14 3BR 1,100 s.f. 16 Unit Breakdown Units 3BR 2BR 2BR 1 BR 8 Buildings DBL STD A 23 2 1 8 12 B 17 2 1 8 6 C 17 2 1 8 6 D 23 2 1 8 12 E 27 0 4 9 14 F 27 0 4 9 14 G 17 2 1 8 6 H 17 2 1 8 6 168 12 14 66 76 Parking Information: Parking Required: 3BR - 2 autos/unit 12 units 24 autos 2BR - 1.75 autos/unit 80 units 140 autos 1 BR - 1.5 autos/unit 76 units 114 autos Total Provided: 278 autos Total Provided (86 garages, 206 surface) 292 autos Guest Parking 9 autos Clubhouse Parking 5 autos coun".114 Ii a Stonebridge Apartments at Courtney Park Harmony Road at Wheaton Drive Fort Collins, Colorado LAND USE CALCULATIONS Lot Size: 440,990 s.f. Zone: P.U.D./R. P. Density: 16.6 units per acre Gross Apartment Area: Average Area of Units: Clubhouse: Total Project Area: Gross Land Area: 440,990 s.f. (10.1238 acres) Building Coverage: 58,320 s.f. A 23 units incl. 5 garages 7,810 B 17 units incl. 5 garages 6,390 C 17 units incl. 5 garages 6;390 D 23 units incl. 5 garages 7,810 E 27 units incl. 10 garages 8,570 F 27 units incl. 10 garages 8,570 G 17 units incl. 5 garages 6,390 H 17 units incl. 5 garages 6,390 Garages (3) - 2,640 s.f. each: 7,920 s.f. Clubhouse: 3,260 s.f. Driveway & Parking: 111,750 s.f. Open Space: 259,740 s.f. Functional Open Space: A Pool Open Area 11,500 s.f. B Clubhouse Play Area 14,000 s.f. January 4, 1994 10.1238 acres 143,068 s.f. 852 s.f. 3,260 s.f. 146,328 s.f. 100% 13.3% 1 .8% 0.7% 25.3% 58.9% 5.8% stone2.014 No Text STONEBRIDGE APRTMENTS REVISED TECHNICAL SUBMISSION Page 2 7. The Poudre Fire Authority is correct in that all buildings will be fire sprinkled. The engineering of the utility lines will be apart of the final technical submission. The turning radius of 20 feet inside, 40 feet outside have been addressed as has the entry to the clubhouse turn around. No parking and fire lane signs will be installed where deemed necessary. 8. The overall development plan will be corrected to locate the uses across the street properly. 9. The technical site plan is now titled "Preliminary." 10. The clubhouse includes a full-time management office. The floor plan on sheet 3 reflects this. 1 1 . The trash receptacle/enclosures have been adjusted. 12. Handicap spaces have now been indicated. 13. There is now a "bridge" detail included on the site plan. It is not a bridge but a culvert "disguised" as a bridge. 14. The landscape plan has been updated. The drainage pipe will include an inlet to allow no scale and the necessary berming. 15. The planting islands have been added as suggested. 16. The additional walkway to LeMay Avenue will be provided by the developer. The details will be worked out as part of the final plat. 17. The additional bonus points will be taken for the off site walkway, on site parking and fire sprinkling. The overall 168 unit density is accomplished by the "Land Development Guidance System" requirements and these features add to the "liability" of the proposed complex. We will meet to review this submission prior to the next neighborhood meeting to determine if our revisions satisfy the various areas of input for the land use design. Thank you for your assistance in processing this proposed multifamily development. ly, Janes Junge' A Linda-R�pl'ey , Jim Loftus JUNGE / REICH / ASSOCIATES ARCHITECTURE & PLANNING PROFESSIONAL CORPORATION January 5, 1994 Steve Olt, Project Planner City Planning Department 281 N. College Ft. Collins, CO 80522 RE: STONEBRIDGE APARTMENTS REVISED TECHNICAL SUBMISSION The attached updated preliminary site plan has been revised to both address the city staff input as well as to continue to improve the land use design. The major changes include 1) relocation of one of the three free standing garages away from the end facing garages; 2) enlarging the central functional open space for the pool area and play space, and 3) the improvement of the vehicle parking layout including the addition of several islands. The landscape intent plan has also been revised to reflect changes, but to also add tress and berms to further enhance the over 55% open space. The overall plan has reduced the three bedroom units to 12, adding 4 to the two bedroom count. We are extremely pleased with the positive comments from the city review to date and believe we are on track to develop an extremely high quality garden apartment community. The specific responses are in the same order of your December 21, 1993, memorandum. Storm utility information review is now acceptable to Glen Schlueter, City Engineer. I suggest a meeting be set next week to review the final engineering criteria, etc. 2. T.V. will be prewired. 3. U.S. West telephone systems will be provided per U.S. West requirements. 4. Public Service has power to the site. Our electrical engineer will coordinate the site utility design with them prior to building permit. 5. A City Light and Power Department meeting is desirable. We will set a meeting next week with Kevin Westhuis. 6. All Engineering Department's comments will be addressed at final plat. The sanitary sewer is existing in Monte Carlo Drive. Final engineering will address the final sidewalk, drive and parking striping layout. The brick crosswalk has been eliminated. A soils report is underway. 4141 ARAPAHOE AVENUE, SUITE 100 303 444.2987 BOULDER, COLORADO 80303 FRX 303 444.5085