Loading...
HomeMy WebLinkAboutODELL BREWING COMPANY - MINOR SUBDIVISION - 86-93A - CORRESPONDENCE - RESPONSE TO STAFF REVIEW COMMENTSPROJECT City of Fort Coffins DATE: SHEET DATE: 11 January 1994 DEPARTMENT: v s vVes� PROJECT: &C�-93A01DELUS BREWERY - Minor Subdivision PLANNER:. Steve Olt Please respond to this project by Friday, January 21,1994. Q No Problems ® Problems or concerns (see below) Review of these plans should not be construed as a commitment that telephone facilities sufficient to serve this project are presently available. U S WEST Communications will provide telephone service in accordance with the rates and tariffs on file with the Colorado Public. Utilities Commission. The developer. is responsible for providing conduit or trench for telephone facilities within the project. Please refer the developer to U S WEST Communications at (303)224-7470 or 224-7473. The developer may choose to provide joint trench for electric, television, and telephone cables. In this case the developer coordinates the placing sequence of each utility. If these plans necessitate the relocation of existing telephone facilities, the developer will pay for the relocation. .Date: �a-u- • /l• / 9�'S` Signature:. CHECK IF YOU WISH TO RECEIVE ® PLA COPIES OF REVISIONS: SITE LANDSCAPE UTILITY COMMUNITY PLANNING & ENVIRONMENTAL SERVICES 2S1 NORTH COLLEGE P.O.BOX 5S0 FORT COLLINS, COLORADO 80522-0580 (303)221-6750 PLANNING DEPARTMENT 29 b. Water supply to the building must be within 400' ( a fire hydrant) and must provide a minimum of 1,000 gallons per minute with 20 pounds per square inch residual pressure. C. The building size may determine the need for an automatic fire sprinkler system. 9. The Engineering Department has made the following comments. These comments relate more to the IP Site Plan review than the plat: a. The utility plans need to indicate the proposed pavement section of parking lot and driveways. b. The utility plans need to include a preliminary design for the future centerline and flowline profiles of Lincoln Avenue to show that the driveways will work with the future street cross-section when Lincoln Avenue is widened to the arterial width. This development will.be responsible for the cost of its share of the improvements to Lincoln Avenue at the time the City determines that the improvements are necessary. C. Additional details are needed on the driveway design (spot elevations, radii, etc.) d. Show limits of patch on Lincoln Avenue for.the utility cuts. It is important to review my comment letter dated January 4, 1994� to make sure that the needed revisions and responses for both the Odell's Brewery IP Site Plan review and the Minor Subdivision review are addressed. Please contact me at 221-6750 if you have questions about these comments. Si c rely, Olt Project Planner xc: Kerrie Ashbeck Advance Planning Stormwater Utility Transportation Natural Resources Frank Vaught Water, Waste & Land file/Project Planner Commu , Planning and Environmental ices Planning Department City of Fort Collins January 25, 1994 Laurie Odell Odell Investments 119 East Lincoln Avenue Fort Collins, CO. 80524 Dear Laurie, Staff has reviewed the documentation for Odell's Brewery that was submitted to the City for a Minor Subdivision administrative review, and has the following comments to offer: 1. U.S. West Communications is requesting 10' wide utility easements to be provided along the east property line of Lot 11 the west property line of Lot 2, and the north property line of both these lots. A copy of the comment sheet received from U.S. West is enclosed with this letter. 2. Both lots on the subdivision plat show two different lot areas. Why are there two areas? The plat should show only one area for each lot. 3. What do the two acreage numbers straddling the middle lot line represent? It is being assumed that they represent the total area of Lots 1 & 2. If so, they should not be shown on the drawing; however, they could be done as a note to the side of the drawing. No two numbers adds up to 3.8096 acres. 4. A vicinity map is required on the subdivision plat and none is included. 5. The title of the subdivision plat should say "Plat of" or "Subdivision Plat of", not "Land Survey Plat". 6. The outer boundary legal description closes. The field survey data (bearings and distances in parenthesis) does not close. 7. Are there any utility easements needed, other than the aforementioned U.S. West requests, for utility services to this property? How is electric service, gas service, and storm drainage being accomodated with this plat? 8. The Poudre Fire Authority has made the following comments: a. All structures will need to meet P.F.A. access requirements. 281 North College Avenue • P.O. Box 580 • Fort Collins, CO 80522-0580 • (303) 221-6750 ODELL BREWING COMPANY PROJECT RESPONSE TO LETTER - S. OLT TO L. ODELL DATED 1 /25/94 (numbers below refer to numbered items in letter) 1 . The 10 foot easement requested by U.S. West has been provided. Mr. Hage advises that joint use of the easement created for the detention pond along a portion of the east and north property lines is satisfactory to him as the 1:4 detention pond embankment slopes pose no problems. 2. One area is by deed. The other area is by survey. Please see surveyor's notes and the additional notations that have been added to area values. 3. The numbers refer to total areas. They have been relocated outside the property lines. The total for the numbers by survey is exact. The total for the numbers by deed is off by 0.0001 acre due to rounding error. 4. A vicinity map has been added. 5. The title has been changed. 6. There was a typographical error in the bearing of the east property line that has been corrected. Both sets of data now close. 7. Neither electric service nor gas service requires an easement within the property. This has been confirmed with the respective utilities. Detention pond easements have been provided. 8. The architect will comment on Fire Authority requirements. 9. All comments by the Engineering Department have been responded to in a separate narrative with one exception. Regarding the pavement proposed, these details were and are shown on Drawing 6 of the Utility Plans. J