benchmarks.
Comment Number: 8 Comment Originated: 10/08/2018
10/08/2018: STEALTH PLAN: There are line over text issues. See redlines.
PROJECT DATUM: NAVD88
BENCHMARK # w/ DESCRIPTION
I W." ELEVATION:
BENCHMARK # w/ DESCRIPTION
op ELEVATION:
ASE NOTE: THIS PLAN SET IS USING NAVD88 FOR A VERTICAL
DATUM. SURROUNDING DEVELOPMENTS HAVE USED NGVD29
UNADJUSTED (PRIOR CITY OF FORT COLLINS DATUM) FOR THEIR
i5w, VERTICAL DATUMS.
IF NGVD29 UNADJUSTED DATUM (PRIOR CITY OF FORT COLLINaw
DATUM) IS REQUIRED FOR ANY PURPOSE, THE FOLLOWING EQ
SHOULD [E; 029 UNADUSTED (PRIOR CITY OF FORT
COLLI - X.XX,
Comment Number: 7 Comment Originated: 10/08/2018
10/08/2018: Please provide a City benchmark in addition to the local
benchmarks.
Topic: General
Comment Number: 1 Comment Originated: 10/08/2018
10/08/2018: Please revise the legal description as marked. See redlines.
Comment Number: 2 Comment Originated: 10/08/2018
10/08/2018: The Benchmark Statement has been revised. Please provide the
following information for the Benchmark Statement in the EXACT format shown
below.
PROJECT DATUM: NAVD88
BENCHMARK # w/ DESCRIPTION
ELEVATION:
BENCHMARK # w/ DESCRIPTION
ELEVATION:
PLEASE NOTE: THIS PLAN SET IS USING NAVD88 FOR A VERTICAL
DATUM. SURROUNDING DEVELOPMENTS HAVE USED NGVD29
UNADJUSTED (PRIOR CITY OF FORT COLLINS DATUM) FOR THEIR
VERTICAL DATUMS.
IF NGVD29 UNADJUSTED DATUM (PRIOR CITY OF FORT COLLINS
DATUM) IS REQUIRED FOR ANY PURPOSE, THE FOLLOWING EQUATION
SHOULD BE USED: NGVD29 UNADJUSTED (PRIOR CITY OF FORT
COLLINS DATUM) = NAVD88 - X.XX'.
Comment Number: 3 Comment Originated: 10/08/2018
Department: PFA
Contact: Andrew Rosen, 970-416-2599, arosen@poudre-fire.org
Topic: General
Comment Number: 1 Comment Originated: 10/03/2018
10/03/2018:
>The proposed location for the Emergency Access Easement shown on the
provided site plan is appropriate.
>As per prior conversation, the EAE can be dedicated at the time this project is
approved.
Comment Number: 2 Comment Originated: 10/03/2018
10/03/2018:
G/WAYFINDING
It is understood that the Chur eed s in a
location clearly visible on a contrasting background. Should the new facility be
designated its own address then it shall be located in a location clearly visible
ho, from the streetin no less than.8.°,tall numerals.
Department: Stormwater Engineering
Contact: Jesse Schlam, 970-218-2932, ischlam@fcgov.com
Topic: Erosion Control
Comment Number: 1 Comment Originated: 09/25/2018
09/25/2018: No Comment from Erosion Control at this time.
Contact: Wes Lamarque, 970-416-2418, wlamargue@fcgov.com
Topic: General
Comment Number: 2 Comment Originated: 10/12/2018
10/12/2018: No comments from the Stormwater Utility.
Department: Water -Wastewater Engineering
Contact: Wes Lamarque, 970-416.2418, wlamargueCfcgov.com
Topic: General
Comment Number: 1
10/12/2018: No Comments.
Comment Originated: 10/12/2018
Department: Technical Services
Contact: Jeff County, 970-221-65889 icounty@fcgov.com
Topic: Construction Drawings
MML�eeer: 4
Comment Originated: 10/08/2018
_pWment
fi�/08/2018Nu Pb
redlines.
--- — —
Comment Number: 5
Comment Originated: 10/08/2018
10/08/2018: Some of the sheet titles in the sheet index do
not match the sheet
titles on the noted sheets. See redlines.
Comment Number: 6
Comment Originated: 10/08/2018
10/08/2018: The Benchmark Statement has been revised.
Please provide the
following information for the Benchmark Statement in the EXACT format shown
below.
Comment Number: 3 Comment Originated: 10/09/2018
10/09/2018: The work in the right-of-way will require an excavation permit. The
following link will take you to the form that needs to be filled out and approved
before construction can begin in the right-of-way.
https://www.fcgov.com/engineering/inspection.php
Department: Light And Power
Contact: Tyler Siegmund, 970-416-2772, tsiegmund@fcqov.com
Topic: General
Comment Number: 1
Comment Originated: 10/09/2018
10/09/2018: Light and Power has electric facilities along the north side of
Horsetooth Rd that can be extended into the site. Light and Power crews will
intercept existing conduit along the Horsetooth frontage and trench primary
electric through the utility easement to the transformer. Modification fees will
apply to extend primary facilities into the site. Please contact me if you have
questions related to fees for the project.
Comment Number: 2 Comment Originated:
10/09/2018: Electric capacity fees, development fees, building site charges
and any system modification charges necessary to feed the site will apply to this
development. Please contact me or visit the following website for an estimate
of charges and fees:
http://www.fcgov.com/utilities/business/builders-and-developers/plant-investmen
t-development-fees
Comment Number: 3 Comment Originated:
10/09/2018: A commercial service information form (C-1 form) and a one line
diagram for the commercial meter will need to be completed and submitted to
Light & Power Engineering. A link to the C-1 form is below:
http://www.fcgov.com/utilities/business/builders-and-developers/development-
forms-g u ideli nes-regulations
Comment Number: 4
10/09/2018
10/09/2018
Comment Originated: 10/09/2018
Snow new eiectnc ime in the utir
Plans.
Transformer location will need to'
transformer must be placed within 10 ft of a drivable surface for installation an
maintenance purposes. The transformer Iso have a fr " of 11
Comment Number: 5 Comment Originated:
10/09/2018: Light & Power will need AutoCAD files of the approved site plan,
utility plans, and landscape drawings before design of the electric facilities will
begin.
Comment Number: 6 Comment Originated
10/09/2018: Please contact Tyler Siegmund at Light & Power Engineering if
you have any questions at 970.416.2772. Please reference our policies,
construction practices, development charge processes, and use our fee
estimator at http://www.fcgov.com/utilities/business/builders-and-developers
10/09/2018
10/09/2018
Fort Collins
Community Development and
Neighborhood Services
281 North College Avenue
PO Box 580
Fort Collins, CO 80522
970.221.6750
970.224.6134 - fax
fcgov. coWdevelopmenfreview
October 12, 2018
Mike Powers
Atlas Tower, LLC
302 Bluff St
Boulder, CO 80301
RE: Century Wireless Telecommunications Facility, FDP180022, Round Number 1
Please see the following summary of comments from City staff and outside reviewing
agencies for your submittal of the above referenced project. If you have questions about
any comments, you may contact the individual commenter or direct your questions through
the Project Planner, Clay Frickey, at 970-224-6045 or cfrickey@fcgov.com.
Comment Summary:
Department: Planning Services
Contact: Clay Frickey, 970-224-6045, cfrickey@fcgov.com
Topic: General
lumber: 1 ment Origi
10/07/2018: Please update the fence to show a
needed to get a modification for a T tall fence. .
Department: Engineering Development Review
Contact: Morgan Uhlman, 970416-4344, muhlmanCfcgov.com
Topic: General
Comment Number: 1 Comment Originated: 10/09/2018
10/09/2018: The fee for the easement dedications was submitted but the legal
documents for the easement dedication was not submitted. Please send me the
legal description and exhibit of the easement that is being dedicated. The
process for dedicating these documents can be found at this link:
(https://www.fcgov.com/engineering/devrev.php) See attached legal description and exhibit
Comment Number: 2 Comment Originated: 10/09/2018
spot elevations for the
ry will meet ADA requirements. Two at the top of the ramp and two at the