Loading...
HomeMy WebLinkAboutNOKOMIS SUBDIVISION - FINAL - 8-94A - CORRESPONDENCE - STAFF'S PROJECT COMMENTS♦_ 7. Parkland fees of $779 per dwelling unit will apply to this development and the fees will be collected at the time of issuance of building permits. 8. The Homeowner's Association or the adjacent property owners will be responsible for the maintenance of the landscaping in the Redwood Street right-of-way. . 9. The non -vehicular access Tract "A" should be 10' wide to accommodate a bicycle/pedestrian trail and elbow room between the trail and the fences certain to be placed by the adjacent property owners on their lot lines. 10. Is the area of Lot 12, outside of the tract to be dedicated to the Stormwater Utility, large enough for a building site? 11. Presently the single point of access to this development, until Redwood Street is continued north to Willox Lane, is the intersection of Redwood Street and Conifer Street. What is the distance from that intersection to the cul-de-sac at the end of Nokomis Court? Is the distance within the maximum 900' limit for emergency access to any lot/home? If not, where will a secondary point of access be provided? This completes the review comments at this time. Additional comments may be forthcoming as the various departments and <reviewing agencies continue to review this request. Please be aware of the following dates and deadlines to assure your ability to stay on. schedule for the May 23, 1994 Planning and Zoning Board hearing: ****************************************************************** Plan revisions are due by 5:00 p.m. on May 5, 1994. Please contact me for the number of folded revisions required for each document. PMT's, renderings, and 8 folded copies of final revisions (for the Planning and Zoning Board packets) are due by 3:00 p.m. on May 16, 1994. Please contact me at 221-6750 if you have questions or concerns related to these comments. I would like to schedule a meeting with you as soon as possible, if necessary, to discuss these comments. le rely SOlt Project Planner xc: Ron Phillips Kerrie Ashbeck Advance Planning Stormwater Utility Transportation Parks & Recreation file/Project Planner Commur, Planning and Environmental ; Aces Planning Department City of Fort Collins April 25, 1994 Chris Wells USAG Capital & Leasing 1507 Buttonwood Drive Fort Collins, CO. 80525 Dear Chris, Staff has reviewed your documents for the Nokomis Subdivision - Final that were submitted on March 31, 1994, and would like to offer the following comments: 1. Public Service company has stated that the 9' utility easement adjacent to the street right-of-way also needs to apply to Tract "A", the non -vehicular access easement. 2. A copy of the comments received from U.S. West is attached to this letter. 3. Lot 10 will require approximately a 26' front setback to meet the 60' lot width. Lot 12 will require approximately a 32' front setback to meet the 60' lot width. 4. The Nokomis Subdivision - Preliminary Plat included 6 street trees along Redwood Street, commitment by the developer to provide one street tree per lot frontage, responsibility of the adjacent homeowners to maintain landscaping along Redwood Street, and fencing restrictions. A Final Landscape Plan, in conformance with the approved preliminary plans, must be submitted to the City for review. 5. The Water/Wastewater Department has indicated that they have forwarded their comments to your engineers on a set of red - lined utility plans. 6. A condition of Preliminary Approval stated that the existing Stormwater Utility easement located on Lots 111 12, 13, and the 201 wide drainage ditch easement located on Lots 10 and 11 must be dedicated to the City Stormwater Utility, with the final Nokomis Subdivision Plat, as a single tract of land. The Final Plat we are reviewing would not appear to comply with the condition of preliminary approval. 281 North College Avenue • P.O. Box 580 • Fort Collins, CO 80522-0580 • (303) 221-6750