Loading...
HomeMy WebLinkAboutNORTHBROOK PATIO HOMES @ FAIRBROOKE PUD - PRELIMINARY - 7-94 - SUBMITTAL DOCUMENTS - ROUND 1 - DRAINAGE REPORTSTORM DRHIN::GE SYSTEM PRELIMINARY DESIGN DATA • Flow Timd street Pips Street Pipe ' c u 2 a !T(2 ca. � c ncE c'E y'E o. E �-u'E u- E= a, o¢"o¢ u�¢ a.. I 2 3 4 S. 6 7 B 9 iTo 11 171 13. 1 14 15 16 1 17 18 19 20 21 1 22 t Remarks ' •I 23 _--l�l'"i'�J��®®���•l..Ml®®�_�_I�IIIIIIIII♦I__I__IIIIIIII♦IIIIIIII♦ ���I�IIIII�IIIII�IIIIII�III�tl/Rl6��utwl����III-�I_I___ ' ■r,�r�s�ar.�n�n��nrtl�s�e�c'�r- • : • •nn��■�����n�� In�mfmmmm3�0 (I -Channel Flow G.IL�AItI�`I. .. - ..'i V� • r.�c,= . Street Capacity for 172 Street (3 - HN/D . 1.5 Use Inlet Control Nomograph �^ yi^a� G1o�c'r/ �-.1.r,c u , r: •Icy l.� i .. FAIR BROOKE S. 1. D. LOCATED IN SECTION 21. TOWNSHIP T NORTH, RANGE 69 WEST OF THE GTK PM, To Tw[ on or rowT coLan, coumn Or L1w1Y�Cm, CTATC Or COLOIAOO wN� 4 N- 8 DRAINAGE MAP 4 BASIN F-2 BASIN F-S i 4.85 AC, 15.28 AC.. :. 1 ' BAUDER ELEH. SCHOOL TRACT -BASIN F-Ga _ I HE 4A3 AG. BASIN F-3a BASIN F-I"^ 2.96AC. 11.78 AC b _ 1 BASIN F-9 ­ V j �t BASIN F-7a \ 7.26 AC.Tom / A 0.47 AL @TRACT r TRACT p 45 BASIN F-3b / BASIN F-7b ` ` BA51N F-(oc I L25 AC. '� 6.21 AG BASIN F-4�___-- . 2.5G AC. �-/ '��— BASIN F-ld TRACT C BASIN F-7c / 3.08 AC. \ TRACT I BASIN F-B , 13.46 AC. -._ - FAIRBROOKE S.I. D. N " DRAINAGE MAP " •wru■enoo¢ si.o. : in r•C>•vr units per acre. Other tracts are proposed for apartments on which the density will vary from 0 to 12 units per acre. The remaining tracts will be rased for a day care center$ a church and a detention pond. HYDROLOGIC ANALYSIS The Rational Method has been utili.:_ed to generate stormwater runoff flows for the 2- and 100-year dvvelopr d return period storms for the various tracts in Fairbrooke. Thin Drainage Map defines the basin boundaries and the design points, ,:ind Table 1 summarizes the results of the hydrologic analysi of tiu_se sub -basins. In addition, offsite stormwater from the Drown Farm development contributing runoff the the open channel along the south side of Fairbroolte west of Hampshire Road and the runoff in Hampshire Road have been estimated. It should be noted at. this point -that the calculated flows in Fairbro(-)ke are, approximate due to the fact -that the interior drainage patterns (street layout and building locations) within the individual tracts have not been established. The calculated runoff quanti.ti.ess, however, aSst.une fully developed conditions rasing a runorf ficient of (:).50 concurrent with the existing RL & RP zoning. The pat.t.erns of flow and the basin.configurations as containt=_-dherein should be maintained_ when actual development_occ_urs Jo ass .not adversely affect the improvements proposed with the! Fairbrooke Special Improvement pistrict. DETENTION The detention pond for Fairbrooke Special Improvement District will be designed by the City of Fort Collins Storrs Drainage. Division, tend is not included as part of this report. FINAL STORM DRAINAGE REPORT FAIRBROOKE S.I.D. FORT COLLINS, COLORADO GENERAL This report, in combination with the Drainage Map accompanying this report, the Fairbrooke S.I.D. Design Flans, the Brown Farm Preliminary Master Drainage Flan (Sheet 18 of 18) prepared by R. V* Lord and—aj.-q.soc.iates,,,__,L.n.c_,_, 6ygust,._1971, and Volume II "' re� urinary. Design Fceport--Diversion of Storm Water Runoff ThroughIrri-gati_on-Canals"from' Mulberry Street to Spring CreeE:--Fort Collins, Colorado", prepared by Resource Consultants, Inc., July, 19B0, is intended to describe the procedures and results of a . drainage study.of stormwater runoff generated by this project and adjacent properties. The proposed development along with the required drainage improvements are analyzed in accordance with the guidelines established by the City of Fort Collins' Storm Drainage Criteria Manual. INTRODUCTION The purpose of this !Study is to determine the quantity of stormwater runoff generated from the development of the various tracts within the Fairbrooke site, along with adjacent upstream property, the manner by which this runoff. will be accommodated by the Fairbrooke project, and how this relates to previous studies as outlined.above. SITE DESC:F:1 F'1 101N1 The site is loceited in the not.ht.!r 1/22 of Section 21, Township 7 North. Range 69 West, oV the 6th F': incipal• Meridian, Stat(i! of Colorado, County of l_ari.mer, Ci.t.y of Fort Collins. The Fairbrooke project eonsists.of 99.42 acre!e> metre or less and in bounded by Prospect Street on the north, Tivit Hill Poad on the east, The grown Farm development and Aspen Heights P.U.D. on the south, and the Foothillsv West development to the. west. The site is presently undeveloped and is used primarily for agricultural purposes. The. existing -drainage pattern is to the north E:,nd east at slope=_ ranging from 0.8 to 1.0 percent. The P1easa:it Val Ie.y and Lake Canal flows through the property from north to south. PROPOSED LAND USE The project is planned to consist of tracts on which varying proposed land usages will occur. Several of the tracts will have townhomes and patio homes with densities ranging from 6 to 7 1/2 J • FINAL DRAINAGE REPORT ISO ��...•� � � 1 .. P , ., FOR FAf;bf:00h:: ; S..1 . 1). �!n �� ;din 1, I� � :•i, .,. CITY OF FLIRT COLLINS COUP•1'TY OF LARIMER STATE OF COLORADO November,.198 Prepared by: Persons €< Associates Consulting Engineers 432 Link Laney Plaza Fort Collins, Colorado 80524 Project Number 83.•lEl WOR SrK5-ST 5L-D9L- clu'lFf3 1' �-',fi-17 DATA CONSTANTS Type / Location . NORTHBR OOK DR. / RES. FLOWLINE WIDTH (ft) CROSS SLOPE (ft) STREET SLOPE (ft) YARD SLOPE (ft) WALK DEPTH @ WIDTH (ft) CURB F.L. CURB HEIGHT (ft) CROWN ELEV. REDUCT'N FACTOR 36.001 0.02001 0.0100 0.020 5.00 0.86 . 0.50 100.00 0.80 CALCULATED CONSTANTS WETTED PERIMETER WEIGHT'D MANNINGS TOP WIDTH AREA OF FLOW 97.017 0.0258 96.00 41.98 CALCULATED HYDRAULICS THEO. I ALLOW CAPACITY cfs CAPACITY WATER ELEV. VELOCITY s 138.371 110.701 100.50 1.14 FEBRUARY1994 Manning's Equation for the Theoretical Capacity of Non - Symetrical Triangular Section 0.250 =Side Slope 1 1 0.060 = Manning's (n) 0.250 = Side Slope iiiiiiiiiiiiiiiiiiiillllllllllllllllll7 This Section 1 0.039 = Channel Slope Flow Depth Intercept Area 1 Intercept (ft/ft) (ft from CL) (sq/ft) (ft from CL) 0.80 3.20 1.28 3.20 90. 360 1 62 3.60 1.00 4.00 2.00 4.00 1.20 4.80 2.881 4.80 52 1.40 5.601 3.92 5.60 1 50& �61 00 � - .4.50 ... .60 -6 4-01 5.12 TTO 1 a70 L6'80 S.78 >: 6:80, 0.200 =Side Slope 1 0.060 = Manning's (n) 0.200 =Side Slope 2 This Section OUTFALL PAN 0.01 = Channel Slope 2 Total Discharge Intercept Areal Intercept t This Section (cfs) (ft from CL) (sq/ft) (ft from CO 1.28 6.66 4.00 1.60 4.00 .6 2 . . ...... .......... 0 3 4 50 2.00 12.08 5.00 2.50 5.00 57: 3 M .50 2.88 19.64 ..... .. --- -TOO 3.60 ro�o 3.38..r..:�;:;...-:::. ... ............. . ... . :r,,.,... :;��24.311� 6.50:: 4.22: . ......... 6.50 3.92 -Z9-63 7.00 4.90 7.00 35.6y. .-:7. 5G 5 63 7 50. 5.12 n 8.00 6.40 8.00 5. 49.72 8.501 -7.23 ... 8.501- )TE: - The manning's (n) Value is between the typical - All 12'easements are 12'for draiange pans 1Z4. 1 C7(-S I. -5-�5 -5Z -I eks TYPICAL 2-in deep S. BACKLOT PAN 2 Total Discharge This Section (cfs) 1.60 4.1 2. 50 7.70 4.901 18.89 S63. ....... .. . ...........22.7,0 6.401 26.96 ,75 - 8, 1 Cis i1? DRAINAGE CRITEF MANUAL 50 30 t-- 2 0 Z w U a °' 10 z III a 0 5 w � 3 0 U 2 w F— a kz 1 RUNOFF All PUFAI .2 .3 .5 1 2 3 5 10 20 VELOCITY IN FEET PER SECOND FIGURE 3-2.. ESTIMATE OF AVERAGE FLOW VELOCITY FOR I USE WITH. THE RATIONAL FORMULA. *MOST FREQUENTLY OCCURRING "UNDEVELOPED" LAND SURFACES IN THE DENVER REGION. REFERENCE: "Urban Hydrology For Small Watersheds" Technical Release No. 55, USDA, SCS Jan. 1975. 5 -1-84 URBAN DRAINAGE & FLOOD CONTROL DISTRICT STEWART&ASSOdATES 103 . MEL9331DRFUM, 48 J COLLINS, CO 80521 PH.Consulting Engineers and Surveyors 1 I By: Date: 2' -�1 Client: �l'_f� A iZ� l�D C�-t• Sheet No. --L of Project: 0,2�l� 32oa` �p�� 1 \aC Subject: P�A'�1 IJfI 1� i F3►iS� ti � P\I2.�=1� � Ou��c..ru� (C�-i V e.�cc�� 6 2,-56 go'(2-2)/ 4 1o(1T,� i 2.03 ISS'(2%)/c}oo ( I'7n, 8� (2%s(t��� /z.o I � I i i � I DEVELOPED RUNOFF COMPUTATIONS FROM RATIONAL METHOD Q =CxCfx[xA SUBBASIN T.O.C. 4100 r ...... D. Pnt. Slope 010 C Cf Length feet Overt Tc min.) Vel.Chan (ft/sec.) Tc Chan. (min.) Tc Total (min.) COMMENTS 2.001 0.75 135.00 6.0 Tc (100) 1.001 400.00 2.001 3.3 LNGST. OVERL.+CHANNEL -0.60 = Runoff C 1.00 = Cf 2,10 1.25 =Cf 100 1 D. Pnt. Area (acres) C Cf I (2yr.) On/hr) 1 (1 Oyr.) (in/hr) I (100yr.) in/hr Basin 0 (cfs) Comb. Q WS) COMMENTS D 2.031- 0.601 2.601 3.17 3.2 2 yr. runoff 0.601 4.50 5.48 10 yr. runoff 0.75 7.00 10.66 10.7] 100 yr. runoff 0.60 = C 1.00 =Cf 2,10 1.25 =Cf(100) SUBBASIN, .. . ... .... D. Pnt. Slope N C Cf Length (feet) Overt Tc (min.) Vel.Chan (ft/sec.) Tc Chan. (min.) Tc Total (min.) COMMENTS 2.001 0.75 50.00 3.7 Tc (100) 1.001 530.00 2.90 3.0 is Z.7. LNGST. OVERL.+CHANNEL 0.60 = Runoff C 1.00 = Cf 2,10 1.25 =Cf 100 D. Pnt. Area (acres) C *Cf I (2yr.) (in/hr) I (10yr.) (in/hr I (100yr.) in/hr Basin 0 cfs Comb. Q (cfs) COMMENTS 0.881 0.60 2.85 1.50 2 yr. runoff 0.60 5.00 2.64 2;6 1 10 yr. runoff 1 0.75 7.00 M44.62 4.6 1 100 yr. runoff �0.60 = C 1.00 =Cf 2,10 1.25 =Cf(100) DEVELOPED RUNOFF COMPUTATIONS FROM RATIONAL METHOD Q =CxCfx I xA SUBBASIN::.T O.C,- 100 D. Pnt.. Slope C Cf Len gth I Overt Tc Vel.Chan Tc Chan. Tc Total COMMENTS el I (min.) (ft/sec.) (min.) (min.) X, A 7 2.001 0.75 50.001 - 3.7 Tc (100) 1.001 340.001- 2.00 2.831:.... .. .... -,, ......-x 6.51 LNGST. OVERL.+CHANNEL ,0.60 = Runoff C 1.00 = Cf 2,10 1.25 =Cf 100 D. Pnt. Area (acres) C *Cf I (2yr.) (in/hr) I (10yr.) (in/hr) I (100yr.) (in/hr) Basin Q cfs Comb. Q (cfs) COMMENTS -0.71 0.60 2.901 1 1.24 F77777T41 2 yr. runoff 0.60 5.001 2.13 21 10 r. runoff 0.751 1 1 7.00 3.73 100 yr. runoff 0.60 = C 1.00 =Cf 2,10 1.25 =Cf(100) SUBBASIN T.O.C:: (1 00yr)-, D. Pnt. Slope C • Cf Length I OvierLTc �Vel.Chan Tc Chan. Tc Total COMMENTS (0/0 (feet) I (min.) I (ft/sec.) (min.) (min.) R 2.001 0.751 80.001- 4.61 Tc (100) 1.001 1 490.001- 1 2.00 4.1 -,87: LNGST. OVERL.+CHANNEL 0.60 = Runoff C 1.00 = Cf 2,10 1.25 =Cf 100 D. Pnt. Area (acres) C *Cf I (2yr.) On/hr) I (10yr.) (in/hr) I (100yr.) Basin Q s Comb. Q cfs) COMMENTS B 2.56 0.601 2.601 3.99F77770 2 yr. runoff 0.60 4.50 6.91 10 yr. runoff 0.751 17.00 13.44 134 100 yr. runoff 0.60 = C 1.00 =Cf 2,10 1.25 D. Pnt. Slope c Cf Length (feet) Overt Tc (min. Vel.Chan (ft/sec.) Tc Chan. min.) c TotalCOMMENTS (min.) C: 2.00 0.75 65.00 4.2 Tc (100) 0.50 565.00 1.501 6.3 -110v5.j LNGST. OVERL. +CHANNEL 0.60 = Runoff C 1.00 = Cf 2,10 1.25 =Cf 100 D. Pnt. Area (acres) C *Cf I (2yr.) (in/hr) I (10yr.) On/hr) I 100yr.) (in/hr) Basin Q cfs Comb. Q (cfs) COMMENTS -1.17 0.60 2.48 1.74 1.1-1......., -.1:1. 2 yr. runoff 0.60 4.30 3.02 3 0 10 Y . runoff 1 0.75 6.90 6.051 100 yr. runoff 0.60 = C 1.00 =Cf 2,10 1.25 =Cf 100 4.44 = Area(ac) this page DATE: FEBRUARY 1994 DEVELOPED RUNOFF COMPUTATIONS FOR 2/10/100 YR. STORMS NORTHBROOK PATIO HOMES P.U.D. FOR: Nebarado Construction BY: Stewart & Associates GENERAL NOTES: Velocity in a Channel per FIGURE 3-2 If C x Cf > = 1 then C x Cf = 1 (constants listed below) For design of the developed site runoff quantities Tc(l 00) was the basis for des ! ign BANBROKRO.wk3 HISTORIC RUNOFF COMPUTATIONS FROM RATIONAL METHOD Q = C x Cf x I x A SUBBASIN T.O.G 100 r D. Pnt. slope C Cf I- Length feet Overt Tc (min.) Vel.Chan (ft/sec.) Tc Chan. (min.) Tc Total (min.) COMMENTS 0.25 540.00 36.9 Tc (100) 1.00 0.00 0.501 0.0 .36.9. LNGST. OVERL.+CHANNEL 0.20 = Runoff C 1.00 = Cf 2,10 1.25 =Cf 100 1 D. Pnt. Area (acres) C *Cf I (2yr.) (in/hr) I (10yr.) (in/hr) I (100yr.) (in/hr) Basin Q (cfs) Comb. Q (Cfs) COMMENTS 6.30 0.201 1.281 1.61 :1:6 2 yr. runoff 0.201 2.29 2.89 q, Q 10 yr. runoff 0.251 3.67 5.78 100 r. runoff y 0.20 = C 1.00 =Cf 2,10 1.25 =Cf(100) SUBBASIN::J.O.C.:....(100 D. Pnt. Slope N C Cf Length (feet) Overt Tc (min.) Vel.Chan (ft/sec.) Tc Chan. (min.) c TotalCOMMENTS (min.) I b 1.00 0.25 95.001 15.5 Tc (100) 1.000.00 0.00 > 95i5] UNGST. OVERL. +CHANNEL 0.20 = Runoff C 1.00 = Cf 2,10 1.25 =Cf 100 D. Pnt. Area (acres) C CF--F I -(2yr.) (in/hr) I (10yr.) (in/hr) 1 (1 00yr.) Cin/hr) Basin Q (cfs)cfs Comb. Q COMMENTS 1.051 0.201 2.10 1 0.44 2 yr. runoff 0.20 3.70 0.76 -0811 10 r. runoff 0.25 5.95 1.56 100 yr. runoff 0.20 = C 1.00 =Cf 2,10 1.25 =Cf 100 2: 7.35 = Project Area (ac) 12-YEAR HISTORIC 2,05] PRELIMINARY HYDROLOGIC SUMMARY NORTHBROOK SUBDIVISION ...TOTAL DEVELOPEDRUNOFF'... 11.61 2 yr. runoff 20.21 10 yr. runoff -38.51 100 yr. runoff NORTHBROOK DRIVE PAN::.--,,-- 5.6 F-2 yr. runoff 9.71 10 yr. runoff 18.81 100 yr. runoff ,7.35 = Total project area(ac) Basins 13, 0(1/2) ADDITIONAL FLOWTO INLET... 1�2 2 2 1 :Fyr.rrunoff 0 y runoff 3.71 100 yr. runoff OUTFALL PAN NORTHIBROOKDRIVE 2 yr. runoff ,.4E ,2 10 r. runoff 24.11 100 yr. runoff Basins A (HAMPSHIRE ROAD) Basin A, U NORTHBROOK: CO URT PAN. -I,-, 2 2 r. runoff �251 Toy_ yr. runoff 6.7 100 . runoff i3asinsB(1/2) l::AL;H zjiuL W.:PROSPECT ROAD] 1.51 2 yr. runoff 2.61 10 yr. runoff 4.61 100 yr. runoff Basin E BACKLOT PAN 1.7 2 r, runoff 3.01 yr. runoff 6.11 100 yr. runoff Basin L; HISTORIC.. RUNOFF:::........... 10yr.runoff T:34 100 r. runoff Northbrook Patio Homes P.U.D. Page 2 The ground cover of the filled portion of the site varies from poor to fair, and the ground cover of the unfilled portion is good grass. However, all the unfilled portion will be stripped and filled. The resultant bare ground will be reseeded if the units are not started on that part of the P.U.D. soon after the fill is placed. Straw bale barriers and rock filters will be placed at the discharge points into the pond. A silt fence will be placed along the south and east property lines of the P.U.D. The storm drainage plan any questions Sincerely, water runoff calculations and the preliminary grading and are enclosed as a part of this preliminary report. If you have regarding this report, please call. 62 Lam. 0 Richard A. Rutherford, P.E. & L.S. President jrr enclosures STEWART&ASSOCIATES Consulting Engineers and Surveyors February 7, 1994 Mr. Basil Harridan Storm Water Utility City of Fort Collins P.O. Box 580 Fort Collins, Colorado 80522 Dear Basil: The following is the preliminary.storm drainage report for Northbrook Patio Homes P.U.D., Fort Collins, Colorado. The site contains 6.12 net acres and 7.07 gross acres, including half of the Prospect Road and Hampshire Road rights —of —way: It is located at the Southeast corner of West Prospect Road and Hampshire Road in the Northeast ; of Section 21, Township 7 North, Range 69 West of the 6th P.M. It is Tract "G" and a part of Tract "H", Fairbrooke S. I. D. The site is in the Canal Importation Study Area. It is bounded on the north by West Prospect Road, on the east by the Fairbrooke Detention Pond, on the south by Fairbrooke Subdivision, Second Filing, and on the west by Hampshire Road. The westerly 150 feet of the site has been filled. The site slopes from west to east to the Fairbrooke Detention Pond at approximately 1.5%. There is an existing drainage channel approximately 400 feet south of Prospect Road that flows easterly from the sump inlets on Hampshire Road to the Fairbrooke Detention Pond. The proposed P.U.D. will have 42 patio homes in 21 two —unit buildings. It is proposed to fill the eastern part of the site to fit the western 150 feet. The existing 24—inch storm drain will be extended south along the east side of Hampshire Road to a proposed 20—foot drainage easement along the south line of the site. The 42—inch storm drain will then be extended easterly to the detention pond. A 4.0 foot wide concrete pan will also be constructed in the 20—foot easement to carry the major storm flows and the surface runoff from the rear yards of the units on the south side of Northbrook Drive and the rear yards of the lots in Fairbrooke Subdivision, Second Filing, to the Detention Pond. The site will be divided into five sub —basins. The runoff from Sub —Basins "A" through "D" will flow directly into the Detention Pond in the 24—inch pipe and two concrete pans. Sub —Basin "E" which is the south one—half of West Prospect Road will enter the pond east of this P.U.D. Sub —Basins "A" through "E" are Basin F-10 and part of Basin F-11 of the Fairbrooke S.I.D. Drainage Report prepared by Parson and Associates and dated November 1983. Relevant pages of that report are included in the appendix of this report. James H. Stewart and Associates, Inc. 103 S. Meldrum Street P.O. Box 429 Ft. Collins, CO 80522 303/482-9331 Fax 303/482-9382 PRELIMINARY DRAINAGE REPORT FOR NORTHBROOK PATIO HOMES P.U.D. FEBRUARY 7, 1994 STEWART & ASSOCIATES. INC. 103 SOUTH MELDRUM STREET FORT COLLINS, COLORADO 80521 303/482-9331