Loading...
HomeMy WebLinkAboutCOLUMBINE CARE CENTER EAST P.U.D. - PRELIMINARY & FINAL - 12-94 - CORRESPONDENCE - STAFF'S PROJECT COMMENTS_ c on schedule for the April 25,.,:,1994 .Planning and...Zoning Board hearing: '.plan revisions are due April 6, 199-4. .'Please :•contact se for the -n: number,cf.. o de revisions required..for each document. PXT.Is, renderings, and 8 folded copies of final revisions (for the Planning and Zoning Board packets) are due -by 3:00 p.m. on April 18, 1994. Please contact me at 221-6750 if you have questions or concerns related to these comments. I would like to schedule a meeting with Aee you as soon as possible,.,.if necessary, to discuss these comments. y. .. . t _:Project Planner - :.xc: Ron -Phillips _ Kerrie Ashbeck Advance -Planning Stormwater Utility Transportation Parks & Recreation - -file/Project Planner r -- vebioular usiareas shall be surfaced with._asphalt, concrete or--other-material-in-conformance-with-City=specifications. 6. There' should " be a' legal description` of "the -••property on the Site & Landscape Plan. - 7.`� There is, building -and parking lot :lighting shown on the Site & Landscape Plan.. The. City and -the neighborhood have. _ concerns about what type of lighting is proposed -and what protection will be taken to assure that light spillage off - site will not occur (see the- copy of a letter .from Karen` -.....Lennon,, attached). 8;. The berms as shown on the Site & Landscape Plan, at 6" contour elevations, will only be 6"`to 12" high. This does not create. ,.. much of a buffer-r:to mitigate car headlights _.impacting the:*;'- residence....to the west. Also, the gap between the .proposed Austrian Pines apparently is in:direct.line with..the bedroom windows.. of .:the.. residence (see the copy of;a letter from Karen Lennon, -.attached), and the. lack of berming and year-round full: plant materials does not prevent headlights from escaping. The existing -house on the lot at 335 Parker Street must be shown - (including window locations) on the plan. 9 Information should be provided on the materials and colors of the proposed -trash -enclosure. How will this_structure:relate .to the building? 10. The identification leaders for the pole peel mulch and the-3'= (not 1) Isanti Dogwood on the west side of the property appear to be reversed. 11. A north arrow", for "the Vicinity;.Map on the ::Site & _Landscape Plan_,should.be•--provided.. .12. Is there steel edging along the west side of the planting bed south of the'new parking lot? 13. The General' Note on the Site & Landscape Plan about the timing. for the landscaping should read "All landscaping shall be installed' or'- secured- with -a -financial ::instrument for -125V.of the estimated. -.value of, the landscape improvements. prior to issuance of a certificate of occupancy". 14. Where do the employees of the Columbine Care Center park now? Who is, going to use the new parking lot? The net parking gain with 6 spaces seems to be minimal. Will there be a commitment by, the center to get much or most of its related parking :(employees,: visitors) off the surrounding streets? This completes the review comments at this time. Additional comments ,may.- be ...forthcoming. as,-:the.:.:.var-ious .departments_ Land reviewing agencies continue to review this request. Please be aware of the following dates and deadlines to assure your ability to stay _ ...Staff has ',reviewed your documents for the. Columbine Care Center:. Bast-P.U.D. -'Preliminary/Final-that were submitted to the City on'-. -March 7, 1994 and =Would like to offer the following—m- ,comments: I The Public Service Company has stated that no trees can be planted within 41 of any gas line. 2..- Exterior routes of travel and paikinglacilities.,for use `by the --handicapped shall be provided -in accordance with the -.1991 Uniform Building Code.Appendix Chapter,L.31'- 'There -must be at least 1 handicapped parking -space in this lot.A building permit is required for installation of the parking lot lighting. Please contact -Sharon Getz of the Building Inspection Department if you have questions about the building code requirements:_ --Sharon can,-be.reached at 221-6760. �.., 3. A statement of _compliance with the Storm Drainage Design Criteria must be provided to -the Storavater Utility. �The 8" .,,Dvc pi e is not'acceRtable. The pipe will go underneath Parker Street, and anything that is in a right-of-way requires a 15" rcp, minimum. Is the existing. parking lot going to be paved at this time? If yes, it needs to be accounted for now. from a ~storm-' drainage -point of view. Please contact Basil Hamdan.-of .the Storavater Utility. if,you..have.questions about--the.:storm drainage comments and concerns. Basil can be reached at 221- 6589. .4. :The Site' & Landscape Plan must show information on.existing -."uses-and improvements within'..-1501 -on.-all four sides, as defined,.. in the., submittal requirements in -the Development Manual. 5. What is the surf ace-. material of the existing- parking lot i .-behind-. the.- building -on -the -south.--side?- Will-A-t - --be- paved -with the construction of the new parking lot? Section 29-492 (4) of the City Code requires that all open off-street parking and 281 North College Avenue - P.O. Box 580 - Fort Collins; CO S0522-0550 - (303) 121-6750