Loading...
HomeMy WebLinkAboutCOLUMBINE CARE CENTER EAST P.U.D. - PRELIMINARY & FINAL - 12-94 - CORRESPONDENCE -4. The.Poudre Fire Authority feels that this parking lot addition could enhance the access to the rear of the existing building at 421 Parker. The existing driveway will have to be torn out to construct the new parking lot and driveway. 5. This property is in the Spring Creek Storm Drainage Basin and is subject to the basin fees of $1,.804 per acre, based on the land use runoff coefficient. The fees can.be reduced if on - site stormwater detention is provided and approved by the Stormwater Utility. The proposed development is required to detain, on -site, the difference between the amount of impervious area created by the previous house on the property and the proposed new parking lot. The on -site water detained should be released into the street. A small drainage report and erosion control plan must be part of the P.U.D. submittal. Please contact Glen Schlueter, at 221-6589, with questions pertaining to.storm drainage. 6. Utility plans must be part of the P.U.D. submittal and should show the removal of the existing driveway, construction of the new driveway, and the sidewalk location. 7. No street oversizing fees will apply to this new parking lot. development. 8. A Landscape Plan must be part of the P.U.D. submittal documentation. 9. A neighborhood information meeting will be required prior to formal submittal of this P.U.D. review request. An area of notification map will be provided to you by the. Planning Department to enable you to generate the affected property owner's list for the mailing. Please contact Steve Olt, at 221-6750, for assistance in scheduling the meeting. r CONCEPTUAL REVIEW STAFF COMMENTS MEETING DATE:, October 25, 1993 ITEM: Columbine Care Center East APPLICANT: Frank Vaught Vaught -Frye Architects 1113 Stoney Hill Drive Fort Collins, CO. 80525 LAND USE DATA: Request. for a parking lot for 11 automobiles on a vacant lot adjacent to the Columbine Care Center. This lot.is zoned RL, Low Density Residential. COMMENTS: 1. The existing Columbine Care Center East facility is in the RH, High Density Residential Zoning District and the vacant lot to the west, proposed to be a parking lot for the center, is in the RL, Low Density Residential Zoning District. A parking lot is not a permitted "use -by -right" in this zoning district; therefore, the request must be processed and reviewed as a planned unit development (P.U.D.), with a final decision being given by the Planning and Zoning Board. 2. The Light & Power Department has indicated that they have an existing underground vault located in the area of the northeast corner of this property. The vault appears to be "safe" from impacts of the proposed parking lot.. Standard electric development charges will apply to this request and the charges will be based on the square footage and street front footage of the proposed development. Alan Rutz is your contact person with.questions about electric service. He can be reached at 221-6700. 3. There are existing water and sanitary sewer services to this property that will have to be abandoned back to the mains if they are to serve no purpose after construction of the parking lot. Please contact Mary Young of the Water/Wastewater Department for information on the status of these services with this development. She can be reached at 221-6681. ENVIRONMENTAL SERVICES 281 NORTH COLLEGE P.O.BOX 580 FORT COLLINS, COLORADO80522-0580 (303)221.6750 PLANNING DEPARTMENT l Commi. ..y Planning and Environmental rvices Planning Department City of Fort Collins October 29, 1993 Frank Vaught Vaught -Frye Architects 1113 Stoney Hill Drive Fort Collins, CO. 80525 Dear Frank, For your information, attached is a copy of the Staff's comments concerning the request for . Columbine Care Center East, which was presented before the Conceptual Review Team on October 25, 1993. This is a request for a parking lot for 11 automobiles on a vacant lot located at 345 Parker Street. The parking is for the Columbine Care Center next door, at 421 Parker Street. The comments are offered informally by Staff to assist you in preparing the detailed components of the project application. Modifications and additions to these comments may be made at the time of formal review of this project. If you should have any questions regarding these comments or the next steps in the review process, please feel free to call me at 221-6750. Y, ject Planner xc: Tom Peterson, Planning Director G�1-Engineer— r ��`P�✓ Sherry Albertson -Clark, Chief Planner Stormwater Utility Transportation Department File 281 North College Avenue • P.O. Box 580 • Fort Collins, CO 80522-0580 • (303) 221-6750