Loading...
HomeMy WebLinkAboutNOKOMIS SUBDIVISION - PRELIMINARY - 8-94 - SUBMITTAL DOCUMENTS - ROUND 1 - DRAINAGE REPORT+ AREA"8 (off drowlna) - AREA "6 AREA I 3 A BRISTLECONE) DR. AREA we CONIFER ST. N SCALE: 1°= 8001 s.7 AREA ��..•_i . iAc-Ft: �s 7•�D H -� Ac F �.. J n _20 ��p(0\ I AREA I A**.I I 38 uo 216 217 _1 •6.4 �Ac-Ft i �I 213 IAc-IF ILLOX Northerly Release Point 01------ f w w AREA "2 AREA "OA —' a- — 130 Z o_ cn CONIFER ST. 105 220 I 101 -� 7�... 9.5 233 Ac-Ft 0 Ac-Ft 20 �. 214 AREA 120 } g AREA "OB N GP �... 14.2..E o k4' Ac-Ft �P Y\ Southerly Release Point 205� DRY CREEK NE DR. NOTES: 1) SHAPE a SURFACE AREA OF PONDS APPROXIMATE ONLY. 2) POND NUMBERS ARE SAME AS BASIN NUMBERS. LEGEND BASIN . BOUNDARY ---- STORM SEWER OR CULVERTS 123 OPEN CHANNEL W/CONVEYANCE CODE USED IN TABLE I. C DETENTION PONDS Ac-Ft G11g1011] I Release ' Point 1 IIIIIIIMI P TITLE EVERGREEN PARK FIGURE 4[ °°1`=o'ti, r FINAL DRAINAGE PATTERN 2 No Text FEBRUARY1994 Manning's Equation for the Theoretical Capacity of Non-Symetrical Triangular Section 0.200 = Side Slope 1 0.060 = Manning's (n) 0.200 = Side Slope 2 I This Section 0.200 = Side Slope 1 0.200 = Side Slope 2 0.01 = Channel Slope TYPICAL 2-in deep 1 0.004 = Channel Slope 0.060 = Manning's (n � 1 This Section TYPICAL 2-in deep Flow Depth Intercept Area 1 Intercept Area 2 Total Discharge Intercept Area 1 Intercept Area 2 arc tal Discharge [This ft/ft ft from CL s /ft ft from CL s /ft This Section cfs ft from CL s /ft ft from Cl s /ft Section 0.50 2.501 0.631 2.50 0.63 1.21 2.50 0.63 2.50 0.631 0.77 0.601 3.00 ! 0.901 3.00 0.90 1.97 3.00 0.901 3.00 0.901 1.25 0.701 3.501 1.23 3.501 1.231 2.97 3.50 1.231 3.50 1.231 1.88 0.801 4.001 1.60 4.00 1.60 4.25 4.00 1.60' 4.00 1 .601 2.69 0.901 4.501 2.03 4.50 2.03 5.81 >`: 4.50 2.03I 4.50 2.031 3.68 00 5.00 j 2.50 5.00 2.50 7.70 5.00 2.50 5.00 2.50 4.87 101 5.501 3.03 5.50 3.03 9.93 _ ` 5.50 3.031 5.50 3.03 6.28 M1.20 6.001 3.60 6.00 3.60 12.52 6.00 3.60 6.00 3.60 7.92 30 6.501 4.221 6.50 4.22 15.50 €#' 6.50 4.221 6.501 4.221 9.8040 7.001 4.90' 7.00 4.90 18.89 7.00 4.90 7.00 4.90 11.94 - All 12' easements are 12' for draipnge pans ND + �SDU-r H t aCK .mot PVb Na,�� N z � N ��cK► I" �r�NS ZIT C A`�'= W�pS CASE _ r / `7 �.� tC Li � J ST�;✓1%fi 5�-DAL, v r 4 r 1=I.UWI.I r- i/17(I+ 1 I /A[, �"H i —��YA1zn 5L� DATA CONSTANTS Type / Location NAKOMIS CT. / RESIDENTIAL FLOWLINE CROSS WIDTH (ft) SLOPE (ft) F STREET SLOPE (ft) YARD SLOPE (ft) WALK WIDTH (ft) DEPTH @ CURB F.L., CURB HEIGHT (ft CROWN REDUCT'N ELEV. FACTOR 36.001 0.02001 0.00401 0.0201 5.00 0.861 0.501 100.001 0.80 CALCULATED CONSTANTS WETTED PERIMETER WEIGHT'D MANNINGS1 I TOP WIDTH AREA OF FLOW 97.011 0.02581 96.001 41.98 CALCULATED HYDRAULICS THEO. ALLOW CAPACITY cfs CAPACITY WATER ELEV. VELOCITY s 87.511 70.011 100.50 0.72 No Text DRAINAGE CRITERIh MANUAL RUNOFF L' e �e.. • 5% =2 v = 1. S ?s I•°7o :'l�jy1�11�0 w�\S SL)31�IvISID 50 30 E- 20 z w U cc ° 10 z W a 0 5 W CC 3 O U 2 w I— Q / - / -- 3 Z- 3 4" 0 - o° � e — — hoc• J� ''? _ P v tl =0 3P rP C _y 40 3 J - - —_-- - 4 AV O O it/ W QP 2 .3 .5 1. 1 2' 3 5 10 20 VELOCITY IN FEET PER SECOND FIGURE 3-2. ESTIMATE OF AVERAGE FLOW VELOCITY FOR 1 USE WITH . THE RATIONAL FORMULA. *MOST FREQUENTLY OCCURRING `UNDEVELOPED" LAND SURFACES IN THE DENVER REGION. REFERENCE: "Urban Hydrology For Small Watersheds" Technlcal Release No. 55, USDA, SCS Jan. 1975. 5 -1-84 URBAN DRAINAGE d FLOOD CONTROL DISTRICT STEWART&ASSOCIATES 10 S. MEL9 3D1RF , 4ORT COLLINS, CO 80521 82 Consulting Engineers and Surveyors CP '� CnA� �� ► By: �- Date: Z-%- la Client: ��>R�t, r�'• Sheet No. of Project: A,1LOu-t\C \ CL)�.��utS« Subject: I, -� AS r 6'� 1 \F'` 1�• I-�I��lh� �Z- 1 L(�►-�ti vt1�C�iY q-5 (, s�� ►Fps 1.5 ��s 8 Z,6zk �t,-70;(,s-� I,�� I's 2.Iej S�(2-t)/54o�.5) 101 1.5 D 0.93 50'(Z- ,')/PA 1.0/ pA DEVELOPED RUNOFF COMPUTATIONS FROM RATIONAL METHOD Q=CxCfxIxA SUBBASIN T.O.C. (100yr D. Pnt. Sloe C * Cf Len th OverLTc Vel.Chan Tc Chan. Tc Total COMMENTS % feet min. ft/sec. min. min. A 2.00 0.75 55.00 3.9 Tc 100 0.501 1 485.00 1.50 5.391 9.2 LNGST.OVERL.+CHANNEL 0.60 = Runoff C 1.00 = Cf 2,10 1.25 =Cf 100 D. Pnt. Area C * Cf acres I (2yr.) in/hr I (10yr.) in/hr I (100yr.) in/hr) Basin Q (cfs)cfs Comb. Q COMMENTS A 1.281 0.601 2.701 2.07 2.11 2 yr. runoff 0.60 3.00 2.30 2:3 10 r. runoff 0.751 7.00 6.72 6.7 La 100 yr. runoff 0.60 = C 1.00 =Cf 2,10 1.25 =Cf 100 SUBBASIN T.O.C. (100yr) D. Pnt. Sloe C * Cf Length OverL To Vel.Chan I Tc Chan. Tc Total COMMENTS y, feet min. fUsec. min. min. B 2.00 0.75 55.001 3.9 1 Tc 100 0.50 670.001 1.501 7.41 11.3 LNGST.OVERI +CHANNEL 0.60 = Runoff C 1.00 = Cf 2,10 1.25 =Cf 100 D. Pnt. Area acres C * Cf I (2yr.) in/hr I (10yr.) in/hr I (100yr.) in/hr Basin Q cfs Comb. Q cfs COMMENTS B 2.64 0.601 2.40 3.80 3.8 2 r. runoff 0.601 4.20 6.65 6.7 10 r. runoff 0.75 6.90 13.66 13.7 100 r. runoff 0.60 = C 1.00=Cf(2,10) 1.25 =Cf 100 B SUBBASIN T.O.C. 1001fr D. Pnt. Slope C * Cf Length 9, feet OverL Tc min. Vel.Chan Tc an. ft/sec. min. Tc Total min. COMMENTS C 2.00 0.751 50.001 3.7 1 1 Tc 100 1 1.501 1 540.001 2.501 3.6 7.31 LNGST. OVERL.+CHANNEL 0.60 = Runoff C 1.00 = Cf 2.10 1.25 =Cf 100 D. Pnt. Area C * Cf I (2yr.) acres in/hr I (10yr.) in/hr I (100yr.) Basin Q in/hr)(cfs) Comb. Q (cfs COMMENTS C 2.181 0.601 2.80 3.661 3.7 2 r. runoff 1 0.601 5.001 6.541 6.5 10 yr. runoff 1 0.75 i 7.001 11.451 11.4 100 r. runoff 0.60 = C 1.00=Cf(2,10) 1.25=Cf(100) IC 6.10 = Area(ac) this page DATE: FEBRUARY 1994 DEVELOPED RUNOFF COMPUTATIONS FOR 2/10/100 YR. STORMS NAKOMIS SYBDIVISION FOR: U.S.A.G. CAPITAL AND LEASING BY: Stewart & Associates GENERAL NOTES: Velocity in a Channel per FIGURE 3-2 If C x Cf > = 1 then C x Cf = 1 (constants listed below) For design of the developed site runoff quantities Tc(100) was the basis for design BANAKOMRO.wk3 HISTORIC RUNOFF COMPUTATIONS FROM RATIONAL METHOD Q=CXCfXIXA SUBBASIN T.O.C. 100 r D. Pnt. Slope % ' C * Cf Length feet Overt Tc min. Vel.Chan ft/sec. Tc Chan. min. Tc Total min. COMMENTS 1 1 1.001 0.25 360.00 30.2 Tc 100 1.001 0.00 1.50 0.0 30.2 LNGST.OVERL.+CHANNEL 0.20 = Runoff C 1.00 = Cf 2.10 1.25 =Cf 100 D. Pnt. Area acres C * Cf I (2yr.) 1 (10yr.) in/hr in/hr 1 (100yr.) in/h Basin Q cfs Comb. Q cfs COMMENTS 1 3.521 0.201 1.481 1.0411 1.011 2 yr. runoff 0.201 2.60 1.83 t.8 10 r. runoff 0.251 4.16 3.66 3.7 100 yr. runoff 0.20 = C 1.00 =Cf 2,10 1.25 =Cf 100 1 SUBBASIN T.O.C. 100 r D. Pnt. Slope C * Cf % Length feet Overt Tc Vel.Chan min. f /sec. Tc Chan. min. Tc Total min. COMMENTS 2 1 1.001 0.251 360.001 30.21 1 Tc 100 1 1.001 1 0.001 1 0,501 0.00 30.2 LNGST. OVERL. +CHANNEL 0.20 = Runoff C 1.00 = Cf 2.10 1.25 =Cf 100 D. Pnt. Area acres C * Cf I (2yr.) in/hr I (10yr.) in/hr I (100yr.) Basin Q in/hr cfs Comb. Q cfs COMMENTS 2 3.511 0.201 1.48 1! 1.04JJ 1.701 2 yr. runoff 0.201 2.601 1 1.83 10 r. runoff 0.251 4.16 3.65 LEA 100 r. runoff 0.20 = C 1.00 =Cf 2,10 1.25 =Cf 100 7.03 = Project Area (ac) 2-YEAR HISTORIC 2.08 PRELIMINARY HYDROLOGIC SUMMARY NAKOMIS SUBDIVISION TOTAL DEVELOPED RUNOFF 10.81 2 yr. runoff 17.8 10 r. runoff 36.4 100 r. runoff NORTH BACKLOT PAN 2.11 2 yr. runoff 2.31 10 yr. runoff 6.71 100 yr. runoff 7.03 = Total project area(ac) Basins A NAKOMIS COURT PAN 4.01 2 yr. runoff 5.61 10 yr. runoff 13.61 100 yr. runoff Basins A + 13(1/2) NAKOMIS COURT STREET FLOW 1.91 2 yr. runoff 3.31 10 yr. runoff 6.81 100 yr. runoff BasinsB(1/2) EAUH SIUE HISTORIC FLOW 2.11 2 yr.. runoff 3.71 10 yr. runoff 7.31 100 yr. runoff FOTAL SITE SOUTH BACKLOT PAN 3.71 2 yr. runoff 6.51 10 yr. runoff 11.4 J 100 yr. runoff Basin C FLOW TO OUTFALL CHANNEL #223 1.31 2 yr. runoff 2.31 10 yr. runoff 4.61 100 yr. runoff Basin D Nokomis Subdivision Page 2 The site has good ground cover on most of the site. There is some existing landscaping on the site, which will be retained as much as possible. Nokomis Court will be rough cut and the utilities constructed thereafter. The area from the front of the proposed houses to the rear concrete pan will not be disturbed until the house is constructed. Straw bale barriers and rock filters will be placed at discharge points. The storm water runoff calculations and the preliminary grading and drainage plan are enclosed as a part of this report. If you have any questions regarding this report, please call. Sincerely, Richard A. Rutherford, E. & L.S. President jrr enclosures STEWART&ASSOCIATES Consulting Engineers and Surveyors February 7, 1994 Mr. Basil Harridan Storm Water Utility City of Fort Collins P.O. Box 580 Fort Collins, Colorado 80522 Dear Basil: The following is the preliminary storm drainage report for Nokomis Subdivision, Fort Collins, Colorado. The site contains 5.20 net acres and 5.48 gross acres, including the west half of Redwood Street. It is located on the west side of Redwood Street approximately 300 feet north of Conifer Street in the Northwest a of Section 1, Township 7 North, Range 69 West of the 6th P.M. The site is in the Evergreen Park Drainage Basin. It is bounded on the east by Redwood Street, on the south by the New Beginnings facility that has been recently closed, on the west by existing industrial uses in Evergreen Park and on the north by the proposed Greenbriar Village. The site slopes from west to east at approximately 0.4% grade. It is proposed to subdivide the site into 21 single—family detached residential lots. The site will be divided into four developed sub —basins. The existing Evergreen Park Detention Pond 130, as shown on the Evergreen Park Basin Major Storm Drainage Study proposed by Engineering Professionals, Inc. and dated February 1981, is adjacent to this site at the northwest corner of the proposed subdivision. Also, the outfall channel from Pond 130 is along the west boundary of the subdivision. It is proposed to carry the runoff, undetained, from Sub —Basins "A", "B" and "C" in the curb and gutter of Nokomis Court and in concrete pans along the north and south boundary lines to Redwood Street. The runoff would then flow southerly in the west gutter of Redwood Street to an existing 5—foot curb inlet and existing area inlet at the northwest corner of Redwood Street and Conifer Street. Existing storm drains then would carry the runoff to existing Detention Pond 120. 1 Sub —Basin "D" is the rear yards of Lots 10 through 13 which drain west to the existing Outfall Channel No. 223. Channel No. 223 flows south across Conifer Street to existing Detention Pond No. 150. James H. Stewart and Associates, Inc. 103 S. Meldrum Street P.O. Box 429 Ft. Collins, CO 80522 303/482-9331 Fax 303/482-9382 PRELIMINARY DRAINAGE REPORT FOR NOKOMIS SUBDIVISION FEBRUARY 7, 1994 STEWART & ASSOCIATES, INC. 103 SOUTH MELDRUM STREET FORT COLLINS, COLORADO 80521 303/482-9331