Loading...
HomeMy WebLinkAboutNOKOMIS SUBDIVISION - FINAL - 8-94A - SUBMITTAL DOCUMENTS - ROUND 1 - EROSION CONTROL LETTER/REPORTSTEWART&A SSOCIATES Consulting Engineers and Surveyors March 31, 1994 Mr. Basil Hamdan Storm Water Utility City of Fort Collins P.O. Box 580 Fort Collins, Colorado 80522 Dear Basil: The following is the erosion control cost estimate for Nokomis Subdivision: 1. Straw Bale Dikes — 3 @ 100.00 $300.00 2. Rock Filters — 2 @ 100.00 200.00 3. Silt Fence — 220 L.F. @ 2.00 440.00 Total $940.00 Reseeding 5.05 Acres @ 0.0149/S.F. $3278.00 The amount of deposit for erosion control shall be 150% of $3278.00 which is $4916.50. If you have any questions regarding this cost estimate, please call. Sincerely, Richard A. Rutherford, P.E. & L.S. President jrr James H. Stewart and Associates, Inc. 103 S. Meldrum Street P.O. Box 429 Ft. Collins, CO 80522 303/482-9331 Fax 303/482-9382