Loading...
HomeMy WebLinkAboutCENTURY WIRELESS TELECOMMUNICATIONS FACILITY - FDP - FDP180022 - SUBMITTAL DOCUMENTS - ROUND 2 - RESPONSE TO STAFF REVIEW COMMENTS10/08/2018: Please provide a City benchmark in addition to the local benchmarks. Comment Number: 8 Comment Originated: 10/08/2018 10/08/2018: STEALTH PLAN: There are line over text issues. See redlines. PROJECT DATUM: NAVD88 BENCHMARK # w/ DESCRIPTION I W." ELEVATION: BENCHMARK # w/ DESCRIPTION op ELEVATION: ASE NOTE: THIS PLAN SET IS USING NAVD88 FOR A VERTICAL DATUM. SURROUNDING DEVELOPMENTS HAVE USED NGVD29 UNADJUSTED (PRIOR CITY OF FORT COLLINS DATUM) FOR THEIR i5w, VERTICAL DATUMS. IF NGVD29 UNADJUSTED DATUM (PRIOR CITY OF FORT COLLINaw DATUM) IS REQUIRED FOR ANY PURPOSE, THE FOLLOWING EQ SHOULD [E; 029 UNADUSTED (PRIOR CITY OF FORT COLLI - X.XX, Comment Number: 7 Comment Originated: 10/08/2018 10/08/2018: Please provide a City benchmark in addition to the local benchmarks. Topic: General Comment Number: 1 Comment Originated: 10/08/2018 10/08/2018: Please revise the legal description as marked. See redlines. Comment Number: 2 Comment Originated: 10/08/2018 10/08/2018: The Benchmark Statement has been revised. Please provide the following information for the Benchmark Statement in the EXACT format shown below. PROJECT DATUM: NAVD88 BENCHMARK # w/ DESCRIPTION ELEVATION: BENCHMARK # w/ DESCRIPTION ELEVATION: PLEASE NOTE: THIS PLAN SET IS USING NAVD88 FOR A VERTICAL DATUM. SURROUNDING DEVELOPMENTS HAVE USED NGVD29 UNADJUSTED (PRIOR CITY OF FORT COLLINS DATUM) FOR THEIR VERTICAL DATUMS. IF NGVD29 UNADJUSTED DATUM (PRIOR CITY OF FORT COLLINS DATUM) IS REQUIRED FOR ANY PURPOSE, THE FOLLOWING EQUATION SHOULD BE USED: NGVD29 UNADJUSTED (PRIOR CITY OF FORT COLLINS DATUM) = NAVD88 - X.XX'. Comment Number: 3 Comment Originated: 10/08/2018 Department: PFA Contact: Andrew Rosen, 970-416-2599, arosen@poudre-fire.org Topic: General Comment Number: 1 Comment Originated: 10/03/2018 10/03/2018: >The proposed location for the Emergency Access Easement shown on the provided site plan is appropriate. >As per prior conversation, the EAE can be dedicated at the time this project is approved. Comment Number: 2 Comment Originated: 10/03/2018 10/03/2018: G/WAYFINDING It is understood that the Chur eed s in a location clearly visible on a contrasting background. Should the new facility be designated its own address then it shall be located in a location clearly visible ho, from the streetin no less than.8.°,tall numerals. Department: Stormwater Engineering Contact: Jesse Schlam, 970-218-2932, ischlam@fcgov.com Topic: Erosion Control Comment Number: 1 Comment Originated: 09/25/2018 09/25/2018: No Comment from Erosion Control at this time. Contact: Wes Lamarque, 970-416-2418, wlamargue@fcgov.com Topic: General Comment Number: 2 Comment Originated: 10/12/2018 10/12/2018: No comments from the Stormwater Utility. Department: Water -Wastewater Engineering Contact: Wes Lamarque, 970-416.2418, wlamargueCfcgov.com Topic: General Comment Number: 1 10/12/2018: No Comments. Comment Originated: 10/12/2018 Department: Technical Services Contact: Jeff County, 970-221-65889 icounty@fcgov.com Topic: Construction Drawings MML�eeer: 4 Comment Originated: 10/08/2018 _pWment fi�/08/2018Nu Pb redlines. --- — — Comment Number: 5 Comment Originated: 10/08/2018 10/08/2018: Some of the sheet titles in the sheet index do not match the sheet titles on the noted sheets. See redlines. Comment Number: 6 Comment Originated: 10/08/2018 10/08/2018: The Benchmark Statement has been revised. Please provide the following information for the Benchmark Statement in the EXACT format shown below. Comment Number: 3 Comment Originated: 10/09/2018 10/09/2018: The work in the right-of-way will require an excavation permit. The following link will take you to the form that needs to be filled out and approved before construction can begin in the right-of-way. https://www.fcgov.com/engineering/inspection.php Department: Light And Power Contact: Tyler Siegmund, 970-416-2772, tsiegmund@fcqov.com Topic: General Comment Number: 1 Comment Originated: 10/09/2018 10/09/2018: Light and Power has electric facilities along the north side of Horsetooth Rd that can be extended into the site. Light and Power crews will intercept existing conduit along the Horsetooth frontage and trench primary electric through the utility easement to the transformer. Modification fees will apply to extend primary facilities into the site. Please contact me if you have questions related to fees for the project. Comment Number: 2 Comment Originated: 10/09/2018: Electric capacity fees, development fees, building site charges and any system modification charges necessary to feed the site will apply to this development. Please contact me or visit the following website for an estimate of charges and fees: http://www.fcgov.com/utilities/business/builders-and-developers/plant-investmen t-development-fees Comment Number: 3 Comment Originated: 10/09/2018: A commercial service information form (C-1 form) and a one line diagram for the commercial meter will need to be completed and submitted to Light & Power Engineering. A link to the C-1 form is below: http://www.fcgov.com/utilities/business/builders-and-developers/development- forms-g u ideli nes-regulations Comment Number: 4 10/09/2018 10/09/2018 Comment Originated: 10/09/2018 Snow new eiectnc ime in the utir Plans. Transformer location will need to' transformer must be placed within 10 ft of a drivable surface for installation an maintenance purposes. The transformer Iso have a fr " of 11 Comment Number: 5 Comment Originated: 10/09/2018: Light & Power will need AutoCAD files of the approved site plan, utility plans, and landscape drawings before design of the electric facilities will begin. Comment Number: 6 Comment Originated 10/09/2018: Please contact Tyler Siegmund at Light & Power Engineering if you have any questions at 970.416.2772. Please reference our policies, construction practices, development charge processes, and use our fee estimator at http://www.fcgov.com/utilities/business/builders-and-developers 10/09/2018 10/09/2018 Fort Collins Community Development and Neighborhood Services 281 North College Avenue PO Box 580 Fort Collins, CO 80522 970.221.6750 970.224.6134 - fax fcgov. coWdevelopmenfreview October 12, 2018 Mike Powers Atlas Tower, LLC 302 Bluff St Boulder, CO 80301 RE: Century Wireless Telecommunications Facility, FDP180022, Round Number 1 Please see the following summary of comments from City staff and outside reviewing agencies for your submittal of the above referenced project. If you have questions about any comments, you may contact the individual commenter or direct your questions through the Project Planner, Clay Frickey, at 970-224-6045 or cfrickey@fcgov.com. Comment Summary: Department: Planning Services Contact: Clay Frickey, 970-224-6045, cfrickey@fcgov.com Topic: General lumber: 1 ment Origi 10/07/2018: Please update the fence to show a needed to get a modification for a T tall fence. . Department: Engineering Development Review Contact: Morgan Uhlman, 970416-4344, muhlmanCfcgov.com Topic: General Comment Number: 1 Comment Originated: 10/09/2018 10/09/2018: The fee for the easement dedications was submitted but the legal documents for the easement dedication was not submitted. Please send me the legal description and exhibit of the easement that is being dedicated. The process for dedicating these documents can be found at this link: (https://www.fcgov.com/engineering/devrev.php) See attached legal description and exhibit Comment Number: 2 Comment Originated: 10/09/2018 spot elevations for the ry will meet ADA requirements. Two at the top of the ramp and two at the