Loading...
HomeMy WebLinkAboutODELL BREWING COMPANY - IP SITE PLAN REVIEW - 86-93 - SUBMITTAL DOCUMENTS - ROUND 1 - GEOTECHNICAL (SOILS) REPORTOdell's Brewing Company 2 uecemoer io, ,eoo 10 for footings and floor slabs on these subsoils is acceptable settlement. Options for the brewery structures range from constructing footings on the sands and gravels to constructing footings on the compressible soils in a manner that minimizes settlement. These options are outlined in this report. The site exploration and engineering analyses documented in this report for the Odell's Brewery site have been conducted by Water, Waste & Land, Inc. under the direct supervision of Clint Strachan, Colorado Professional Engineer (Civil) registration number 19302. 0", LOUIS ST 6k/ iSTE4-. Cyr. 'L s a 19302 W NA �s t p i✓�� 1�T :S�O N F.1 ueo[ecnmca, cngumonuy ,.oval. December 16. 1993 Odell's Brewing Company 1 70 1.0 INTRODUCTION This report presents the results of the geotechnical site investigation conducted for Odell's Brewing Company at the proposed Odell's Brewery location in northeast Fort Collins, Colorado. This investigation was conducted by Water, Waste & Land, Inc. (WWL) as authorized by Odell's Brewing Company in November 1993. 1.1 Site Location The proposed location for the Odell's Brewery is at 800 East Lincoln Avenue, north of the Link- N-Greens Golf Course, and west of the Fort Collins Monument and Stone property. The proposed property consists of approximately 4 acres located within the Northeast '/4 of Section 12, Township 7 North, Range 69 West of the Sixth Prime Meridian, within the City of Fort Collins, in Larimer County, Colorado. 1.2 Objectives of Investigation This work was conducted with the following objectives. (1) To evaluate the general geotechnical condition of soils on the property (including the western portion of the property). (2) To assess the geotechnical conditions of site soils on the eastern portion of the property specific to construction of the proposed brewery. structures. (3) To make pertinent recommendations regarding structural foundation design, pavement design, fill placement, and runoff and erosion control for brewery structure construction. 1.3 Scope of Report The western portion of the property addressed in this report is planned to be sold by the current owner for industrial or commercial development. The eastern portion is planned for development of the brewery. Site exploration and geotechnical evaluation of the western portion of the site were directed toward light commercial development. Site exploration and geotechnical evaluation of the eastern portion of the property were conducted in more detail than on the western portion of the property and were directed toward the structures currently planned for the brewery. In the event that the structures on the Odell's Brewery portion of the property change during design or if future structures planned for the west portion of the site are relatively large, unusual, or heavy, the conclusions and recommendations in this report may not be valid. 1.4 Summary of Results The site exploration and geotechnical evaluation work outlined in this report show that the site is underlain by a layer of soft, compressible soils (silty clays) at a depth of up to 7 feet below the existing ground surface. Beneath these soils are dense alluvial sands and gravels. The critical issue Geotechmcal tngineenng Neport Odell's Brewing Company i December 15, 1993 TABLE OF CONTENTS 1.0 INTRODUCTION ................................................. 1.1 Site Location .............................................. 1.2 Objectives of Investigation ..................................... 1 1 1 1.3 Scope of Report ............................................ 1 1.4 Summary of Results ......................................... 1 2.0 SITE EXPLORATION AND TESTING .................................... 2.1 Site Exploration ............................................ 3 3 2.2 Soil Testing ................................................ 3 2.3 Summary of Soil Conditions .................................... 3 2.4 Overview of Ground Water Conditions ............................. 4 2.5 Other Site Features .......................................... 5 3.0 RECOMMENDATIONS AND DISCUSSION ................................ 7, 3.1 Site Grading, Excavation, and Utilities ............................. 7 3.2 Building Foundations 8 3.2.1 Settlement .......................................... 8 3.2.2 Option 1: Wall and Column Footings Founded On Sandy Gravel ..... 9 3.2.3 Option 2: Wall and Column Footings Founded On Structural Fill 9 3.2.4 Drilled Piers Founded On Gravel With Grade Beams 9 3.2.5 Malted Barley Silo Foundation ............................. 10 3.3 Slab.on Grade ............................................. 12 3.4 Backfill and Lighting Standard Foundations ......................... 12 3.5 Retaining Walls ............................................. 12 3.6 Pavement Design Recommendations ............................... 13 3.7 Erosion Control ........ • 15 3.8 General Recommendations ..................................... 15 APPENDIX A .................................................. Boring Logs APPENDIX B......................................... Soil Lab Testing Results II i II I I E GEOTECHNICAL INVESTIGATION REPORT FOR THE ODELL'S BREWERY SITE Odell's Brewing Company 119 East Lincoln Ave. Fort Collins, CO 80524 Water, Waste & Land, Inc. 2629 Redwing Road, Suite 200 Fort Collins, Colorado 80526 December 15, 1993 K" WATER WASTE & LAND