Loading...
HomeMy WebLinkAboutFALCON RIDGE PUD - PRELIMINARY - 2-94F - SUBMITTAL DOCUMENTS - ROUND 1 - DRAINAGE REPORTFALCON RIDGE, P.U.D. THE MASS DIAGRAM FOR THE DETENTION BASIN 70 60 w 50 U l� y 40 D C fd U N 0 r 30 O T 20 O O 10 0 5.0 10.0 15 .0 20.0 25.0 30.0 35.0 40.0 45.0 50.0 55.0 60.0 70.0 80.0 90.0 100.0 110.0 120.0 135.0 150.0 165.0180.00 TIME IN MINUTES rt - Total Runoff Vol. 00 Allowable Discharge Vol. NOTE: Discharge plot does not appear linear since time are not uniformly spaced THIS MASS DIAGRAM TABLE IS FOR USE IN ESTABLISHING THE STORAGE VOLUME REQUIRED FOR THE 100 YR. STORM EVENT FALCON RIDGE, P.U.D. 0.45 = Runoff (c) 10.00 = Area (acres) 2.60 = Release Q(2)*** TIME (min) INTENSITY (in/hr) C*Cf*A (sq.ft.) RUNOFF (cu/ft) OUTFLOW (cu/ft) STORAGE (cu/ft) 5.0 7.00 5.63 11812.5 780.0 11032.5 10.0 7.00 5.63 23625.0 1560.0 22065.0 15.0 6.10 5.63 30881.3 2340.0 28541.3 20.0 5.20 5.63 35100.0 3120.0 31980.0 25.0 4.68 5.63 39487.5 3900.0 35587.5 30.0 4.15 5.63 42018.8 4680.0 37338.8 35.0 3.83 5.63 45241.9 5460.0 39781.9 40.0 3.50 5.63 47250.0 6240.0 41010.0 45.0 3.25 5.63 49359.4 7020.0 42339.4 50.0 3.00 5.63 50625.0 7800.0 42825.0 55.0 2.80 5.63 51975.0 8580.0 43395.0 60.0 2.60 5.63 52650.0 9360.0 43290.0 .0.0 _ <:2 33 5 63 55046 3 10920 0' 44126.3'. 80.0 2.05 5.63 55350.0 12480.0 42870.0 90.0 1.88 5.63 57105.0 14040.0 43065.0 100.0 1.70 5.63 57375.0 15600.0 41775.0 110.0 1.58 5.63 58657.5 17160.0 41497.5 120.0 1.45 5.63 58725.0 18720.0 40005.0 135.0 1.33 5.63 60598.1 21060.0 39538.1 150.0 1.20 5.63 60750.0 23400.0 37350.0 165.0 1.13 5.63 62926.9 25740.0 37186.9 180.00 1.05 5.63 63787.5 28080.0 35707.5 *** NOTE: -if C * Cf >= 1 , then C * Cf = 1 is used 4.9 1 0.801 1 520.001 1 0.45 = Runoff C 1.00 = Cf 2,10 1.25 =Cf 100 D. Pnt. Area (acres) C Cf I (2yr.) (in/hr) I (10yr.) (in/hr) I (100yr.) (in/hr) Basin 0 (cfs Comb. 0 (cfs) COMMENTS M.],.:: 1.15 0.45 2.20 4,41 1. 2 yr. runoff 0.45 4.60 2.W 10 yr. runoff 0.56 7.00 100 yr. runoff 0.45 C 1.00 =Cf(zlo) 1.25 =Cf(100) .,M D. Pnt. Area (acres) C Cf I (2yr.) (in/hr) I (10yr.) (in/br) I (100yr.) (in/hr) Basin Q (cfs) Comb. Q (cfs) COMMENTS 0.75 0.45 270 0.91 Oi 2 yr. runoff 0.45 4.70 1.59 10 yr. runoff 0.56 7.00 .. .... ..... 100 yr. runoff 0.45 = C 1.00 =Cf(zlo) 1.25 =Cf 100 -2-9511:. ILLLqLLLJ SU BBASI N::::.: O.c 000vr): :- x D. Pnt. Slope C Cf Length (feet) Overl-Tc (min.) Vel.Chan (ft/sec.) Tc Chan. (min. TcTotal (min.) COMMENTS 4.001 0.561 150.001 7.81 Tc (100) 1.401 1 920.001 1 2501 6 1 1391 LNGST.OVER'-+CHANNEL 0.45 = Runoff C 1.00 = Cf 2,10 1.25 =Cf 100 1 D. Pnt, Area (acres) C Cf I (2yr.) (in/hr) I (10yr.) (in/hr) I (100yr.) (i n /h r) Basin 0 (cls) Comb. 0 (cfs) COMMENTS 225 0.45 220 ....... 2211 2 yr. runoff 0.45 3.86 3.85 3i81 10 yr. runoff 0.56 6.20 7 100 yr. runoff 0.45 = C 1.00 =Cf(zlo) 1.25 =Cf(100) .SUBBASIN:,.:Ti O'CLL .......... D. Pnt. Slope C Cf Length (feet) OverLTc (min.) Vel.Chan (ft/sec.) Tc Chan. (min.) Tc Total (min.) COMMENTS 3.00 0.56 300.00 121 Tc (100) 1.60 330.00 2.75 20 LNGST. OVERL+CHANNEL 0.45 = Runoff C 1.00 = Cf Z10 1.25 =Cf 100 D. Pnt. Area (acres) C Cf I (2yr.) (in/hr) I (10yr.) (in/hr) I (100yr.) (in/hr) Basin Q (cfs Comb. 0 (cfs) COMMENTS L 4.85 0.45 220 4.80 11 2 yr. runoff 0.45 3.80 8.291 .-- �:: -:,:':.:8.3 10 yr. runoff 0.56 6.20 16.91 ..... 16a9 100 yr. runoff 0.45 = C 1.00 =Cf(zlo) 1.25 =Cf 100 11 1 = ^I t= kclu) u lis pcly:: D. Pnt. Slope 0 C Cf Length (feet) Overl-Tc (min.) Vel.Chan (ft/sec.) Tc Chan. (min. Tc Total (min.) COMMENTS 2-001 0.56 150.00 9.8 Tc (100) 0.401 430.00 1.50 4.8 ...... 14.6. LNGST. OVERL+CHANNEL 0.45 = Runoff C 1.00 = Cf 2,10 1.25 =Cf 100 D. Pnt. Area (acres) c Cf 1(2yr.) (in/hr) I (10yr.) (in/hr) I (100yr.) (in/hr) Basin Q (cfs) Comb. 0 (cfs) COMMENTS 1.82 0.45 2.15 1.76 2 yr. runoff 0.45 3.80 3 * 111 10 yr. runoff 0.56 6.10 6.24 6.211 100 yr. runoff 0.45 = C 1.00 =Cf(zlo) 1.25 =Cf(100) D. Pnt Slope c Cf Length (feet) Overl-Tc (min.) Vel.Chan (ft/sec.) Tc Chan. (min.) Tc Total (min.) COMMENTS 2.00 0.56 50.00 5.6 Tc (100) 0.40 700.00 2.25 5.2 1088 LNGST. OVERL+CHANNEL U.45 = Hunotr u 1.uu = ut 2,1u 1.25 =L;t 100 D. Pnt. Area (acres) C Cf I (2yr.) (in/hr) I (10yr.) (in/hr) I J100yr.) Cin/hr) Basin Q (cfs) Comb. Q cfs COMMENTS 0.88 0.45 2.4o 0.95 ',1.0j 2 yr. runoff 0.451 4.20 1.661 10 yr. runoff 0.561 6.80 3.37 ..... .... .... 3.4 100 yr. runoff 0.45 = C 1.00 =Cf Z10) 1.25 =Cf (100) SUBBASIN::::T.O.C.:.:..:.(loovr)::,::�:����� D. Pnt. Slope C Cf Length (feet) Overl-Tc (min.) Vel.Chan (ft/sec.) Tc Chan. (min.) Tc Total (min.) COMMENTS 2-501 0.56 480.00 16.2 Tc (100) 1.001 0.00 1.50 0.0 LNGST. OVERL+CHANNEL 0.45 = Runoff C 1.00 = Cf 2,10 1.25 =Cf 100 D. Pnt. Area acres ) c Cf I (2yr.) (in/hr) I (10yr.) (in/hr) I (100yr.) (in/br) Basin Q (cfs)cfs Comb. Q COMMENTS 0.80 0.45 2.10 0.90 2 yr. runoff 0.45 3.55 1.52 10 yr. runoff 0.56 5.70 3.05 . :. 3.0 100 yr. runoff 0.45 = C 1.00 =Cf(zlo) 1.25 =Cf(100) j.bu = Area(ac) mis page D. Pnt Area (acres) C Cf I (2yr.) (in/br) I (10yr.) (in/hr) I (100yr.) (in/hr) Basin Q (cfs) Comb. Q (cfs) COMMENTS 0.81 0.45 2.60 0 95 0 2 yr. runoff 0.45 4.55 1.66 . ... ..17 10 yr. runoff 0.56 7.00 3.19 32 100 yr. runoff 0.45 = C 1.00 =Cf(zlo) 1.25 =Cf(100) :SUBBASIN.:,:T (JWVr)',L.:.',: D. Pnt Slope %(min.) C Cf Length (feet ) OverLTc I Vel.Chan (tt/sec. Tc Chan. min. Tc Total min.) COMMENTS zoo 0.561 330.001 14.5 1 Tc 1w () 1.001 1 0.001 1 1.50 0.0 LNGST. OVERL+CFIANNEL 0.45 = Runoff C 1.00 = Cf Z110 1.25 =Cf 100 D. Pnt. Area (acres) C Cf I (2yr.) (in/hr) I (10yr.) (in/hr) I (100yr.) OWN Basin Q (cfs) Comb. Q (cfs) COMMENTS 1.01 0.45 215 0.98 f OS 2 yr. runoff 0.45 3.80 1.73 10 yr. runoff 0.0.566.10 3. 47 100 yr. ninoff 0.45 = C 1.00 =Cf(zlo) 1.25 =Cf(100) SUBBASIN T.00.'� 1".: (1 . . ... .. D. Pnt. Slope N C Cf Length (feet) OverLTc (min.) Vel.Chan (ft/sec.) Tc Chan. (min.) Tc Total (min.) COMMENTS F 2001 0.56 50.00 5.6 Tc (100) 0.901 495.00 2.00 4.1 9.8:1 LNGST. OVERL +CHANNEL 0.45 = Runoff C 1.00 = Cf 2,10 1.25 =Cf 100 D. Pnt. Area (acres) C Cf I (2yr.) (in/br) I (10yr.) (i n /h r) I (100yr.) (in/hr) -Basin Q cfs Comb. Q cfs COMMENTS F ... 0.69 0.45 2.00 0.62 2 r. runoff y 0.45 4.40 127 ........... 10 yr. runoff 0.56 7.00 2.721 27 100 yr. ninoff 0.45 = C 1.00 =Cf(zlo) 1.25 =Cf(100) Z51 = Area(aC) tnis page SUBBASIN.:... DEVELOPED RUNOFF COMPUTATIONS FROM RATIONAL METHOD 0 = C x Cf x I xA .. .... D. Pnt. Slope C*Cf Length OverLTc Vel.Chan Tc Chan. Tc Total COMMENTS (feet) (min.) (ft/sec.) (min.) 6.501 0.56 230.00 8.2 -(min.) Tc (100) 0.401 200.00 .1.50 2.22 _:i 104] LNG. ST. OVERL+CHANNEL 0.45 = Runoff C 1.00 = Cf 2,10 1.25 =Cf 100 D. Pnt. Area (acres) C Cf I (2yr.) Cin/br) I (I 0yr.) (in/hr) I (100yr.) (iin/br) Basin 0 cfs Comb. Q cfs COMMENTS 247 0.45 2.45 P-72 7,, ------- -------- - ---- - .... Z7 2 yr. runoff 0.45 3.50 3.89 11 10 yr. runoff 0.56 4.38 6.09 6.1 100 yr. runoff 0.45 = C 1.00 =Cf(zlo) 1.25 =Cf 100 ILLLLALLLJ :SUBBASIN: :T O.C.J100yr): D. Pnt. Slope c Cf Length OverLTc Vel.Chan I Tc Chan. I TcTotal _F_ COMMENTS %(feet) (min.) (ft/sec.) (min.) (min.) zoo 0.56 90.00 7.6 Tc (100) 0.40 460.00 1.50 5.1 . .. . ..... ... LNGST. OVERL+CHANNEL 0.45 = Runoff C 1.00 = Cf Z10 1.25 =Cf 100 SUBBASIW.T.O,C.:.4100vr) D. Pnt. Slope (0/0) C* Cf Length (feet) OverLTc (min.) I-Vel.Chan (fVsec.) Tc Chan. (min.) Tc Total (min.) COMMENTS 280 0.56 280.00 11.9 Tc (100) 0.40 235.001 1.50 26 LNGST. OVERL+CHANNEL 0.45 = Runoff C 1.00 = Cf 2,10 1.25 =Cf 100 D. Pnt. Area (acres) C *Of I (2yr.) (in/hr) I (10yr.) (in/hr) I (100yr.) (in/hr) Basin Q (cfs) Comb. 0 (Cfs)--. COMMENTS 1.33 0.45 2.15 1.2911:.,: 2 vr. runoff 0.45 3.80 2 27 23 10 yr. runoff 0.56 6.00 4.49 4,5 100 yr. runoff 0.45 C 1.00 =Cf(ZIO) 1.25 =Cf(100) 4.75 = Areatac) mis page DATE: March 1994 HISTORIC/DEVELOPED RUNOFF COMPS. 2/10/100 YR. STORMS FALCON RIDGE P.U.D. FOR: SANDCREEK ASSOCIATES BY: Stewart& Associates GENERAL NOTES: Velocity in a Channel per FIGURE 3-2 If C x Cf > = 1 then C x Cf = I (constants listed below) For design of the developed site runoff quantities Tc(I 00) was the basis for design IFLCOZZ, BALQFP6ANR0.wk3 SUBBASIN.:: O.0 (100yry: HISTORIC RUNOFF COMPUTATIONS FROM RATIONAL METHOD 0 = C x Cf x I xA ........ ... D. Pnt. Slope (0/0 C Cf Length (feet) Overl-Tc (min.) Vel.Chan (ft1sec.) Tc Chan. (min.) Tc Total (min.L_ COMMENTS 2-00 0.25 840.00 36.6 Tc (100) -0.20 1.00 0.00 1.50 0.0 . .. ...... ... ..... -36.6 LNGST. OVERL+CHANNEL =Runoff C 1.00 = Cf Z10 1.25 =Cf 100 D. Pnt. Area (acres) C*Cf I (2yr.) (in/hr) I (10yr.) (in/br) I (100yr.) (in/hr) Basin Q (cfs) Comb. 0 (CIS) COMMENTS 10.00 0.20 1.30 260 6 2 yr. runoff 0.20 2.30 4.60 4s6 10 yr. runoff 0.25 3.70 9.25 93 100 yr. runoff 0.20 = C 1.00 =Cf(zlo) 1.25 =Cf(100) SUBBASIN::.A O.C..: (1100yrY.I.I. D. Pnt Slope C Cf Length (feet) Overl-Tc (min.) Vel.Chan ft/sec.) Tc Chan. min. Tc Total (min.) COMMENTS zoo 0.25 840.00 36.61 Tc (100) 0.001 0.00 1.50 LNGST. OVERL +CHANNEL 0.20 = Runoff C 1.00 = Cf 2,10 1.25 =Cf 100 D. Pnt Area (acres) C Cf 1(2yr.) (in/hr) I (10yr.) 1 (10 r.) (in/hr) Basin 0 Comb. 0 (cfs) COMMENTS 10.00 0.20 1.30 _(in/hr) _(cfs) 2.60 26 2 yr. ninoff 0.20 Z301 4.60 . ............. 10 yr. runoff 0.25 3.70 9.25 9.31 100 yr. runoff 0.20 = C 1.00 =Cf(Z10) 1.25 =Cf 100 :X 20.00 = Area this Page Falcon Ridge P.M. Page 2 The site will be divided into 13 developed sub —basins that are shown on the preliminary grading and drainage plan. Both detention ponds will be used as sedimentation basins. Rock filters and straw bales will also be used to filter sediment. Disturbed areas that will not be constructed on soon will be reseeded. The preliminary grading and drainage report and the runoff calculations are included as a part of this report. If you have any questions regarding this project, please call. Sincerely, Richard A. Rutherford, P.E. & L.S. President jrr enclosures STEWART&ASSOCIATES Consulting Engineers and Surveyors March 31, 1994 Mr. Basil Hamdan Storm Water Utility City of Fort Collins P.O. Box 580 Fort Collins, Colorado 80522 Dear Basil: The following is the preliminary storm drainage report for Falcon Ridge P.U.D. The site is a proposed 21.5 acre single—family detached subdivision located in the Southwest '—, of Section 36, Township 8 Worth, Range 69 West of the 6th P.M. It is bounded on the north by Country Club Road, on the east by Rim Rock Subdivision and a large metes and bounds parcel, on the south by Spaulding Lane and on the west by a large metes and bounds parcel. The site is in the Dry Creek Major Drainage Basin; however, the southern half of the site is a part of the Evergreen Park Drainage Basin. The site has an existing residence which will become Lot 61. The site has a good cover of grass and weeds. The north half of the site drains westerly from Ford.Lane at an approximate slope of 2.9%. The north half historically drains into a low area on the easterly side of Colorado Highway 1 which will become a detention pond. From the low area, the existing runoff discharges into the southeasterly borrow ditch of Colorado Highway 1 and flows southwesterly to the Eaton Ditch. . The south half of. the site drains southerly to Spaulding Lane and then westerly in Spaulding Lane to the Eaton Ditch. It is proposed to detain the difference between the two—year historic runoff and the 100—year developed runoff from the north half in the low area and then continue to discharge into the borrow ditch at the historic rate. Likewise, it is proposed to detain the 100—year developed runoff in a new detention pond to be constructed in the Southwest corner of the site. It is planned to continue to discharge at the historic rate into the north curb of Spaulding• Lane. James H. Stewart and Associates. Inc. 103 S. Meldrum Street P.O. Box 429 Ft. Collins, CO 80522 303/482-9331 Fax 3031482 938 2 PRELIMINARY DRAINAGE REPORT FOR FALCON RIDGE P.U.D. MARCH 31, 1994 STEWART & ASSOCIATES. INC. 103 SOUTH MELDRUM STREET FORT COLLINS, COLORADO 80521 303/482-9331