Loading...
HomeMy WebLinkAboutWOODLAND STATION PUD - PRELIMINARY - 18-94B (44-94) - SUBMITTAL DOCUMENTS - ROUND 1 - SUBMITTAL CHECKLISTL Checksheet Woodland Station Preliminary PUD The following check sheet is to be used in the preparation of a complete submittal of a Preliminary PUD Plan: X 1. Application (1 copy). X 2. Filing fee ($1,472.00 + $656.00 (plat) _ $2,128.00) X 3. Legal description of property (2 copies on 81h" X II" sheet). X 4. A current list of names and addresses of all owners of record of real property within 500 feet. The APO List and Labels were previously submitted on March 22, 1994. The APO fees of $13.00 are included with the filing fees. X 5. Planning objectives (25 copies). X 6. Completed point charts (3 copies). NA 7. Energy conservation worksheet (3 copies). X 8. Architectural elevations (5 folded copies). X 9. Site plan (25 folded copies). X 10. Landscape plan (16 folded copies). X 11. Utility plans (10 unfolded copies). X 12. Street cross sections (5 unfolded copies). X 13. Physiographic data (2 copies). X 14. Preliminary drainage report and plans and grading plans (4 unfolded copies). X 15. Preliminary subdivision plat (21 folded copies). X 16. Traffic impact analysis (4 copies). The Traffic Impact Analysis was previously submitted with Golden Corral and Harmony Market 9th Filing on July 5th. NA 17. Hazardous materials impact analysis (4 copies). X 18. Other documentation as determined by special circumstance. Land Use Breakdown (2 copies). 4.12 c TRANSMITTAL LETTER TO: Ted Shepard City of Fort Collins Planning Department P.O. Box 580 Fort Collins, CO 80522 DATE: August 22, 1994 PROJECT: Woodland Station PROJECT NO: 4630 / 4631 We are transmitting the following: coxn@@P(A� urban design, inc. 3555 stanford road, suite 105 fort collins, colorado 80525 (303) 226-4074 FAX (303) 226-4196 1 each Submittal Package per the attached Checklist for a Preliminary PUD BY MESSENGER Sincerely, Received by: C' sca an Design, Inc.