Loading...
HomeMy WebLinkAboutFALCON RIDGE PUD - PRELIMINARY - 2-94F - MINUTES/NOTES - CORRESPONDENCE-NEIGHBORHOOD MEETINGNEIGHBORHOOD INFORMATION MEETING Written n Notification of this meeting? ACorrect. Name Address Zip Yes No Yes No 52-0 NCP :Kn5 plod bap �'lC�/nl�i-►tc77t-� �S' !� v� itam YArnj 6b� XIX" Ciukb i�octd (e;0524 X X NEIGHBORHOOD INFORMATION MEETING Meetina • • D, / Attendees: Please sign this sheet. The information will be used to update the project mailing list and confirm attendance at neighborhood meetings. Contact the Planning Department (221-6750) if you wish to receive minutes of this meeting. Did You Receive Written NotificationAddress? of this meeting? Correct Name Address Zip Yes No Yes No ����4 �/eC Lam (a%3 Acra F I kv Cc�f� + (0 CO2 tR4, ecrrzy �0'Yy !/ (SOS t,-v- V1-,Q 2 dew. i Sao 1qd , SO-SO ►/ ✓ Fvoo 42. Comment: There is an overall feeling that the north side of Fort Collins would like to see a more open, lower density feel to the area. 43. Question: I'm interested in hearing about your short-term plans. Are you planning on submitting your development request in the near future? Answer: Yes, we are planning on submitting our development proposal on January 3, 1994. 44. Question: Where else have you developed? Answer: We are developing the Sandcreek Village at Willox Lane and Bramblebush Street. 45. Question: Will these homes be similar to the ones in Sandcreek Village? Answer: No, they will be slightly larger and more expensive. 46. Question: How tall will the homes be? Answer: They will be standard 2-story heights. 31. Question: Who is doing your traffic study? Answer: Gene Coppola from Denver, Colorado. 32. Question: Will the Ford Estate remain in the large lot configuration as shown on the concept plan? Answer: Yes, it will. 33. Comment: That will make the remainder of the development a relatively high density plan. 34. Question: Would you consider a larger lot proposal that may require a density variance to the City requirements? 35. Question: Do you find that it is possible to have a mixture of size and price homes? Answer: Within these small confines it will be difficult to create that kind of diversity. 36. Comment: The direction that this proposal is establishing, being a higher density, feels to be contrary to how the neighborhood wants to see this area continue to development. 37. Question: How will access to the development occur during the construction? Ford Lane cannot take the weight of construction traffic. Answer: An answer to that question will be decided during the development review process. 38. Question: Who is restricting additional access from this development to Country Club Road? Answer: The City is indicating that they will limit access to Country Club Road. 39. Question: How long is construction and buildout of this development anticipated to take? Answer: That depends on the economic climate and the market. 40. Question: The lot sizes in Pheasant Ridge Estates are generally larger than these proposed lots, most being in the 20,000 square foot range. Why can't this development be more like Pheasant Ridge Estates? 41. Comment: People are living up here on the north side because we want a more open feeling. \' 1 23. Comment: I am concerned about the number of lots and density proposed with this development. I would prefer this development to look more like the recently approved Pheasant Ridge Estates. 24. Question: What can the City do to make provisions for bicycle/pedestrian connections to the schools and parks in the area? How do kids get out of this development and get to the facilities to be uses? Answer: The City Parks & Recreation Master Plan has identified general trail routes that will be provided, as possible. The Transportation Division is always attempting to provide necessary bicycle/pedestrian connections between neighborhoods and facilities. The City will secure trails, as necessary and possible, with new development. 25. Question: What is the vacancy rate of single family homes in Fort Collins? 26. Question: Have other annexations been done simply by annexing street right-of-way to create the required contiguity? Answer: Yes, annexation of street right-of-way for contiguity has been done on several occasions in the past. 27. Question: What kind of utilities will be required for this development? Answer: The standard water, sanitary sewer, electric, gas, television cable, and telephone will be provided by the City, utility companies, or districts. 28. Question: We presently have low water pressure now, with ELCO. How will this development improve the situation? Answer: That will be determined with the district's review of the development request. 29. Question: There is concern about the safety of the homes on Ford Lane, from a traffic standpoint. Do you need two street intersections on Ford Lane? Answer: We can look at the layout of this development to see if the street network can be changed. 30. Comment: Most of the traffic will go north on Ford Lane to Country Club Road because you cannot get out of Spaulding Lane onto Highway 1. 13. Comment: At this time the water that collects would not drain out of the low area. The existing culverts are too high. 14. Question: Will the sewer main that exists in the area be adequate to serve this development? Answer: It is an old clay pipe that will have to be replaced. 15. Question: What will this do to the property values around the development? Who will be most affected? 16. Question: What size and type of homes are you planning to build? Answer: These will be 3-bedroom homes with basements, approximately 1,500 square feet (plus) in size. 17. Question: Will these be tract homes? Answer: There will be five models, or so, of homes for prospective buyers to choose from. 18. Question: Will these homes look like the existing homes on Ford Lane? Answer: They will probably look a little more updated. 19. comment: The lot sizes proposed, at 3 dwelling units per acre, are not consistent with properties in the surrounding area. 20. Comment: There is concern about the upgrading of Ford Lane and any improvements that may be required on the east side of the street, impacting the existing lots in Rimrock Subdivision. 21. Question: Has anybody looked at the impacts that this development will have on the school? Answer: The Poudre R-1 School District will be included in the review of the development proposal so that they can assess their needs and evaluate the existing and proposed school boundaries. 22. Question: Can the City deny this project based on the results of the traffic study or require the development to decrease the number of lots to diminish the traffic impacts? Answer: Policy, standards, and regulations give the City the ability to make those type of decisions. } 5. 7. EM go Answer: A traffic impact analysis must be done as part of the development review submittal to help determine the potential traffic impacts in the area with new development. Question: Will there be covenants regulating the size of the lots? Answer: Yes, there will be covenants developed for this project. The cost of the homes will be $110,000 to $140,000. Question: Who now owns this land? Answer: It is presently in an estate and under contract to Sandcreek Associates. Question: Will there be an environmental study done for this development? Answer: The City's Natural Resource Department will evaluate the potential wetlands/wildlife value of this property as part of the development review process. Question: You could propose a higher density development than you are showing now? Answer: Within the City a project with a higher density could be proposed. Question: Why have you picked this particular parcel of land for development? We came north to avoid development. 10. Question: Will Ford Lane be widened with this development? Answer: It will have to be improved to City standards if the land develops in the City. 11. Question: Will Ford Lane be continued south to Spaulding Lane? Answer: Currently, the plan is not to continue Ford Lane south with this development. 12. Question: We are very concerned with the drainage. We live at the bottom of the hill. How will the storm drainage (detention) area help me? Answer: The development will be made to drain to the detention area and be released at an acceptable rate. City of Fort Collins Date: Commui_ Planning Department and Environmental - Vices Neighborhood Information Meeting Minutes for SANDCREER ASSOCIATES December 15, 1993 Applicant: Ed Lawler/Pete Sherman Sandcreek Associates LLC P.O. Box 9684 Fort Collins, CO. 80525 City Planner: Steve Olt The potential applicants, Sandcreek Associates, have expressed an interest in developing a single family residential project on vacant land at the southeast corner of the intersection of Terry Lake Road (Colorado Highway 1) and Country Club Road. The purpose of this meeting was to introduce Mr. Lawler and Mr. Sherman, Sandcreek Associates, to the affected property owners and other potentially affected interests in attendance and enable them to ask questions about, express their concerns about, or express their support for the development proposal. The following questions, concerns, and responses were expressed at the meeting: 1. Question: You are going to put another road next to Ford Lane? Answer: We are going to increase traffic down Ford Lane by quite a bit. 2. Question: Ford Lane does not belong to the property owners to the east of the street? Answer: No, it is a County road. It is dedicated as a public street within the Rimrock Subdivision. 3. Question: In order for the land to be annexed into the City, is there no say by other property owners about the annexation? Answer: There will be a series of public hearings, three before the City Council and one before the Planning and Zoning Board, where anyone has an opportunity to express his or her position. 4. Question: Will all the traffic come in on Spaulding Lane? We cannot get out of Spaulding Lane now. 281 North College Avenue • P.O. Box 580 • Fort Collins, CO 80522-0580 • (303) 221-6750