Loading...
HomeMy WebLinkAboutWESTBURY PUD, SECOND FILING - FINAL - 11-94B - CORRESPONDENCE - OTHER WATER AND OR SANITATION DISTRICTSTO: FROM DATE: RE: MEMO Mr. Steve Olt, City of Fort Collins Planner Mr, Terry W. Farrill, Systems Engineer March 27, 1995 1 1-94B Westbury PUD, 2nd Filing South Fort Collhis Sanitation District The Fort Collins - Loveland Water District and the South Fort Collins Sanitation District have reviewed the above mentioned project. The plans did not include the minimum requirements such as, but not limited to, the following: The general notes should indicate that the water and sanitary sewer construction should conform to District standards. The mmirnum cover over water lines is five (5) feet. The street names are missing. The stationing on the profiles is missing. Utility crossings on the profiles are not shown. The sanitary sewer lines are to maintain a minimum of three (3) feet from the curb, depending on depth. The drawings are to be corrected to provide minimum requirements and submitted for review at that time. Please do not hesitate to contact me at 226-3104 if you have any questions or require additional information. xc: Mr. Michael D. DiTulho, District Manager