Loading...
HomeMy WebLinkAboutNORTHBROOK PATIO HOMES @ FAIRBROOKE PUD - PRELIMINARY - 7-94 - CORRESPONDENCE - STAFF'S PROJECT COMMENTS24. Staff also has concerns about the rear setback along Hampshire Road. According to the typical setbacks, a 5' setback would be allowed. Staff believes that you should maintain a minimum of 20' of setback from the back of the houses to the property line along Hampshire Road, again for privacy, and noise considerations. The building on Lot 6 is too close to the street. This concludes staff comments at this time. In order to stay on schedule for the March 28, 1994 Planning and Zoning Board hearing, please note the following deadlines: Plan revisions are due March 8th (4 sets of plans and written documentation responding to the above concerns), PMT1s (one PMT of each plan sheet), colored renderings, and 8 prints are due March 21st. Final mylars and other documents are due as soon as possible following the hearing. Please be aware that the development agreement and utility plans must be signed prior to the Planning and Zoning Board Hearing, for all PUD's. If not, a condition will be placed on the project giving you 30 days to finalize the plans and agreement, after which time, you must submit a request for an extension, to the Planning and Zoning Board. If you have any questions about these comments or would like to schedule a time to meet to discuss them, please contact me at 221- 6750. Sincer ly, .a- �. Kirsten Whetstone, AICP Project Planner cc Kerrie Ashbeck, Engineering Department Gary Mackey, Nebarado Construction 10. There should be a 15' utility easement along West Prospect Road. 11. Please refer to the utility and landscape plans for Water and Wastewater comments. 12. The design for Prospect Road must be submitted with the final, including flowline profiles, centerline profiles, cross- section every 50', etc.). You can use the approved Fairbrooke SID plans as a basis for the design and design the end sections for the interim. 13. The traffic study was not submitted. Please submit one prior with your revisions. 14. No soils information was submitted. Please submit a soils report with the final plans submittal. 15. See other comments on the utility and drainage plans sent to you under separate cover. 16. Please see attached comments from the Stormwater Utility. 17. Include the words "including all landscaping in the public ROW" in landscape plan note #4. I 18. Parkland fees are currently $779.00 per dwelling unit and are collected at the time of building permit issuance. 19. Along Prospect Road, the fence should taper, from the front of the house to the cul-de-sacs (from. 6' to approximately 31) opening up the cul-de-sacs. The fence should also be constructed for Lot 1 (tapering at the corner) and Lot 42 (see redlined plans). 20. Will fencing, other than perimeter fencing, be allowed in any other location? Staff recommends that no fencing be allowed' along the rear lot lines of Lots 7 thru 20. 21. A written variance request to the Solar Orientation Ordinance is required. A minimum of 65% of the lots must meet the definition of a solar oriented lot. Please provide this variance request with your plan revisions. Refer to Section 29-627 of the Code for information on variances. 22. The Planning Objectives incorrectly state that no variances will be required, please make reference to the Solar Orientation Ordinance variance request. 23. Staff recommends that you relocate Lot 7 to the east of Lot 8 to provide a greater setback from the arterial street, for noise and privacy considerations. Both Lots 7 and 8 could be wider lots to perhaps accommodate a slightly larger single family home, or possibly attached to adjacent duplexes.to form a tri-plex. and Environmental. y _ -vices Planning Department City of Fort Collins March 1, 1994 Dick Rutherford Stewart and Associates 103 S. Meldrum Street Fort Collins, CO 80522 Dear Mr. Rutherford, City Staff has reviewed your submittal for Northbrook Patio Homes PUD- Preliminary, and offers the following written comments: 1. Review of these plans should not be construed as a commitment that telephone facilities sufficient to serve this project are presently available. US West will provide telephone service in accordance with the rates and tariffs on file with the Colorado Utilities Commission. 2. Telephone facilities generally occupy_ rear lot utility easements, which must be located on terrain which permits trenching operations. 3. The developer is responsible for provision of all trench, street crossings, and ditch crossings for telephone facilities within the project, and the developer pays up front construction costs for facilities within the development. 4. Any relocation of existing telephone facilities required by these plans will be paid for by the developer. 5. Easements along Hampshire Road adjacent to the eastern ROW need to be such that from back of walk to the rear line of the easement there is a minimum distance of 131. 6. The 6' high wood fence with brick columns along Hampshire Road needs to be located east of the easement, such that gas mains and other utilities are not "fenced into" the backyards. 7. Street trees shall not be planted within 4' of gas lines. This is especially important to considering along Hampshire Road, where space is limited. 8. Columbine Cablevision would like to know what Tracts A, B, C, and D are designated for. Easements need to be provided across them, or designate them as utility easements. 9. The utility easements need to be more clearly shown. 281 North College Avenue • P.O. Box 580 • Fort Collins; CO 80522-0580 • (303) 221-6750