HomeMy WebLinkAboutWESTBURY PUD - PRELIMINARY - 11-94 - SUBMITTAL DOCUMENTS - ROUND 1 - TRAFFIC STUDYNo Text
CAPACITY AND LEVEL -OF -SERVICE Page-3
---------------------------------------------------------------------
POTEN- ACTUAL
FLOW- TIAL MOVEMENT SHARED RESERVE
RATE CAPACITY CAPACITY CAPACITY CAPACITY
MOVEMENT v(pcph) a (pcph) c (pcph) -c (pcph) c = C - v LOS
P M SH R SH
----------------------------------------------- ---
MINOR STREET
NB LEFT 2 191 186 186
RIGHT 20 .602 602 602
MAJOR STREET
WB LEFT 33 700 700 700
IDENTIFYING INFORMATION
NAME OF THE EAST/WEST STREET...... HARMONY
NAME OF THE NORTH/SOUTH STREET.... CONNECTOR
DATE AND TIME OF THE ANALYSIS..... 02-27-1994 : 2015 PM PK HR
OTHER INFORMATION....
184 D
582 A
667 A
ADJUSTMENT FACTORS
---------------------------------------------------------------------
Page-2
PERCENT RIGHT TURN
CURB RADIUS (ft) ACCELERATION
LANE
GRADE ANGLE
FOR RIGHT TURNS FOR
RIGHT TURNS
------- ----------
EASTBOUND 0.00 90
---------------- -----------------
20
N
WESTBOUND 0.00 90
20
N
NORTHBOUND 0.00 90
20
N
SOUTHBOUND ----- ---
---
-
VEHICLE COMPOSITION
---------------------------------------------------------------------
% SU TRUCKS % COMBINATION
AND RV'S VEHICLES
% MOTORCYCLES
-------------
----------- -------------
EASTBOUND 0
0 0
WESTBOUND 0
0 0
NORTHBOUND 0
0 0
SOUTHBOUND ---
--- ---
CRITICAL.GAPS
-----------------=---------------------------------------------------
TABULAR VALUES
ADJUSTED SIGHT DIST.
FINAL
(Table 10-2)
VALUE ADJUSTMENT
CRITICAL GAP
MINOR RIGHTS
NB 5.70
5.70 0.00
5.70
MAJOR LEFTS
WB 5.10
5.10 0.00
5.10
MINOR LEFTS
NB 6.80
6.80 0.00
6.80
IDENTIFYING INFORMATION
---------------------------------------------------------------------
NAME OF THE EAST/WEST STREET......
HARMONY
NAME OF THE NORTH/SOUTH STREET....
CONNECTOR
DATE AND TIME OF THE ANALYSIS.....
02-27-1994 ; 2015 PM
PK HR
OTHER INFORMATION....
1985 HCM: UNSIGNALIZED INTERSECTIONS Page-1
IDENTIFYING INFORMATION
----------------------------------------=----------------------------
AVERAGE RUNNING SPEED, MAJOR STREET.. 35
PEAK
HOUR FACTOR .....................
1
AREA
POPULATION ......................
150000
NAME
OF THE EAST/WEST STREET.........
HARMONY
NAME
OF THE NORTH/SOUTH STREET.......
CONNECTOR
NAME
OF THE ANALYST :.................
EGC
DATE
OF THE ANALYSIS (mm/dd/yy)......
02-27-1994
TIME
PERIOD ANALYZED .................
2015 PM PK HR
OTHER
INFORMATION....
INTERSECTION
---------------------------------------------------
TYPE AND CONTROL
INTERSECTION TYPE: T-INTERSECTION
MAJOR STREET DIRECTION: EAST/WEST
CONTROL TYPE NORTHBOUND: STOP SIGN
TRAFFIC VOLUMES
---------------
EB WB NB SB
---- ---- ---- ----
LEFT 0 30 2
THRU 491 531 0 --
RIGHT 4 0 18 --
NUMBER OF LANES
-----------------------------------------
EB WB NB SB
----------------------------
LANES 1 2 2 --
CAPACITY AND LEVEL -OF -SERVICE Page-3
---------------------------------------------------------------------
POTEN- ACTUAL
FLOW- TIAL MOVEMENT SHARED RESERVE
RATE CAPACITY CAPACITY CAPACITY CAPACITY
MOVEMENT v(pcph) c (pcph) c (pcph) c (pcph) c = c - v LOS
P M SH R SH
------------------------------------------------ ---
MINOR STREET
NB LEFT 4 212 209 209 205 C
RIGHT 29 394 394 394 365 B
MAJOR STREET
WB LEFT 9 477 477 477 468 A
IDENTIFYING INFORMATION
NAME OF THE EAST/WEST STREET...... HARMONY
NAME OF THE NORTH/SOUTH STREET.... CONNECTOR
DATE AND TIME OF THE ANALYSIS..... 02-27-1994 ; 2015 AM PK HR
OTHER INFORMATION....
ADJUSTMENT FACTORS
---------------------------------------------------------------------
Page-2
PERCENT RIGHT TURN
CURB RADIUS (ft) ACCELERATION
LANE
GRADE ANGLE
----------
FOR RIGHT TURNS FOR
----------------
RIGHT TURNS
-------
EASTBOUND 0.00 90
-----------------
20
N
WESTBOUND 0.00 90
20
N
NORTHBOUND 0.00 90
20
N
SOUTHBOUND ----- ---
---
VEHICLE COMPOSITION
---------------------------------------------------------------------
% SU TRUCKS % COMBINATION
AND RV'S VEHICLES % MOTORCYCLES
-------------
----------- -------------
EASTBOUND 0
0 0
WESTBOUND 0
0 0
NORTHBOUND 0
0 0
SOUTHBOUND ---
--- ---
CRITICAL GAPS .
---------------------------------------------------------------------
TABULAR VALUES
ADJUSTED SIGHT DIST.
FINAL
(Table 10-2)
VALUE ADJUSTMENT
-------- -----------
CRITICAL GAP
------------
--------------
MINOR RIGHTS
NB 5.70
5.70 .0.00
5.70
MAJOR LEFTS
WB 5.10
5.10 0.00
5.10
MINOR LEFTS
NB 6.80
6.80 0.00
6.80
IDENTIFYING INFORMATION
---------------------------------------------------------------------
NAME OF THE EAST/WEST STREET......
HARMONY
NAME OF THE NORTH/SOUTH STREET....
CONNECTOR
DATE AND TIME OF THE ANALYSIS.....
02-27-1994 : 2015 AM
PK HR
OTHER INFORMATION....
1985 HCM: UNSIGNALIZED INTERSECTIONS Page-1
IDENTIFYING INFORMATION
---------------------------------------------------------------------
AVERAGE RUNNING SPEED, MAJOR STREET.. 35
PEAK
HOUR FACTOR .....................
1
AREA
POPULATION ......................
150000
NAME
OF THE EAST/WEST STREET.........
HARMONY
NAME
OF THE NORTH/SOUTH STREET.......
CONNECTOR
NAME
OF THE ANALYST ..................
EGC
DATE
OF THE ANALYSIS (mm/dd/yy)......
02-27-1994
TIME
PERIOD ANALYZED .................
2015 AM PK HR
OTHER
INFORMATION....
INTERSECTION TYPE AND CONTROL
---------------------------------------------------
INTERSECTION TYPE: T-INTERSECTION
MAJOR STREET DIRECTION: EAST/WEST
CONTROL TYPE NORTHBOUND: STOP SIGN
TRAFFIC VOLUMES
---------------
ES WB NB SB
---- ---- ---- ----
LEFT 0 8 4 --
THRU 814 162 0 --
RIGHT 2 0 26 --
NUMBER OF LANES
---------------------------------------------------------------------
EB WB NB SB
LANES 1 2 2 --
CAPACITY AND LEVEL -OF -SERVICE Page-3
---------------------------------------------------------------------
POTEN- ACTUAL
FLOW- TIAL MOVEMENT SHARED RESERVE
RATE CAPACITY CAPACITY CAPACITY CAPACITY
MOVEMENT v(pcph) c (pcph) c (pcph) c (pcph) c = c - v LOS
p M SH R SH
------------------------------------------------ ---
MINOR STREET
EB
LEFT
26
112
96
96
70
E
THROUGH
0
158
148
> 148
> 148
> D
RIGHT
7
762
762
> 762 762
> 755 755
>A A
MINOR
STREET
WS
LEFT
31
124
116
116
85
E
THROUGH
0
153
143
143
143
D
RIGHT
103
781
781
781
678
A
MAJOR
STREET
SB
LEFT
48
575
575
575
527
A
NB
LEFT
13
546
546
546
533
A
IDENTIFYING INFORMATION
NAME OF THE EAST/WEST STREET...... SHIELDS
NAME OF THE NORTH/SOUTH STREET.... CONNECTOR
DATE AND TIME OF THE ANALYSIS..... 02-27-1994 2015 PM PK HR
OTHER INFORMATION....
ADJUSTMENT FACTORS Page-2
---------------------------------------------------------------------
PERCENT
RIGHT TURN
CURB RADIUS (ft)
ACCELERATION LANE
GRADE
ANGLE
FOR RIGHT TURNS
FOR RIGHT TURNS
EASTBOUND.
-------
0.00
----------
90
----------------
20
-----------------
N
WESTBOUND
0.00
90
20
N
NORTHBOUND
0.00
90
20
N
SOUTHBOUND
0.00
90
20
N
VEHICLE COMPOSITION
---------------------------------------------------------------------
EASTBOUND
WESTBOUND
NORTHBOUND
SOUTHBOUND
CRITICAL GAPS
-------------
% SU TRUCKS % COMBINATION
AND RV'S VEHICLES
------------------------
0 0
0 0
0 0
0 0
MINOR RIGHTS
ES
WB
MAJOR LEFTS
SB
NB
MINOR THROUGHS
EB
WB
MINOR LEFTS
% MOTORCYCLES
-------------
0
0
0
------------------------------------------------------
TABULAR VALUES
ADJUSTED
SIGHT DIST.
FINAL
(Table 10-2)
--------------
VALUE
--------
ADJUSTMENT
-----------
CRITICAL GAP
------------
5.70
5.70
0.00
5.70
5.70
5.70
0.00
5.70
5.60
5.60
0.00
5.60
5.60
5.60
0.00
5.60
6.80
6.80
0.00
6.80
6.80
6.80
0.00
6.80
EB 7.30 7.30 0.00 7.30
WB 7.30 7.30 0.00 7.30
IDENTIFYING INFORMATION
---------------------------------------------------------------------
NAME OF THE EAST/WEST STREET...... SHIELDS
NAME OF THE NORTH/SOUTH STREET.... CONNECTOR
DATE AND TIME OF THE ANALYSIS..... 02-27-1994 : 2015 PM PK HR
OTHER INFORMATION....
1985 HCM: UNSIGNALIZED INTERSECTIONS Page-1
IDENTIFYING INFORMATION
---------------------------------------------------------------------
AVERAGE RUNNING SPEED, MAJOR STREET.. 35
PEAK
HOUR FACTOR .....................
1
AREA
POPULATION ......................
150000
NAME
OF THE EAST/WEST STREET.........
SHIELDS
NAME
OF THE NORTH/SOUTH STREET.......
CONNECTOR
NAME
OF THE ANALYST ..................
EGC
DATE
OF THE ANALYSIS (mm/dd/yy)......
02-27-1994
TIME
PERIOD ANALYZED .................
2015 PM PK HR
OTHER
INFORMATION....
INTERSECTION TYPE AND CONTROL
---------------------------------------------------
INTERSECTION TYPE: 4-LEG
MAJOR STREET DIRECTION: NORTH/SOUTH
CONTROL TYPE EASTBOUND: STOP SIGN
CONTROL TYPE WESTBOUND: STOP SIGN
TRAFFIC VOLUMES
---------------------------------------------
EB WB NB SB,
---- ---- ---- ----
LEFT 24 28 12 44
THRU 0 0 549 552
RIGHT 6 94 2 40
NUMBER OF LANES AND LANE USAGE
---------------------------------------------
ES WB NB SB
----------------------------
LANES 2 2 2 2
LANE USAGE L + R L + R
CAPACITY AND LEVEL-OF-SERVICE
--------------------------------------
POTEN-
ACTUAL
FLOW-
TIAL
MOVEMENT
RATE
CAPACITY
CAPACITY
MOVEMENT
v( pcph )
c ( pcph )
c ( pcph )
-------
P
--------
M
---------
MINOR
STREET
EB
LEFT
35
79
27
THROUGH
0
102
36
RIGHT
13
838
838
MINOR
STREET
WB
LEFT
13
87
30
THROUGH
0
ill
39
RIGHT
24
691
691
MAJOR
STREET
SB
LEFT
323
445
445
NB
LEFT
4
662
662
IDENTIFYING INFORMATION
Page-3
---------------------------
SHARED RESERVE
CAPACITY CAPACITY
c ( pcph ) c = c - v LOS
SH R SH
---------------------- ---
27 -8 F
> 36 > 36 > E
> 838 838 > 825 825 >A A
30
39
691
445
662
NAME OF THE EAST/WEST STREET...... SHIELDS
NAME OF THE NORTH/SOUTH STREET.... CONNECTOR
DATE AND TIME OF THE ANALYSIS..... 02-27-1994 : 2015 AM PK HR
OTHER INFORMATION....
17 E
39 E
667 A
122 D
658 A
ADJUSTMENT FACTORS Page-2
---------------------------------------------------------------------
PERCENT
RIGHT TURN
CURB RADIUS (ft)
ACCELERATION LANE
GRADE
ANGLE
FOR RIGHT TURNS
FOR RIGHT TURNS
-----------------
EASTBOUND
-------
0.00
----------
90
----------------
20
N
WESTBOUND
0.00
90
20
N
NORTHBOUND
0.00
90
20
N
SOUTHBOUND
0.00
90
20
N
VEHICLE COMPOSITION
-------=-------------------------------------------------------------
EASTBOUND
WESTBOUND
NORTHBOUND
SOUTHBOUND
CRITICAL GAPS
-------------
SU TRUCKS : COMBINATION
AND RV'S VEHICLES
0 0
0 0
0 0
0 0
% MOTORCYCLES
-------------
0
0
0
------------------------------------------------------
TABULAR
VALUES
ADJUSTED
SIGHT DIST.
FINAL
(Table
--------------
10-2)
VALUE
--------
ADJUSTMENT
-----------
CRITICAL GAP
------------
MINOR RIGHTS
EB 5.70 5.70 0.00 5.70
WB 5.70 5.70 0.00 5.70
MAJOR LEFTS
SB
5.60
5.60
0.00
5.60
NB
5.60
5.60
0.00
5.60
MINOR THROUGHS
EB
6.80
6.80
0.00
6.80
WB
.6.80
6.80
0.00
6.80
MINOR LEFTS
EB 7.30 7.30 0.00 7.30
WB 7.30 7.30 0.00 7.30
IDENTIFYING INFORMATION
----------------------------------------------------------------
NAME OF THE EAST/WEST STREET...... SHIELDS
NAME OF THE NORTH/SOUTH STREET.... CONNECTOR
DATE AND TIME OF THE ANALYSIS..... 02-27-1994 : 2015 AM PK HR
OTHER INFORMATION....
1985 HCM: UNSIGNALIZED INTERSECTIONS Page-1
IDENTIFYING INFORMATION
-------------=-------------------------------------------------------
AVERAGE RUNNING SPEED, MAJOR STREET.. 35
PEAK
HOUR FACTOR .....................
1
AREA
POPULATION ......................
150000
NAME
OF THE EAST/WEST STREET.........
SHIELDS
NAME
OF THE NORTH/SOUTH STREET.......
CONNECTOR _
NAME
OF THE ANALYST ..................
EGC
DATE
OF THE ANALYSIS (mm/dd/yy)......
02-27-1994
TIME
PERIOD ANALYZED .................
2015 AM PK HR
OTHER
INFORMATION....
INTERSECTION
---------------------------------------------------------------------
TYPE AND CONTROL
INTERSECTION TYPE: 4-LEG
MAJOR STREET DIRECTION: NORTH/SOUTH
CONTROL TYPE EASTBOUND: STOP SIGN
CONTROL TYPE WESTBOUND: STOP SIGN
TRAFFIC VOLUMES
---------------------------------------------------------------------
ES WB NB SB
---- ---- ---- ----
LEFT 32 12 4 294
THRU 0 0 617 418
RIGHT 12 22 132 12
NUMBER OF LANES AND LANE USAGE
--------------------------------------=------------------------------
ES WB NB SB
----------------------------
LANES 2 2 2 2
LANE USAGE L + R L + R
CAPACITY AND LEVEL-OF-SERVICE.
------------------------------------------
Page-3
-----------------
POTEN- ACTUAL
FLOW- TIAL MOVEMENT SHARED RESERVE
RATE CAPACITY CAPACITY CAPACITY CAPACITY
MOVEMENT v(pcph) c (Pcph) c (Pcph) c (Pcph) c = c - v LOS
P M SH R SH
------------------------------------------------ ---
MINOR STREET
ES LEFT
13
129
120
120
107
D
THROUGH
0
170
164
> 164
> 164
> D
RIGHT
3
774
774
> 774 774
> 771 771
>A A
MINOR STREET
WB LEFT
15
137
133
133
117
D
THROUGH
0
167
162
162
162
D
RIGHT
52
781
781
781
729
A
MAJOR STREET
SB LEFT
24
575
575
575
550
A
NB LEFT
7
565
565
565
559
A
IDENTIFYING INFORMATION
NAME OF THE EAST/WEST STREET...... SHIELDS
NAME OF THE NORTH/SOUTH STREET.... CONNECTOR
DATE AND TIME OF THE ANALYSIS..... 02-27-1994 : 1997 PM PK HR
OTHER INFORMATION....
ADJUSTMENT FACTORS Page-2
----------------- ---------------------------------------------------
PERCENT RIGHT TURN CURB RADIUS (ft) ACCELERATION LANE
GRADE ANGLE
FOR RIGHT
TURNS FOR RIGHT TURNS
EASTBOUND
------- ----------
0.00 90
----------------
20
-----------------
N
WESTBOUND
0.00 90
20
N
NORTHBOUND
0.00 90
20
N
SOUTHBOUND
0.00 90
20
N
VEHICLE COMPOSITION
---------------------------------------------------------------------
% SU TRUCKS a
COMBINATION
AND RV'S
VEHICLES
% MOTORCYCLES
-------------
EASTBOUND
----------- -------------
0
0
0
WESTBOUND
0
0
0
NORTHBOUND
0
0
0
SOUTHBOUND
0
0
0
CRITICAL GAPS
-------------------------------------------
7-------------------------
TABULAR VALUES
ADJUSTED
SIGHT DIST.
FINAL
(Table 10-2)
VALUE
--------
ADJUSTMENT
-----------
CRITICAL GAP
------------
--------------
MINOR RIGHTS
EB 5.70
5.70
0.00
5.70
WB 5.70
5.70
0.00
5.70
MAJOR LEFTS
SB
5.60
5.60
0..00
5.60
NB
5.60
5.60
0.00
5.60
MINOR THROUGHS
EB
6.80
6.80
0.00
6.80
WB
6.80
6.80
0.00
6.80
MINOR LEFTS
EB 7.30 7.30 0.00 7..30
WB 7.30 7.30 0.00 7.30
IDENTIFYING INFORMATION
---------------------------------------------------------------------
NAME OF THE EAST/WEST STREET...... SHIELDS
NAME OF THE NORTH/SOUTH STREET.... CONNECTOR
DATE AND TIME OF THE ANALYSIS..... 02-27-1994 ; 1997 PM PK HR
OTHER INFORMATION....
1985 HCM: UNSIGNALIZED.INTERSECTIONS Page-1
IDENTIFYING INFORMATION
---------------------------------------------------------------------
AVERAGE RUNNING SPEED, MAJOR STREET.. 35
PEAK
HOUR FACTOR .....................
1
AREA
POPULATION ......................
150000
NAME
OF THE EAST/WEST STREET.........
SHIELDS
NAME
OF THE NORTH/SOUTH STREET.......
CONNECTOR
NAME
OF THE ANALYST ..................
EGC
DATE
OF THE ANALYSIS (mm/dd/yy)......
02-27-1994
TIME
PERIOD ANALYZED .................
1997 PM PK HR
OTHER INFORMATION....
INTERSECTION TYPE AND CONTROL
---------------------------------------------------------------------
INTERSECTION TYPE: 4-LEG
MAJOR STREET DIRECTION: NORTH/SOUTH
CONTROL TYPE EASTBOUND: STOP SIGN
CONTROL TYPE WESTBOUND: STOP SIGN
TRAFFIC VOLUMES
---------------------------------------------------------------------
ES WB NS SB
---- ---- ---- ----
LEFT 12 14 6 22
THRU 0 0 551 545
RIGHT 3 47 1 20
NUMBER OF LANES AND LANE USAGE
---------------------------------------------------------------------
EB
LANES 2
LANE USAGE L + R
WB
2
L + R
NB SB
2 2
CAPACITY AND LEVEL -OF -SERVICE Page-3
---------------------------------------------------------------------
POTEN- ACTUAL
FLOW- TIAL MOVEMENT SHARED RESERVE
RATE CAPACITY CAPACITY CAPACITY CAPACITY
MOVEMENT v(pcph) c (pcph) c (pcph) c (pcph) c = c - v LOS
p M SH R SH
------------------------------------------------ ---
MINOR STREET
EB
LEFT
18
Be
62
62
45
E
THROUGH
0
112
80
> 80
.> 80
> E
RIGHT
7
768
768
> 768 768
> 761 761
>A A
MINOR
STREET
WB
LEFT
7
94
67
67
60
E
THROUGH
0
119
85
85
85
E
RIGHT
12
728
728
728
716
A
MAJOR
STREET
SB
LEFT
177
498
498
498
321
B
NB
LEFT
2
555
555
555
553
A
IDENTIFYING INFORMATION
NAME OF THE EAST/WEST STREET...... SHIELDS
NAME OF THE NORTH/SOUTH'STREET.... CONNECTOR
DATE AND TIME OF THE ANALYSIS..... 02-27-1994 ; 1997 AM PK HR
OTHER INFORMATION....
ADJUSTMENT FACTORS. Page-2
---------------------------------------------------------------------
PERCENT
RIGHT TURN
CURB RADIUS (ft)
ACCELERATION LANE
GRADE
-------
ANGLE
----------
FOR RIGHT TURNS
----------------
FOR RIGHT TURNS
EASTBOUND
0.00
90
20
-----------------
N
WESTBOUND
0.00
90
20
N
NORTHBOUND
0.00
90
20
N
SOUTHBOUND
0.00
90
20
N
VEHICLE COMPOSITION
---------------------------------------------------------------------
% SU TRUCKS
AND RV'S
EASTBOUND 0
WESTBOUND 0
NORTHBOUND 0
SOUTHBOUND 0
CRITICAL GAPS
------------------------
% COMBINATION
VEHICLES
-------------
0
0
0
% MOTORCYCLES
-------------
0
0
0
TABULAR VALUES
ADJUSTED
SIGHT DIST.
FINAL
(Table 10-2)
--------------
VALUE
--------
ADJUSTMENT
-----------
CRITICAL GAP
--=---------
MINOR RIGHTS
EB 5.70
5.70
0.00
5.70
WB 5.70
5.70
0.00
5.70
MAJOR LEFTS
SB
5.60
5.60
0.00
5.60
NB
5.60
5.60
0.00
5.60
MINOR THROUGHS
EB
6.80
6.80
0.00
6.80
WB
6.80
6.80
0.00
6.80
MINOR LEFTS
EB .7.30 7.30 0.00 7.30
WB 7.30 7.30 0.00 7.30
IDENTIFYING INFORMATION
---------------------------------------------------------------------
NAME OF THE EAST/WEST STREET...... SHIELDS
NAME OF THE NORTH/SOUTH STREET.... CONNECTOR
DATE AND TIME OF THE ANALYSIS..... 02-27-1994 : 1997 AM Pk HR
OTHER INFORMATION....
1985 HCM: UNSIGNALIZED INTERSECTIONS Page-1
IDENTIFYING INFORMATION
---------------------------------------------------------------------
AVERAGE RUNNING SPEED, MAJOR STREET.. 35
PEAK
HOUR FACTOR .....................
1
AREA
POPULATION ......................
150000
NAME
OF- THE EAST/WEST STREET.........
SHIELDS
NAME
OF THE NORTH/SOUTH STREET.......
CONNECTOR
NAME
OF THE ANALYST ..................
EGC
DATE
OF THE ANALYSIS (mm/dd/yy)......
02-27-1994
TIME
PERIOD ANALYZED .................
1997 AM PK HR
OTHER INFORMATION....
INTERSECTION TYPE AND CONTROL
---------------------------------------------------
INTERSECTION TYPE: 4-LEG
MAJOR STREET DIRECTION: NORTH/SOUTH
CONTROL TYPE EASTBOUND: STOP SIGN
CONTROL TYPE WESTBOUND: STOP SIGN
TRAFFIC VOLUMES
-------------------------------------------------------------
EB WB NB SB
---- ---- ---- ----
LEFT 16 6. 2 161
THRU 0 0 593 573
RIGHT 6 11 73 6
NUMBER OF LANES AND LANE USAGE
------------------------------
ES
LANES 2
LANE USAGE L + R
WB
NB
2
2
L
+ R
SB
2
CAPACITY AND
---------------------------------------------------------------------
LEVEL -OF -SERVICE
Page-3
POTEN-
ACTUAL
FLOW-
TIAL
MOVEMENT
SHARED
RESERVE
RATE
CAPACITY
CAPACITY
CAPACITY
CAPACITY
MOVEMENT
v(pcph)
c (pcph)
c (pcph)
c (pcph)
c = c - v
LOS
-------
p
--------
M
---------
SH
------------
R SH
------------
---
MINOR STREET
NB LEFT
1
235
232
232
231
C
RIGHT
10
670
670
670
660
A
MAJOR STREET
WB LEFT
17
777
777
777
760
A
IDENTIFYING INFORMATION
NAME OF THE EAST/WEST STREET...... HARMONY
NAME OF THE NORTH/SOUTH STREET.... CONNECTOR
DATE AND TIME OF THE ANALYSIS..... 02-27-1994 1997 PM PK HR
OTHER INFORMATION....
ADJUSTMENT FACTORS
---------------------------------------------------------------------
Page-2
PERCENT RIGHT TURN
CURB RADIUS (ft) ACCELERATION
LANE
GRADE ANGLE
------- ----------
FOR RIGHT TURNS FOR
----------------
RIGHT TURNS
EASTBOUND 0.00 90
-----------------
20
N
WESTBOUND 0.00 90
20
N
NORTHBOUND 0.00 90
20
N
SOUTHBOUND ----- ---
---
VEHICLE COMPOSITION
---------------------------------------------------------------------
% SU TRUCKS % COMBINATION
AND RV'S . VEHICLES % MOTORCYCLES
----------- -------------
EASTBOUND 0
-------------
0 0
WESTBOUND 0
0 0
NORTHBOUND 0
0 0
SOUTHBOUND ---
--- ---
CRITICAL GAPS
---------------------------------------------------------------------
TABULAR VALUES
ADJUSTED SIGHT DIST.
FINAL
(Table 10-2)
--------------
VALUE ADJUSTMENT
-------- -----------
CRITICAL GAP
------------
MINOR RIGHTS
NB 5.70
5.70 0.00
5.70
MAJOR LEFTS
WB 5.10
5.10 0.00
5.10
MINOR LEFTS
NB 6.80
6.80 0.00
6.80
IDENTIFYING INFORMATION
---------------------------------------------------------------------
NAME OF THE EAST/WEST STREET......
HARMONY
NAME OF THE NORTH/SOUTH STREET....
CONNECTOR
DATE AND TIME OF THE ANALYSIS.....
02-27-1994 ; 1997 PM
PK HR
OTHER INFORMATION....
1985 HCM: UNSIGNALIZED INTERSECTIONS Page-1
IDENTIFYING INFORMATION
---------------------------------------------------------------------
AVERAGE RUNNING SPEED, MAJOR STREET.. 35
PEAK
HOUR FACTOR .....................
1
AREA
POPULATION ......................
150000
NAME
OF THE EAST/WEST STREET.........
HARMONY
NAME
OF THE NORTH/SOUTH STREET.......
CONNECTOR
NAME
OF THE ANALYST ..................
EGC
DATE
OF THE ANALYSIS (mm/dd/yy)......
02-27-1994
TIME
PERIOD ANALYZED .................
1997 PM PK HR
OTHER
INFORMATION....
INTERSECTION
---------------------------------------------------------------------
TYPE AND CONTROL
INTERSECTION TYPE: T-INTERSECTION
MAJOR STREET DIRECTION: EAST/WEST
CONTROL TYPE NORTHBOUND: STOP SIGN
TRAFFIC VOLUMES
------------------------
EB WB
LEFT 0 15
THRU 397 511
RIGHT 2 0
NUMBER OF LANES
----------------------
NB SB
1 --
0 --
9 --
EB WB NB SB
----------------------------
LANES 1 2 2 --
CAPACITY AND LEVEL -OF -SERVICE Page-3
--------------------------------------------------------- ------------
POTEN- ACTUAL
FLOW- TIAL MOVEMENT SHARED RESERVE
RATE CAPACITY CAPACITY CAPACITY CAPACITY
MOVEMENT v(pcph) c (pcph) c (pcph) c (pcph) c = c - v Los
P M SH R SH
----------------------------------------------- ---
r'i�►`[�I�c�iTX�I
NB LEFT 2 278 277 277 274 C
RIGHT 14 489 489 489 474 A
MAJOR STREET
WB LEFT 4 577 577 577 572 A
IDENTIFYING INFORMATION
NAME OF THE EAST/WEST STREET...... HARMONY
NAME OF THE NORTH/SOUTH STREET.... CONNECTOR
DATE AND TIME OF THE ANALYSIS..... 02-27-1994 1997 AM PK HR
OTHER INFORMATION....
ADJUSTMENT FACTORS
---------------------------------------------------------------------
Page-2
PERCENT RIGHT TURN
CURB RADIUS (ft) ACCELERATION
LANE
GRADE ANGLE
FOR RIGHT TURNS FOR
RIGHT TURNS
------- ----------
EASTBOUND 0.00 90
---------------- -----------------
20
N
WESTBOUND 0.00 90
20
N
NORTHBOUND 0.00 90
20
N
SOUTHBOUND ----- ---
---
-
VEHICLE COMPOSITION
---------------------------------------------------------------------
a SU TRUCKS % COMBINATION
AND RV'S VEHICLES % MOTORCYCLES
-------------
----------- -------------
EASTBOUND 0
0 0
WESTBOUND 0
0 0
NORTHBOUND 0
0 0
SOUTHBOUND ---
--- ---
CRITICAL GAPS
---------------------------------------------------------------------
TABULAR VALUES,
ADJUSTED SIGHT DIST.
FINAL
(Table 10-2)
VALUE ADJUSTMENT
-------- -----------
CRITICAL GAP
------------
--------------
MINOR RIGHTS
NB 5.70
5.70 0.00
5.70
MAJOR LEFTS
WB 5.10
5.10 0.00
5.10
MINOR LEFTS
NB 6.80
6.80 0.00
6.80
IDENTIFYING INFORMATION
---------------------------------------------------------------------
NAME OF THE EAST/WEST STREET......
HARMONY
NAME OF THE NORTH/SOUTH STREET....
CONNECTOR .
DATE AND TIME OF 'THE ANALYSIS.....
02-27-1994 1997 AM
PK HR
OTHER INFORMATION....
1985 HCM: UNSIGNALIZED INTERSECTIONS Page-1
IDENTIFYING INFORMATION
---------------------------------------------------------------------
AVERAGE RUNNING SPEED, MAJOR STREET.. 35
PEAK
HOUR FACTOR .....................
1
AREA
POPULATION ......................
150000.
NAME
OF THE EAST/WEST STREET.........
HARMONY
NAME
OF THE NORTH/SOUTH STREET.......
CONNECTOR
NAME
OF THE ANALYST ..................
EGC
DATE
OF THE ANALYSIS (mm/dd/yy)......
02-27-1994
TIME
PERIOD ANALYZED .................
1997 AM PK HR
OTHER
INFORMATION....
INTERSECTION TYPE AND CONTROL
--------------------------------------------------------------=------
INTERSECTION TYPE: T-INTERSECTION
MAJOR STREET DIRECTION: EAST/WEST
CONTROL TYPE NORTHBOUND: STOP SIGN
TRAFFIC VOLUMES
EB WB NB SB
---- ---- ---- ----
LEFT 0 4 2 --
THRU 658 151 0 --
RIGHT 1 0 13 --
NUMBER OF LANES
----------------------
EB WB NB SB
LANES 1 2 2 --
1985 HCM: SIGNALIZED
INTERSECTIONS
SUMMARY REPORT
INTERSECTION -HARMONY
/SHIELDS
AREA TYPE .....
OTHER
ANALYST .......
EGC
DATE ..........
02-26-1994
TIME ..........
2015 PM
PK HR
COMMENT.......
W/O PROJECT - 1LT,2TH,1RT -
ADD'L LT
SB
--------------------------------------------------------------------------
VOLUMES
GEOMETRY
EB WB
NB
SB :
EB
WB
NB
SB
LT 84 277
73
321 : L
12.0 L
12.0
L 12.0
L
12.0
TH 716 870
840
691 : T
12.0 T
12.0
T 12.0
L
12.0
RT 101 700
193
56 T
12.0 T
12.0
T 12.0
T
12.0
RR 50 250
100
50 : R
12.0 R
12.0
R 12.0
T
12.0
12.0
12.0
12.0
R
12.0
12.0
12.0
12.0
12.0
--------------------------------------------------------------------------
ADJUSTMENT FACTORS
GRADE
HV
ADJ PKG BUSES PHF
PEDS
PED. BUT.
ARR.
TYPE
( )
( )
Y/N Nm
Nb
Y/N min T
EB 0.00
2.00
N 0
0 0.90
5
Y 29.5
3
WB 0.00
2.00
N 0
0 0.90
5
Y 29.5
3
NB 0.00
2.00
N 0
0 0.90
5
Y 26.5
3
SB 0.00
2.00
N 0
0 0.90
5
Y 26.5
3
--------------------------------------------------------------------------
SIGNAL SETTINGS
CYCLE LENGTH =
95.0
PH-1
PH-2
PH-3
PH-4
PH-1
PH-2 PH-3
PH-4
EB LT X
X
NB
LT
X
X
TH
X
TH
X
RT
X
RT
X
PD
PD
WB LT X
X
SB
LT
X
X
TH
X
TH
X
RT
X
RT
X
PD
PD
GREEN 9.0
33.0
0.0
0.0 GREEN
0.0 0.0
5.0
28.0
YELLOW 5.0,
5.0
0.0
0.0 YELLOW
0.0 0.0
5.0
5.0
--------------------------------------------------------------------------
LEVEL OF SERVICE
LANE GRP.
V/C
G/C
DELAY
LOS
APP. DELAY
APP.
LOS
EB L
0.287
0.516
10..1
B
18.4
C
T
0.636
0.368
19.5
C
R-
0.101
0.368
15.0
B
WB L
0.846
0.516
30.5
D
26.7
D
T
0.773
0.368
22.2
C
R
0.896
0.368
33.5
D
NB L
0.311
0.421
14.3
B
26.8
D
T
0.871
0.316
28.7
D
R
0.216
0.316
18.2
C
SB L
0.890
0.421
35.9
D
27.3
D
T
0.716
0.316
23.4
C
R
0.013
0.316
17.0
C
--------------------------------------------------------------------------
INTERSECTION:
Delay
= 25.3 (sec/veh)
V/C =
0.879 LOS
= D
'
1985 HCM: SIGNALIZED INTERSECTIONS
SUMMARY REPORT
INTERSECTION..HARMONY./SHIELDS
'
AREA TYPE ..... OTHER
ANALYST ....... EGC
'
DATE..........02-26-1994
TIME .......... 2015 PM PK HR
COMMENT....... WITH PROJECT - ILT,2TH,1RT
-
ADD.'L LT
SB
'
--------------------------------------------------------------------------
VOLUMES
GEOMETRY
EB WB NB SB EB
WB
NB
SB
LT 88 287 73 321 : L 12.0
L
12.0
L
12.0
L
12.0
'
TH 721 877 845 701 T 12.0
RT 101 700 197 64 T 12.0
T
T
12.0
12.0
T
T
12.0
12.0
L
T
12.0
12.0
RR 50 250 100 50 R 12.0
R
12.0
R
12.0
T
12.0
1------------------
' GRADE HV
(%) (%)
EB 0.00 2.00
WB 0.00 2.00
NB 0.00 2.00
SB 0.00 2.00
------------------
PH-1 PH-2
12.0 12.0
12.0 12.0
----------------------------
ADJUSTMENT FACTORS
ADJ
PKG
BUSES PHF
PEDS
Y/N
Nm
Nb
N
0
0 0.90
5
N
0
0 0.90
5
N
0
0 0.90
5
N
0
0 0.90
5
----------------------------
SIGNAL SETTINGS
PH-3
PH-4
12.0 R 12.0
12.00
--------12_
PED. BUT. ARR. TYPE
Y/N min T
Y 29.5 3
Y 29.5 3
Y 26.5 3
Y 26.5 3
-------------------------
CYCLE LENGTH = 95.0
PH-1 PH-2 PH-3 PH-4
EB LT
X
X
NB
LT
X
X
TH
X
TH
X
RT
X
RT
X
PD
PD
WB LT
X
X
SB
LT
X
X
TH
X
TH
X
RT
X
RT
X
PD
PD
GREEN
9.0
33.0
0.0
0.0 GREEN
0.0 0.0
5.0
28.0
YELLOW
5.0
5.0
0.0
0.0 YELLOW
0.0 0.0
5.0
5.0
--------------------------------------------------------------------------
LEVEL
OF SERVICE
LANE
GRP.
V/C
G/C
DELAY
LOS
APP. DELAY
APP.
LOS
EB
L
0.301
0.516
10.2
B
18.4
C
T
0.641
0.368
19.6
C
R
0.101
0.368
15.0
B
WB
L
0.881
0.516
35.3
D
27.6
D
T
0.779
0.368
22.4
C
R
0.896
0.368
33.5
D
NB
L
0.316
0.421
14.3
B
27.0
D
T
0.876
0.316
29.0
D
R
0.226
0.316
18.2
C
SB
L
0.890
0.421
35.9
D
27.3
D
T
0.727
0.316
23.6
C
R
0.032
0.316
17.1
C
--------------------------------------------------------------------------
INTERSECTION:
Delay
= 25.7
(sec/veh)
V/C
= 0.886 LOS
= D
1985 HCM: SIGNALIZED
INTERSECTIONS
SUMMARY REPORT
INTERSECTION..HARMONY
/SHIELDS
AREA TYPE .....
OTHER
ANALYST .......
EGC
DATE ..........
02-26-1994
TIME ..........
2015 AM
PK HR
COMMENT.......
W/O PROJECT
- ILT,2TH,1RT - ADD'L SB
LT
--------------------------------------------------------------------------
VOLUMES
GEOMETRY
EB WB
NB
SB :
EB WB
NB
SB
LT 137 146
55
414 : L
12.0 L 12.0
L 12.0
L
12.0
TH 1161 235
857
717 : T
12.0 _T 12.0
T 12.0
L
12.0
RT 197 240
195
7 : T
12.0 T 12.0
T 12.0
T
12.0
RR 50 150
100
7 : R
12.0 R 12.0
R 12.0
T
12.0
12.0 12.0
12.0
R
12.0
•
12.0 12.0
12.0
12.0
--------------------------------------------------------------------------
ADJUSTMENT FACTORS
GRADE
HV
ADJ PKG BUSES PHF PEDS
PED. BUT.
ARR.
TYPE
( % )
( % )
Y/N Nm
Nb
Y/N min T
EB 0.00
2.00
N 0
0 0.90 5
Y 29.5
3
WB 0.00
2.00
N 0
0 0.90 5
Y, 29.5
3
NB 0.00
2.00
N 0
0 0.90 5
Y 26.5
3
SB 0.00
2.00
N 0
0 0.90 5
Y 26.5
3
-------------------
7------------------------------------------------------
SIGNAL SETTINGS
CYCLE LENGTH =
92.0
PH-1
PH-2
PH-3
PH-4 PH-1 PH-2 PH-3
PH-4
EB LT X
X
NB LT
X
TH
X
TH
X
RT
X
RT
X
PD
PD
WB LT X
X
SS LT
X
X
TH
X
TH
X
X
RT
X
RT
X
X
PD
PD
GREEN 5.6
35.0
0.0
0.0 GREEN 0.0 0.0
7.0
25.0
YELLOW 5.0
5.0
0.0
0.0 YELLOW 0.0 0.0
5.0
5.0
--------------------------------------------------------------------------
LEVEL OF SERVICE
LANE GRP.
V/C
G/C
DELAY LOS
APP. DELAY
APP.
LOS
EB L
0.259
0.511
9.8 B
26.3
D
T
0.945
0.402
29.7 D
R
0.267
0.402
14.1 B
WB L
0.619
0.511
16.5 C
14.4
B
T
0.191
0.402
13.5 B
R
0.164
0.402
13.4 B
NB L
0.460
0.293
22.0 C
35.1
D
T
0.956
0.293
37.6 D
R
0.238
0.293
18.8 C
SB L
0.955
0.424
43.0 E
25.6
D
T
0.554
0.424
15.5 C
.R
0.000
0.424
17.0 C
--------------------------------------------------------------------------
INTERSECTION:
Delay
= 26.9 (sec/veh) V/C =
0.912 LOS
= D
'
1985 HCM: SIGNALIZED
INTERSECTIONS
SUMMARY REPORT
INTERSECTION..HARMONY
AREA TYPE .....
OTHER
/SHIELDS
ANALYST .......
EGC
'
DATE-- .....02-26-1994
TIME ..........
2015 AM
PK HR
COMMENT.......
WITH PROJECT
- ILT,2TH,1RT
-
ADD'L LT SB
'
--------------------------------------------------------------------------
VOLUMES
GEOMETRY
EB WB
NB
SS :
EB
WB NB
SB
LT 144 149
55
414 : L
12.0 L
12.0 L 12.0
L
12.0
'
TH 1167 237
RT 197 240
865
203
720 : T
9 : T
12.0 T
12.0 T
12.0 T 12.0
12.0 T 12.0
L
T
12.0
12.0
RR 50 150
100
9 : R
12.0 R
12.0 R 12.0
T
12.0
-------------------------------
12.0
12.0
12.0 12.0
12.0
R
12.0
ADJUSTMENT
FACTORS
GRADE
HV
ADJ PKG
BUSES PHF
PEDS PED. BUT.
ARR.
TYPE
'
( % )
( % )
Y/N Nm
Nb
Y/N min T
EB 0.00
2.00
N 0
0 0.90
5 Y 29.5
3
'
WB 0.00
NB 0.00
2.00
2.00
N 0
N 0
0 0.90
0 0.90
5 Y 29.5
5 Y 26.5
3
3
SB 0.00
2.00
N 0
0 0.90
5 Y 26.5
3
'
--------------------------------------------------------------------------
SIGNAL SETTINGS
CYCLE LENGTH =
92.0
PH-1
PH-2
PH-3
PH-4
PH-1 PH-2 PH-3
PH-4
EB LT X
X
NB
LT
X
TH
X
TH
X
'
RT
X
RT
X
PD
PD
'
WB LT X
TH
X
X
SB
LT
TH
X
X
X
X
RT
X
RT
X
X
PD
PD
'GREEN
5.0
35.0
0.0
0.0 GREEN 0.0 0.0
7.0
25.0
YELLOW 5.0
5.0
0.0
0.0 YELLOW
0.0 0.0
5.0
5.0
'
---------------------------------------------------------------
LANE GRP.
V/C
-----------
LEVEL OF SERVICE
G/C DELAY LOS APP. DELAY
APP.
LOS
EB L
0.272
0.511
9.9
B 26.8
D
'
T
R
0.950
0.267
0.402
0.402
30.3
14.1
D
B
WB L
6.631
0.511
17.0
C 14.6
B
T
0.193
0.402
13.6
B
0.164
0.402
13.4
B
'R
NB L
0.463
0.293
22.1
C 36.2
D
T
0.965
0.293
39.0
D
R
SB L
0.258
0.955
0.293
0.424
19.0
43.0
C
E 25.6
D
T
0.556
0.424
15.5
C
R
0.000
0.424
17.0
C
'
-------------------
INTERSECTION:
-------------------------------------------------------
Delay
27.4
(sec/veh)
V/C 0.918 LOS
D
1985 HCM: SIGNALIZED INTERSECTIONS
SUMMARY REPORT
INTERSECTION..HARMONY
AREA TYPE .....
OTHER
/SHIELDS
ANALYST .......
EGC.
DATE..........02-26-1994
TIME ..........
1997 PM PK HR
COMMENT.......
W/O PROJECT-
EXIST GEOMETRY
--------------------------------------------------------------------------
VOLUMES
-
GEOMETRY
'
EB WB
NB
SB : EB
WB
NB
SB
LT 38 140
40
217 : L 12.0 L
12.0
L 12.0
L
12.0
'TH
315 427
RT 44 341
453
106
473 : TR 12.0 T
44 : 12.0 R
12.0
12.0
T 12.0
R 12.0
T
R
12.0
12.0
RR 0 0
0
0 : 12.0
12.0
12.0
12.0
12.0
12.0
12.0
12.0
'
12.0
12.0
12.0
12.0
--------------------------------------------------------------------------
ADJUSTMENT FACTORS
GRADE
( % )
HV ADJ PKG BUSES PHF
( % ) Y/N Nm Nb
PEDS
PED. BUT.
Y/N m i n T
ARR.
TYPE
EB 0.00
2.00
N 0 0 0.90
5
Y 20.5
3
WB 0.00
NB 0.00
2.00
2.00
N 0 0 0.90
N 0 0 0.90
5
5
Y 20.5
Y 17.5
3
3
SB 0.00
2.00
N 0 0 0.90
5
Y 17.5
3
----------------------------------------------------
SIGNAL SETTINGS
7---------------------
CYCLE LENGTH
=
95.0
'
PH-1
PH-2
PH-3 PH-4
PH-1
PH-2 PH-3
PH-4
•
EB LT X
X
NB
LT
X
X
TH
RT
X
X
TH
RT
X
X
PD
PD
'
WB LT X
TH
X
X
SB
LT
TH
X
X
X
RT
X
RT
X
PD
PD
5.0
30.0
0.0 0.0 GREEN
0.0 0.0
5.0
35.0
'GREEN
YELLOW 5.0
5.0
0.0 0.0 YELLOW
0.0 0.0
5.0
5.0
'
--------------------------------------------------------------------------
LANE GRP.
V/C
LEVEL OF SERVICE
G/C DELAY LOS
APP. DELAY
APP.
LOS
EB L
0.156
0.442 12.1
B
21.7
C
TR
0.677
0.337 22.7
C
'
WB L
0.477
0.442 15.8
C
24.4
C
T
0.790
0.337 26.5
0
R
0.743
0.337 25.2
D
'
NB L
T
0.149
0.725
0.495 10.0
0.389 21.4
B
C
19.4
C
R
0.200
0.389 14.6
B
'
SB L
T
0.766
0.757
0.495 26.7
0.389 22.4
D
C
23.2
C
R
0.083
0.389 13.9
B
--------------------------------------------------------------------------
INTERSECTION:
Delay = 22.5 (sec/veh)
V/C =
0.739 LOS
= C
1985 HCM: SIGNALIZED INTERSECTIONS
SUMMARY REPORT
INTERSECTION..HARMONY /SHIELDS
AREA TYPE ..... OTHER
ANALYST ....... EGC
DATE .......... 02-26-1994
TIME .......... 1997 PM PK HR
COMMENT....... WITH PROJECT- EXIST
GEOMETRY
--------------------------------------------------------------------------
VOLUMES
GEOMETRY
EB WB NB SB :
EB
WB
NB
58
LT 42 150 40 217 : L
12.0 L
12.0 L
12.0 L
12.0
TH 319 434 458 483 : TR
12.0 T
12.0 T
12.0 T
12.0
RT 44 341 112 52 :
12.0 R
12.0 R
12.0 R
12.0
RR 0 0 0 0 :
12.0
12.0
12.0
12.0
-
12.0
12.0
12.0
12.0
--------------------------------------------------
ADJUSTMENT FACTORS
GRADE
HV
ADJ
PKG
BUSES PHF
PEDS
( % )
( % )
Y/N
Nm
Nb
EB
0.00
2.00
N
0
0 0.90
5
WB
0.00
2.00
N
0
0 0.90
5
NB
0.00
2.00
N
0
0 0.90
5
SB
--------------------------------------------------
0.00
2.00
N
0
.0 0.90
5
12.0 12.0
12.0 12.0
----------------
PED.
BUT.
ARR. TYPE
Y/N
min T
Y
20.5
3
Y
20.5
3
Y
17.5
3
Y
17.5
3 .
SIGNAL SETTINGS
PH-1 PH-2 PH-3 PH-4 PH-1
--------------------
CYCLE LENGTH = 95.0
PH-2 PH-3 PH-4
EB
LT
X
X
NB LT
X
X
TH
X
TH
X
RT
X
RT
X
PD
PD
WB
LT
X
X
SB LT
X
X
TH
X
TH
X
RT
X
RT
X
PD
PD
GREEN
5.0
30.0
0.0
0.0 GREEN
0.0 0.0
5.0
35.0
YELLOW
5.0
5.0
0.0
0.0 YELLOW
0.0 0.0
5.0
5.0
--------------------------------------------------------------------------
LEVEL OF SERVICE
LANE
GRP.
V/C
G/C
DELAY LOS
APP. DELAY
APP.
LOS
EB
L
0.176
0.442
12.2 B
21.8
C
TR
0.684
0.337
22.9 C
WB
L
0.516
0.442
16.7 C
24.7
C
T
0.803
0.337
27.2 D
R
0.743
0.337
25.2 D
NB
L
0.153
0.495
10.0 B
19.6
C
T
0.733
0.389
21.6 C
R
0.211
0.389
14.7 B
SB
L
0.776
0.495
27.7 D
23.7
C
T
0.773
0.389
23.0 C
R
0.098
0.389
14.0 B
I ,-------------
INTERSECTION:
Delay = 22.8 (sec/veh) V/C = 0.755 LOS = C
1985 HCM: SIGNALIZED INTERSECTIONS
SUMMARY REPORT
INTERSECTION..HARMONY /SHIELDS
AREA TYPE .....
OTHER
ANALYST .......
EGC
DATE ..........
TIME ..........
02-26-1994
1997 AM PK
HR
COMMENT.......W/0
PROJECT
- EXISTING
GEOMETRY
--------------------------------------------------------------------------
VOLUMES
GEOMETRY
EB WB
NB
SB :
ES W8
NB
SB
LT 63 72
30 279
: L
12.0 L 12.0
L 12.0
L
12.0
'
TH 509 115
RT 86 117
464 486
110
: TR
6 :
12.0 T 12.0
12.0 R 12.0
T 12.0
R 12.0
T
R
12.0
12.0
RR 0 0
0
0 :
12.0 12.0
12.0
12.0
'
12.0 12.0
--12_0----
------
12.0
-------------=--
12.0
12.0
--------------------------------
ADJUSTMENT
ADJUSTMENT
FACTORS
'
GRADE
HV ADJ
PKG BUSES
PHF PEDS
PED. BUT.
ARR.
TYPE
( % )
( o ) Y/N
Nm
Nb
Y/N min T
EB 0.00
2.00 N
0
0 0.90 5
Y 20.5
3
'WB
0.00
NB 0.00
2.00 N
2.00 N
0
0
0 0.90 5
0 0.90 5
Y 20.5
Y 17.5
3
3
SB 0.00
2.00 N
0
0 0.90 5
Y 17.5
3
--------------------------------------------------------------------------
SIGNAL
SETTINGS CYCLE LENGTH
=
75.0
PH-1
PH72
PH-3
PH-4 PH-1
PH-2 PH-3
PH-4
EB LT X
X NB LT
X
TH X
X TH
X
'
RT X
X RT
X
PD
PD
'
WB LT X
TH X
SS LT
TH
X
X
X
X
RT X
RT
X
X
PD
PD
'GREEN
22.0 0.0
0.0
3.0 GREEN 0.0 8.0 22.0
0.0
YELLOW 5.0
0.0
0.0
5.0 YELLOW
0.0 5.0
5.0
0.0
'
--------------------------------------------------------------------------
LANE GRP.
V/C
LEVEL
G/C
OF SERVICE
DELAY LOS
APP. DELAY
APP.
LOS
EB L
0.154
0.387
11.5 B
22.9
C
'
TR
WB L
0.889
0.842
0.427
0.320
24.1 C
48.7 E
22.5
C
T
0.224
0.320
14.2 B
R
0.268
0.320
14.5 B
'
NB L
0.290
0.320
14.9 B
27.4
D
T
0.904
0.320
31.3 D
R
0.252
0.320
14.4 B
'
SB L
T
0.796
0.614
0.493
0.493
21.6 C
11.4 B
15.1
C
R
0.009
0.493
7.3 B
'
-----------------------------------------------------------------------
INTERSECTION:
Delay
-21.4
(sec/veh) V/C -
0.877 LOS
- C
1985
HCM: SIGNALIZED INTERSECTIONS
SUMMARY REPORT
INTERSECTION -HARMONY
/SHIELDS
AREA
TYPE ..... OTHER
ANALYST
....... EGC
DATE
.......... 02-26-1994
TIME
.......... 1997 AM
PK HR
COMMENT.......
WITH PROJECT- EXISTING GEOMETRY
--------------------------------------------------------------------------
VOLUMES
GEOMETRY
EB WB NB
SS : ES WB
NB
SB
LT
70 75 30
279 : L 12.0 L 12.0
L 12.0
L
12.0
TH
515 117 472
489 : TR 12.0 T 12.0
T 12.0
T
12.0
RT
86 117 118
8 : 12.0 R 12.0
R 12.0
R
12.0
RR
0 0 0
0 : 12.0 12.0
12.0
12.0
12.0 12.0
12.0
12.0
12.0 12.0
12.0
12.0
-------------------------------------------------------------=------------
ADJUSTMENT FACTORS
GRADE HV ADJ PKG BUSES PHF PEDS
PED. BUT.
ARR.
TYPE
(%) (%) Y/N Nm Nb
Y/N min T
EB
0.00 2.00
N 0 0 0.90 5
Y 20.5
3
WB
0.00 2.00.
N 0 0 0.90 5
Y 20.5
3
NB
0.00 2.00
N 0 0 0.90 5
Y 17.5
3
SB
0.00 2.00
N 0 0 0.90 5
Y 17.5
3
--------------------------------------------------------------------------
SIGNAL SETTINGS
CYCLE LENGTH
=
75.0
PH-1 PH-2
PH-3 PH-4 PH-1
PH-2 PH-3
PH-4
EB
LT X
X NB LT
X
TH X
X TH
X
RT X
X RT
X
PD
PD
WB
LT X
SB LT
X
X
Tf•} X
TH
X
X
RT X
RT
X
X
PD
PD
GREEN 22.0 0.0
0.0 3.0 GREEN
0.0 8.0 22.0
0.0
YELLOW 5.0 0.0
0.0 5.0 YELLOW
0.0 5.0
5.0
0.0
--------------------------------------------------------------------------
LEVEL OF SERVICE
LANE GRP. V/C
G/C DELAY LOS
APP. DELAY
APP.
LOS
EB
L 0.172
0.387 11.6 B
23.6
C
TR 0.898
0.427 25.0 C
WB
L 0.877
0.320 55.6 E
24.4
C
T 0.228
0.320 14.3 B
R 0.268
0.320 14.5 B
NB
L 0.300
0.320 15.1 C
28.8
D
T 0.920
0.320 33.2 D
R 0.270
0.320 14.5 _ B
SB
L 0.796
0.493 21.6 C
15.1
C
T 0.618
0.493 11.5 B
R 0.012
0.493 7.4 B
-------------------=------------------------------------------------------
INTERSECTION: Delay = 22.3 (sec/veh) V/C =
0.886 LOS
= C
1985 HCM: SIGNALIZED INTERSECTIONS
SUMMARY REPORT
INTERSECTION..HARMONY /SHIELDS
AREA
TYPE.....OTHER
ANALYST
.......
EGC
DATE
..........
02-26-1994
TIME
..........
1994 PM PK
COMMENT.......
EXISTING CONDITIONS
---------------------------------------=----------------------------------
VOLUMES
GEOMETRY
EB
WB NB SB,:
EB
WB
NB
SB
LT
35
127 36 197 :
L 12.0 L
12-.0
L
12.0 L
12.0
TH
286
338 412 430 :
TR 12.0 T
12.0
T
12.0 T
12.0
RT
40
310 96 39 :
12.0 R
12.0
R
12.0 R
12.0
RR
0
0 0 0 :
12.0
12.0
12.0
12.0
•
12.0
12.0
12.0
12.0
-
12.0
12.0
12.0
12.0
--------------------------------------------------------------------------
ADJUSTMENT FACTORS
GRADE
HV ADJ PKG
BUSES PHF
PEDS
PED.
BUT. ARR.
TYPE
(%)
(%) Y/N Nm
Nb
Y/N
min T
EB
0.00
2.00. N 0
0 0.90
5
Y
25.8
3
WB
0.00
2.00 N 0
0 0.90
5
Y
25.8
3
NB
0.00
2.00 N 0
0 0.90
5
Y
22.8
3
SB
0.00
2.00 N 0
0 0.90
5
Y
22.8
3
--------------------------------------------------------------------------
SIGNAL SETTINGS
CYCLE LENGTH =
65.0
PH-1
PH-2 PH-3
PH-4
PH-1
PH-2 PH-3
PH-4
EB
LT
X
TH
X
RT
X .
PD
WB
LT
X
TH
X
RT
X
PD
GREEN
25.0
0.0
0.0
YELLOW
----------------------------
5.0
0.0
0.0
LANE
GRP.
V/C
G/C
EB
L
0.306
0.41
TR
0.499
0.41
WB
L
0.366
0.41
T
0.507
0.41
R
0.547
0.41
NB
L
0.112
0.49
T
0.522
0.49
R
0.143
0.49
SB
L
0.673
0.49
T
0.545
0.49
R
0.058
0.49
NB LT
TH
RT
PD
SB LT
TH
RT
PD
0.0 GREEN
0.0 YELLOW
LEVEL OF SERVICE
DELAY
LOS
5 10.1
B
5 11.1
B
5 10.2
B
5 11.2
B
5 11.7
B
2 6.7
B
2 9.0
B
2 6.9
B
2 13.2
B
2 9.3
B
2 6.6
-------------------
B
X
X
X
X
X
0.0 30.0 0.0 0.0
0.0 5.0 0.0 0.0
------------------------
APP. DELAY
11.0
11.2
8.5
10.3
INTERSECTION: Delay = 10.3 (sec/veh) V/C = 0.616
APP. LOS
B
B
B
B
-------------
LOS = B
1985 HCM: SIGNALIZED INTERSECTIONS
SUMMARY REPORT
INTERSECTION..HARMONY /SHIELDS
AREA
TYPE
..... OTHER
ANALYST .......
EGC
DATE
..........
02-26-1994
TIME
..........
1994 AM
PK
COMMENT.......
EXISTING
CONDITIONS
--------------------------------------------------------------------------
VOLUMES
GEOMETRY
EB
WB NB
SB
: ES
WB
NB
SB
LT
57
66 27
254
: L 12.0
L 12.0 L
12.0 L
12.0
TH
463
105 422
442
: TR 12.0
T 12.0 T
12.0 T
12.0
RT
78
106 99
5
: 12.0
R 12.0 R
12.0 R
12.0
RR
0
0 0
0
: 12.0
12.0
12.0
12.0
12.0
12.0
12.0
12.0
12.0
12.0
12.0
12.0
--------------------------------------------
ADJUSTMENT
7-----------------------------
FACTORS
' GRADE
(x)
EB 0.00
WB 0.00
'NB 0.00
SB 0.00
PH-1
HV
(x)
2.00
2.00
2.00
2.00
PH-2
ADJ
PKG
BUSES
PHF
PEDS
PED. BUT. ARR. TYPE
Y/N
Nm
Nb
Y/N min T
N
0
0
0.90
5
Y 25.8 3
N
0
0
0.90
5
Y 25.8 3
N
0
0
0.90
5
Y 22.8 3
N
0
0
0.90
5
Y 22.8 3
-----------------------------
SIGNAL
SETTINGS
7-----------------------
CYCLE LENGTH = 65.0
PH-3
PH-4
PH-1 PH-2 PH-3 PH-4
EB LT
X
NB
LT
X
TH
X
TH
X
RT
X
RT
X
PD
PD
WB LT
X
SB
LT
X
TH
X
TH
X
RT
X
RT
X
PD
PD
GREEN
25.0
0.0
0.0
0.0 GREEN
0.0 30.0
0.0 0.0
YELLOW
5.0
0.0
0.0
0.0 YELLOW
0.0 5.0
0.0 0.0
--------------------------------------------------------------------------
LEVEL OF SERVICE
LANE
GRP.
V/C
G/C
DELAY
LOS
APP. DELAY
APP. LOS
EB
L
0.130
0.415
8.9
B
17.6
C
TR
0.830
0.415
18.5
C
WB
L
0.355
0.415
10.4
B
9.4
B
T
0.158
0.415
9.0
B
R
0.187
0.415
9.2
B
NB
L
0.080
0.492
6.6
B
8.6
B
T
0.534
0.492
9.2
B
R
0.148
0.492.
6.9
B
SB
L
0.898
0.492
30.3
D
16.9
C
T
0.560
0.492
9.4
B
R
0.007
0.492
6.4
B
--------------------------------------------------------------------------
INTERSECTION:
Delay =, 14.0 (sec/veh)
. V/C
= 0.867 LOS
= B
APPENDIX
be exceeded and a temporary turnaround should be
built. The Connector Roadway should be complet-
ed to South Shields Street with Phase II of
Westbury.
> As presently drawn on the site plan (described
herein), the Connector Roadway can provide rea-
sonable access to the property south of Westbur-
y. This can be accomplished by striping back to
back left -turn lanes with a common taper on the
Connector Roadway approach to South Shields
Street.
> A connection to the Ridge subdivision is not needed and
therefore, is not recommended.
17
tions provided the following auxiliary lanes are
constructed:
1) A westbound left -turn lane on West Harmony Road
having 25 feet of vehicular storage.
2) A southbound right -turn lane on South Shields Street.
3) A northbound left -turn lane on South Shields Street
having 25 feet of vehicular storage.. This lane is
not necessary; however, it can be easily provided by
simple striping changes.
The above described lanes should have deceleration
distances of 310 feet including the taper.
> With implementation of the improvements noted
above, Westbury traffic will not create a no-
ticeable change in traffic conditions on adja-
cent streets and intersections.
> Sidewalks should be constructed along the south
side of West Harmony Road between the site and
Regency Drive.
> Constructing the Connector Roadway from West
Harmony Road to the south is acceptable to ac-
commodate Phase I development (19 lots). The
maximum cul-de-sac length of 900 feet shall not
16
VI. CONCLUSIONS
Based on the analyses, investigations, and discussions noted
above, the following can be concluded:
> Site generated traffic is considered minimal.
It is expected to result in 50 morning peak -hour
trips, 67 afternoon peak -hour trips, and 651
daily trips.
> The West Harmony Road - South Shields Street
intersection will operate at level -of -service
(LOS) "C" under 1997 conditions with Westbury
fully developed. Without Westbury, the inter-
section is still expected to operate at LOS "C".
> In the long-term (2015), the West Harmony Road -
South Shields Street intersection is expected to
operate at LOS "D" whether or.not Westbury is
built. This level -of -service will require a
left -turn lane, two through lanes, and a right -
turn lane in each direction plus an additional
southbound left -turn lane.
> The Connector Roadway intersections with West
Harmony Road and South Shields Street will oper-
ate acceptably under short- and long-term condi-
15
the Connector Roadway turning north. Accordingly, the property
to the south can be accommodated, if deemed appropriate, at some
later date.
C. Phasing of Connector Roadway Construction
Phase I of Westbury is expected to be comprised of 19 lots
on the northern part of the site. These lots will likely be
fully built by the end of 1995. To serve these lots, the Connec-
tor Roadway should be constructed from West Harmony Road to the
south a distance not to exceed the maximum allowable cul-de-sac
distance (900) feet. A temporary turnaround should be provided
at the temporary end of the Connector Roadway. The Connector
Roadway should be extended to connect to South Shields Street
when Phase II commences.
D. Sidewalks Along Harmony Road
There is concern about how children in the area will get to
school since there are presently no sidewalks along West Harmony
Road. While it appears that Elementary school children will be
bussed, it seems appropriate that sidewalks should be constructed
for Junior High School students along the south side of West
Harmony Road to the west of the site. This would permit school
children to walk west along West Harmony Road to Regency Drive
before heidiaq`nbrth'to the school complex.
14
V. OTHER ISSUES
The following issues have been raised by City Staff during
the review process.
' A. Ridge Connection
The need to provide a connector between Westbury and the
' Ridge subdivision has been discussed. A review of both the Ridge
access and circulation patterns, as well as, the proposed access
' and circulation patterns for Westbury has been undertaken. It
appears that both subdivisions can adequately function without
this connector and, therefore, the reason or purpose for the
' connector is unknown. Consequently, the connection between the
subdivisions is not recommended.
' B. Relationship to Property to the South
The City Traffic Engineer has stated that access to the
' parcel to the south of Westbury must be provided via the Connec-
tor Roadway since direct access to South Shields Street will not
' be allowed. Assuming a 30 mile per hour speed limit, a common
taper and two 25 foot back to back left -turn bays, some 300 feet
is needed t• accommodate a westbound left turn t• the property.
As presently planned, approximately, 310 feet will be available
west of South Shields Street along the Connector Roadway prior to
' 13
' The need to construct auxiliary lanes at the Connector
' Roadway intersections with West Harmony Road and South Shields
Street was investigated. This investigation found that a decel-
eration lane is appropriate for the westbound left -turn movement
from Harmony Road to Westbury. This lane should be twelve (12)
' feet wide, have twenty-five (25) feet of vehicular storage and
' have a deceleration distance of 310 feet including the taper
length. A right turn deceleration lane is not considered neces-
sary.
' At the South Shields Street intersection with the Connector
' Roadway, a southbound right -turn deceleration lane is considered
appropriate. This lane should be 12 feet wide and extend some
310 feet north of the intersection, including the taper distance.
A northbound left -turn lane is not necessary, however, given the
' available painted median, it can be easily provided. According-
ly, minor striping changes are considered appropriate to provide
this lane. The striping modification should conform to the
' dimensions indicated for the left -turn lane at the West Harmony
Road - Connector Roadway intersection.
I1 12
Table 5
South Shields Street - Connector Roadway
Short- and Long -Term Peak -Hour Operations
Critical Movement
Levels -of -Service
............................
.............................
..................
.............................
AM
PM
AM
PM
EB LT
E
D
F
E
EB TH
E
D
E
D
EB RT
A
A
A
A
WB LT
E
D
E
E
WB TH
E
D
E
D
WB RT
A
A
A
A
SB LT
B
A
D
A
NB LT
A
A
L..j
A
A
Table 4
West Harmony Road - Connector Roadway
Short- and Long -Term Peak -Hour Operations
Critical Movement
Levels -of -Service
.............................
.............................
............................
.............................
.............................
AM
PM
AM
PM
NB LT
C
C
C
D
NB RT
A
A
B
A
rBL
A
A
A
A
U
' be noted that the difference in average delay per vehicle (with
' or without Westbury) was less than one second and, for the most
part, less than one-half second at this intersection.
1
The West Harmony Road and South Shields Street intersections
' with the Connector Roadway were also evaluated. The evaluation
' included both short- and long=term conditions. These intersec-
tions are planned to operate under stop sign control.
Levels -of -service resulting from these evaluations are as indicated on
Tables 4 and 5.
' As shown, the West Harmony Road - Connector Road intersec-
tion is anticipated to operate acceptably under all scenarios.
Level -of -service (LOS) "D" or better can be achieved under both
short- and long-term conditions.
The South Shields Street - Connector Roadway is also expect-
ed to operate at acceptable levels -of -service with one exception.
The exception, the 2015 morning peak -hour eastbound left -turn, is
likely to drop to LOS "F". This is considered reasonable given
the time.frame evaluated and the movement itself. This short-
lived event can and should be tolerated since it will probably
end up being one of the better operating intersections in the
year 2015.
11
Table 3
West Harmony Road - South Shields Street (Signalized)
Long Term
2015 Level -Of -Service
..................... .............. ..........
.
Wtili :h?r:ajCt: ioitt:Prigc:
Approach AM PM AM PM
II Eastbound I D I C II D I C
II westbound I B I D II B I D
II Northbound I D I D II D I D
Table 2
West Harmony Road - South Shields Street (Signalized)
Short Term
Approach
Eastbound
(Westbound
(Northbound
1997 Level -Of -Service
........................
..................... .........................
..................... .........................
{ ti:P .0.3 : :4 fti gist: .....
AM PM AM PM
C C C C
C C
D C
C C
D C
IV. TRAFFIC IMPACTS
Intersections were evaluated using Highway Capacity analysis
procedures. These evaluations were undertaken using short- and
long-term traffic volume projections and the anticipated roadway
geometry.
For evaluation purposes, desirable operations are defined as
level -of -service "D" or better under peak hour conditions at
signalized locations. At unsignalized locations, level -of -
service "E" is considered acceptable for critical left -turn
movements. Other movements should operate at level -of -service
"D" or better. These levels -of -service are considered normal, if
not better than normal, at unsignalized intersections during
peak -hour conditions. At off-peak times, significantly better
operating conditions can be expected.
Using the traffic volumes presented on Figures 3 and 4, the
West Harmony Road - South Shields Street intersection was evalu-
ated for morning and afternoon peak -hour periods. Both short -
and long-term scenarios were investigated, as well as, operating
conditions both with and without Westbury. The investigation
resulted in the finding that level -of -service "D" or better can
be achieved under all morning and afternoon peak -hour traffic
loadings in 1997 and 2015 (see Tables 2 and 3). It should also
10
West Harmony Road
0/892
2/4 —�
WI
I
00
\
* Negligible
xx/xxx = Site/Total
4/88—a
5/721io
0/101----4
Connector
12/24-a
3/6 �
O
�1 f, N
o
00 O
j I �
k—'0/700
< 7/877
jg---10/287
I T r
r'1 u1 t�
n � a
\ cp .y
O n \
O
.7
U)
O
O
-T
\
O
\
O
\
O
'N)
`
FRCC
k-- 0/94
�— 0/28
N
\
I"
O`
N
O
�O
\
O
2015 PM Peak -Hour
West Harmony Road
0/1480
1/2
d
N
xx/xxx = Site/Total
<-0/293 7/144---A
v-4/8 6/116730
0/ 197 �1
16/32 -a
0/0
6/12
O -11
N M O
Ln Vl m
in �D O
\ 00 N
O \ \
O -17
N %D C1
ti n N
�O O O
j I �
�- 0/240
�2/237
14'-3/149
- 0/22
0/0
�- 0/12
ilyuic j
2015 AM Peak -Hour
0/397
2/2
w
O
U
N
C
C
O
U
# Negligible
xx/xxx = Site/Total
E— 0/511 4/42 ---A
Ir-- 15/15 5/319 —ao
0/44 "y
k— 0/341
E— 7/434
14-101150
k-0/47
4 */*
je�--0/ 14
rigure 4
1997 PM Peak -Hour
-7
N
West Harmony Road
0/658
r
C1
C1
# Negligible
xx/xxx = Site/Total
7/70
6/515
0/86
Connector
00 rl-
00 It N
N C1 O
j I �
I T r
N OJ
O r-
C1 _.7 ti
\ \ \
O 00 CO
M �
�O O O
� T �
r1
ON cn
N V) 1-
\ \ \
N O O
k— 0/ 117
12/117
vI_ 3/75
Figure 3
1997 AM Peak -Hour
II
E1
11
South 1 15%
East 1 40%
West 1 5%
E. Traffic Assignments and Volumes
Utilizing the trip generation estimates and distribution
assumptions discussed above, site trips were assigned to the
existing street system. Figures 3,and 4 show short range (1997)
peak -hour traffic volumes for both site and background traffic at
the West Harmony Road - South Shields Street intersection. Long
range (2015) peak -hour traffic volumes were developed by using
the daily traffic volume projections developed by the City.
Long-range site and background peak -hour traffic volumes are
presented on Figures 5 and 6. Estimated turning movement traffic
volumes at the Connector Roadway intersections with the arterial
street system are also presented on these figures. Traffic
volumes and associated turns internal to the site were considered
minimal and were not given further consideration.
9
Site access is planned via a Connector Roadway connecting to
both West Harmony Road and South Shields Street. This roadway
will connect to West Harmony Road some 900 feet west of South
Shields Street where it will form a tee intersection. At this
point, the land along the north side of West Harmony Road is
undeveloped. To the west of the vacant ground a church exists.
Given these land uses, the church's hours of operation, and
driveway spacing, no conflicts with the Connector Roadway inter-
section are expected.
The Connector Roadway will connect to South Shields Street
some 1,135 feet south of West Harmony Road. It will line up
opposite the existing Front Range Community College (FRCC)
driveway forming a four-way intersection.
The numerical distribution of site traffic is estimated as
-indicated on the following page.
8
intersection sometime during mid-1994. Accordingly,
this improvement is considered operational during both
evaluation years.
2. West Harmony Road will curve to the north and connect to
New Harmony Road. This will modify the existing grid
and reduce the role of West Harmony Road west of New
Harmony Road. This modification is currently being
pursued by the City and is assumed fully functional by
2015.
3. West Harmony Road will be downgraded to an arterial
roadway (100 feet R.O.W.) from a major arterial roadway
in the area of the site. Accordingly, the future West
Harmony Road cross-section will have two through lanes
in each direction plus a painted left -turn median. Per
City Staff, funding for this major improvement is not
currently available. It is assumed fully constructed to
arterial roadway standards, however, by the 2015 evalua-
tion year.
D. Trio Distribution
Trip distribution is a function of the origin and destina-
tion of site users, their work and shopping patterns, and the
available roadway system. In this case, the area's major work
center is situated north and east of Westbury. Shopping activity
centers, for the most part, are located north of the site.
Given the site's direct access (via a local street sized
Connector Roadway) to the arterial street system, site traffic is
not expected to use any external, local, or collector streets.
Site traffic, for the most part, is expected to use South Shields
Street since the higher density development will occur closer to
South Shields Street than West Harmony Road.
7
Phase-
Use
Units
Daily
AM Peak -Hour
PM Peak -Hour
::::::::::::::
::::::::::::::::::
Pota:I$:::ipt
01-SF
19
9.55
181
0.74
14
4
10
1.61
19
12
7
02-SF
37
9.55
353
0.74
27
7
20
1.01
37
24
13
O2-MF
20
5.86
117
0.44
9
2
10.55
11
7
4
TOTAL
76
651
50
13
37
67
43
24
Per Drelling Unit
As shown above, Westbury will generate approximately 651 trips
per day with 50 and 67 trips occurring during the morning and
afternoon peak -hour periods, respectively. These volumes are
considered minimal.
C. Assumed Roadway System
The area surrounding the site is currently undergoing the
transition from a rural to an urban setting. The same can be
stated about the roadway system serving the area. Accordingly,
significant planning efforts have been undertaken to establish
the basic arterial roadway system which will serve the future
needs of this maturing area. At this time, the following roadway
changes are anticipated.
1. The West Harmony Road - South Shields Street intersec-
tion is currently signalized; however, protected left -
turn phases are not provided. The City plans to install
left -turn phasing in an effort to reduce delays at this
6
annual growth rate between 1994 and 1997. Long-term traffic
volume projections for the year 2015 were obtained from the City
of port Collins. These estimates represent annual growth rates,
adjacent to the site, of five (5) and twelve (12) percent on West
Harmony Road and South Shields Street respectively. Background
traffic volumes (without Westbury) were developed using the above
discussed growth rates for the 1997 and 2015 evaluation years
under both peak -hour conditions.
Side street traffic volumes were assumed to double between
1997 and 2015. This is a direct result of future development
sharing the existing access points and future access restrictions
on arterial streets and, to some degree, cut through traffic.
B. Site Generated Traffic
To estimate the traffic generated by the proposed develop-
ment, standard trip generation rates compiled by the Institute of
Transportation Engineers in their report entitled Trip Genera-
tion. Fifth Edition were utilized for appropriate land uses.
These rates were utilized to determine daily, morning and after-
noon peak -hour traffic volumes expected to be generated by the
site. Resultant traffic volumes are shown on the following page.
5
Table 1
West Harmony Road - South Shields Street (Signalized)
Current
Level -of -Service
ti
ENestbound.
..........
................
p................
und
C
B
B
B
Northbound
B
B
Southbound
C
B
.:.:.:.;.:.
.O..E....
Both peak -hour periods were analyzed using capacity analysis
procedures. These analyses revealed that each approach and the
overall intersection operates at level -of -service "B" under both
peak -hour traffic loadings (see Table 1). Capacity worksheets
are included in the Appendix.
C. Surrounding Land Uses
Westbury will be constructed on land that is currently
vacant. With minor exception, residential developments presently
dominate the area surrounding the site. The exception is Front
Range Community College (FRCC) which is located along the east
side of South Shields Street, south of West Harmony Road.
Additionally, significant amounts of land are currently undevel-
oped.
III. FUTURE TRAFFIC CONDITIONS
A. Growth in Background Traffic
Both the short-term (1997) and long-term (2015) traffic
volume projections were developed for the two arterial roadways
adjacent to the site. Current peak -hour turning movement counts
were increased on the basis of historical growth in daily traffic
volumes. This resulted in approximately a three (3) percent
4
West Harmony Road
57/35 -�
463/286�
78/40
xx/xx = AM/PM
o
\
\
M
N
L7
\
-11
V1
u'1
-
I�7.
W
IIN�
y
T I
�C
N
M
�
�
IN
\
\
N
N
O�
N
�
J
n
tl O
V) N
O .11
I L
T r
106/310
105/388
14,— 66/127
k-10/43
141— 5/13
W
W
re 2
1994 Peak -Hour Traffic
metropolitan area and beyond. The posted speed limit is 35 miles
per hour. Adjacent to the site, South Shields Street has one
lane in each direction and a painted two-way left -turn median.
Current daily traffic volume on South Shields Street is 14,500
vehicles per day adjacent to the site.
The West Harmony Road - South Shields Street intersection is
currently under traffic signal control. Three of the four
approaches to this intersection have one left-, one through, and
one right -turn lane. The fourth approach on eastbound West
Harmony Road has a left -turn lane and a shared through and right -
turn lane.
B. Existing Traffic Conditions
Turning movement counts were undertaken at the West Harmony
Road,- South Shields Street intersection for both the morning and
afternoon peak -hours. Directional biases were noted during both
peak -hour periods. As might be expected, these biases appear to
be based upon the geographic location of employment centers and
Interstate 25. Turning movement counts are presented on Figure
2.
The West Harmony Road - South Shields Street intersection
was evaluated using current traffic volumes and roadway geometry.
3
> Recommend measures to mitigate the impact of
site generated traffic as appropriate.
> Address other issues which have been identi-
fied during the course of this study or by
others.
II. EXISTING CONDITIONS
A. Existinc Road Network
The site is bordered by West Harmony Road on the north and
South Shields Street on the east. These roadways are both
classified as arterial streets and are under City of Fort Collins
jurisdiction.
West Harmony Road provides east -west circulation extending
one mile to the west and a significant distance to the east. It
extends to and connects with Interstate 25 thereby providing
regional access. In the immediate area of the site, West Harmony
Road serves some 10,000 vehicles daily.- The posted speed limit
is 35 miles per hour on this roadway which has two travel lanes,
one in each direction. Spot widening has occurred both east and
west of the site to accommodate auxiliary lanes.
South Shields Street has a significant role in the north -
south street system. It traverses the entire Fort Collins
2
GROSS ACRES 245
SF LOTS 56
MF LOTS 20
LOTS 16
DENSITY 3.1
SOLAR LOTS 51(615)
LOTS MEETING SOLAR
^� ACCESS REQUIREMENTS
V PROPOSED TREES
EXISTING TREES
eAPPROX LOCATIONS)
r
._ - :.. -
GRc 55 GALLERY i {,
0
SI �
I
SINGLE FAMILY (GRE55)
I nl
I Ill
N
�^
tY r7 tt G
S e 1 • b li 1) If 5 K I III
I I I 1
12
13
JA
is >s
u
' Figure 1 - SITE/LOCATION PLAN
I
I
'
I. INTRODUCTION
'
Westbury is a proposed residential development situated on
the south
side of West Harmony Road west of South Shields Street
'.
in Fort Collins, Colorado. The site plan and location is shown
'
on Figure
1. The development will be comprised of fifty-six (56)
single family and twenty (20) multi -family residential units.
This
study follows the established guidelines for traffic
impact studies as are applicable and appropriate to the proposed
'
project.
The following key steps were undertaken as part of this
study.
>
Obtain current traffic and roadway data in
the immediate the
area of site.
'
>
Evaluate current traffic operations to estab-
lish the base condition.
'
>
Determine site generated traffic volumes and
distribute this traffic to the nearby street
system.
'
>
Project roadway traffic volumes for both
short- and long-term conditions.
'
>
Evaluate traffic operations with Westbury
fully operational under both short- and long-
term conditions.
>
Identify areas of potential deficiencies.
TABLE OF CONTENTS
I.
INTRODUCTION . . . . . . . . . . . . . . . . .
. . . . . 1
II.
EXISTING CONDITIONS . . . . . . . . . . . . .
. . . . . 2
A. Existing Road Network . . . . . . . . . .
. . . . . 2
B. Existing Traffic Conditions . . . . . . .
. . . . . 3
C. Surrounding Land Uses . . . . . . . . . .
. . . . . 4
III.
FUTURE TRAFFIC CONDITIONS . . . . . . .
. . . . . 4
A. Growth in Background Traffic . . . . . . .
. . . . . 4
B. Site Generated Traffic . . . . . . . . . .
. . . . . 5
C. Assumed Roadway System . . . . . . . . . .
. . . . . 6
D. Trip Distribution . .
. . . . 7
E. Traffic Assignments and Volumes . . . . .
. . . . . 9
IV.
TRAFFIC IMPACTS . . . . . . . . . . . . . . .
. . . . . 10
V . OTHER ISSUES . . . . . . . 13
A. Ridge Connection . . . . 13
B. Relationship to Property to the South . . . . . . . 13
C. Phasing of Connector Roadway Construction . . . . . 14
D. Sidewalks Along Harmony Road . . . . . . . . . . . . 14
VI. CONCLUSIONS . . . . . . . . . . . . . . . . . . . . . . 15
i
Traffic Impact Study
Westbury
Fort Collins, Colorado
Prepared For:
Linder Real Estate
3500 JFK Parkway Suite 221
Ft. Collins, Colorado 80525
Prepared By:
Eugene G. Coppola
P. O. Box 260027
Littleton, CO 80126-0027
303-792-2450
March 2, 1994