Loading...
HomeMy WebLinkAboutNOKOMIS SUBDIVISION - FINAL - 8-94A - SUBMITTAL DOCUMENTS - ROUND 1 - LDGS ACTIVITY FORMon - RVW Activity A: ALL DEVELOPMENT CRITERIA ALL CRITERIA APPLICABLE CRITERIA ONLY CRITERION Is the criterion applicable? Will the criterion be satisfied? If no, please explain r A s a L" z Yes No Al. COMMUNITY -WIDE CRITERIA 1.1 Solar Orientation 1.2 Comprehensive Plan 1.3 Wildlife Habitat 1.4 Mineral Deposit 1.5 Ecologically Sensitive Areas reserved reserved 1.6 Lands of Agricultural Importance 1.7 Energy Conservation ✓ 1.8 Air Quality 1.9 Water Quality 1.10 Sewage and Wastes A2. NEIGHBORHOOD COMPATIBILITY CRITERIA 2.1 Vehicular, Pedestrian, Bike Transportation 2.2 Building Placement and Orientation 1�7- 2.3 Natural Features 2.4 Vehicular Circulation and Parkin 2.5 Emergency Access 2.6 Pedestrian Circulation VII I ✓ 2.7 Architecture 2.8 Building Height and Views 2.9 Shading 2.10 Solar Access t/ 2.11 Historic Resources 2.12 Setbacks 2.13 Landscape 2.14 Signs 2.15 Site Lighting 2.16 Noise and Vibration ✓ 2.17 Glare or Heat 2.18 Hazardous Materials A3. ENGINEERING CRITERIA 3.1 Utility Capacity 3.2 Design Standards 3.3 Water Hazards 3.4 Geologic Hazards