HomeMy WebLinkAboutNORTHBROOK PATIO HOMES AT FAIRBROOKE PUD - FINAL - 7-94B - CORRESPONDENCE - STAFF'S PROJECT COMMENTSr v 8. Please refer to additional comments on the redlined plans, sent to the project engineer. 9. Please indicate that a variance to the solar orientation ordinance was approved by the Planning and Zoning Board, at the time of the preliminary hearing. There should be a note on the site plan to this effect. 10. Please contact City Parks Department or Stormwater to discuss the construction of the connecting walk in the City detention area. If this walk could be 7' rather than 6' it would be more useable, but not knowing what the existing walk is, it is hard to say what Stormwater or Parks would prefer. The short walk on your property should stay at 8' as it will be between houses. 11. Staff recommends that there be more variety, in terms of colors, roof lines, windows, architectural character, etc. than at the Victorian Gables Patio Homes. This project needs to blend into a single family neighborhood with diversity of homes and colors, as compared to the Victorian project which was blending with a monotone multi -family complex. This concludes staff comments at this time. In order to stay on schedule for the August 22, 1994 Planning and Zoning Board hearing, please note the following deadlines: Plan revisions are due August 3rd (3 sets of plans and written documentation responding to the above concerns), PMT's (one PMT of each plan sheet), colored renderings, and 8 prints are due August 15th. Final mylars and other documents are due as soon as possible following the hearing. Please be aware that the development agreement and utility plans must be signed prior to the Planning and zoning Board Hearing, for all Final PUD's. If not, a condition will be placed on the project giving you 30 days to finalize the plans and agreement, after which time, you must submit a request for an extension, to the Planning and zoning Board. If you have any questions about these comments or would like to schedule a time to meet to discuss them, please contact me at 221- 6750. Sincerely, dtL #--�/t • Kirsten Whetstone, AICP Project Planner cc Kerrie Ashbeck, Engineering Department Stewart and Associates Commui. ✓ Planning and Environmental deices Planning Department City of Fort Collins �r1to :2 July 6, 1994 Gary Mackey Nebarado Construction 6804 Aaron Drive Fort Collins, CO 80524 Dear Mr. Mackey, City staff has reviewed your submittal for the Northbrook Patio Homes PUD final, and offers the following written comments: 1. Review of these plans should not be construed as a commitment that telephone facilities sufficient to serve this project are presently available. US West will provide telephone service in accordance with the rates and tariffs on file with the Colorado Utilities Commission. 2 Public Service Company has the same comments as at preliminary. The easement along Hampshire Road adjacent to t3� the east ROW needs to be such that, from the back of walk to the rear line of easement, there are 13' at a minimum. 3. The 6' high wood fence with brick columns along Hampshire Road needs to be east of the easement, such that gas mains and other utilities are not fenced in backyards. (Perhaps you could discuss with PSC that there are no side yard fences and that the utility company can easily access their utilities in the backyards and that the utilities are not really going to be fenced in.) 4. Street trees shall not be planted within 4' of gas lines. l This is especially important along Hampshire Road, where space is limited. (If you believe that a utility coordination rIJ meeting would be helpful, please contact Kerrie Ashbeck at the Planning Department, 221-6750). 5. Please make sure the street trees do not interfere with street t/ lighting. See attached information sheet for streetlight/street tree locations. 6. The soils report recommends a subdrain system for basements and utility installation, but no design or hydrologic study was included with the submittal. 7. Existing fill material needs to be tested for compaction, especially in areas under proposed streets. 2S1 North Colle-e Avenue • P.O. Box 580 • Fort Collins. CO 80511-0580 • (303) 221-67:50