HomeMy WebLinkAboutCOLUMBINE CARE CENTER EAST P.U.D. - PRELIMINARY & FINAL - 12-94 - CORRESPONDENCE - STAFF'S PROJECT COMMENTS_ c
on schedule for the April 25,.,:,1994 .Planning and...Zoning Board
hearing:
'.plan revisions are due April 6, 199-4. .'Please :•contact se for the
-n:
number,cf.. o de revisions required..for each document.
PXT.Is, renderings, and 8 folded copies of final revisions (for the
Planning and Zoning Board packets) are due -by 3:00 p.m. on April
18, 1994.
Please contact me at 221-6750 if you have questions or concerns
related to these comments. I would like to schedule a meeting with
Aee
you as soon as possible,.,.if necessary, to discuss these comments.
y.
.. .
t
_:Project Planner -
:.xc: Ron -Phillips
_ Kerrie Ashbeck
Advance -Planning
Stormwater Utility
Transportation
Parks & Recreation -
-file/Project Planner
r
-- vebioular usiareas shall be surfaced with._asphalt, concrete
or--other-material-in-conformance-with-City=specifications.
6. There' should " be a' legal description` of "the -••property on the
Site & Landscape Plan. -
7.`� There is, building -and parking lot :lighting shown on the
Site & Landscape Plan.. The. City and -the neighborhood have.
_ concerns about what type of lighting is proposed -and what
protection will be taken to assure that light spillage off -
site will not occur (see the- copy of a letter .from Karen`
-.....Lennon,, attached).
8;. The berms as shown on the Site & Landscape Plan, at 6" contour
elevations, will only be 6"`to 12" high. This does not create.
,..
much of a buffer-r:to mitigate car headlights _.impacting the:*;'-
residence....to the west. Also, the gap between the .proposed
Austrian Pines apparently is in:direct.line with..the bedroom
windows.. of .:the.. residence (see the copy of;a letter from Karen
Lennon, -.attached), and the. lack of berming and year-round full:
plant materials does not prevent headlights from escaping. The
existing -house on the lot at 335 Parker Street must be shown -
(including window locations) on the plan.
9 Information should be provided on the materials and colors of
the proposed -trash -enclosure. How will this_structure:relate
.to the building?
10. The identification leaders for the pole peel mulch and the-3'=
(not 1) Isanti Dogwood on the west side of the property appear
to be reversed.
11. A north arrow", for "the Vicinity;.Map on the ::Site & _Landscape
Plan_,should.be•--provided..
.12.
Is there steel edging along the west side of the planting bed
south of the'new parking lot?
13. The General' Note on the Site & Landscape Plan about the timing.
for the landscaping should read "All landscaping shall be
installed' or'- secured- with -a -financial ::instrument for -125V.of
the estimated. -.value of, the landscape improvements. prior to
issuance of a certificate of occupancy".
14. Where do the employees of the Columbine Care Center park now?
Who is, going to use the new parking lot? The net parking gain
with 6 spaces seems to be minimal. Will there be a commitment
by, the center to get much or most of its related parking
:(employees,: visitors) off the surrounding streets?
This completes the review comments at this time. Additional
comments ,may.- be ...forthcoming. as,-:the.:.:.var-ious .departments_ Land
reviewing agencies continue to review this request. Please be aware
of the following dates and deadlines to assure your ability to stay
_ ...Staff has ',reviewed your documents for the. Columbine Care Center:.
Bast-P.U.D. -'Preliminary/Final-that were submitted to the City on'-.
-March 7, 1994 and =Would like to offer the following—m-
,comments:
I The Public Service Company has stated that no trees can be
planted within 41 of any gas line.
2..- Exterior routes of travel and paikinglacilities.,for use `by
the --handicapped shall be provided -in accordance with the -.1991
Uniform Building Code.Appendix Chapter,L.31'- 'There -must be at
least 1 handicapped parking -space in this lot.A building
permit is required for installation of the parking lot
lighting. Please contact -Sharon Getz of the Building
Inspection Department if you have questions about the building
code requirements:_
--Sharon can,-be.reached at 221-6760.
�..,
3. A statement of _compliance with the Storm Drainage Design
Criteria must be provided to -the Storavater Utility. �The 8"
.,,Dvc pi e is not'acceRtable. The pipe will go underneath Parker
Street, and anything that is in a right-of-way requires a 15"
rcp, minimum. Is the existing. parking lot going to be paved at
this time? If yes, it needs to be accounted for now. from a
~storm-' drainage -point of view. Please contact Basil Hamdan.-of
.the Storavater Utility. if,you..have.questions about--the.:storm
drainage comments and concerns. Basil can be reached at 221-
6589.
.4. :The Site' & Landscape Plan must show information on.existing
-."uses-and improvements within'..-1501 -on.-all four sides, as
defined,.. in the., submittal requirements in -the Development
Manual.
5. What is the surf ace-. material of the existing- parking lot
i .-behind-. the.- building -on -the -south.--side?- Will-A-t - --be- paved -with
the construction of the new parking lot? Section 29-492 (4) of
the City Code requires that all open off-street parking and