HomeMy WebLinkAboutO'DEA ELEMENTARY SCHOOL - SITE PLAN ADVISORY REVIEW - 14-94 - REPORTS - RECOMMENDATION/REPORT W/ATTACHMENTSA.
A. WA.
V VT'il )S00 °.1. I I I
A...D_1 Q. V.
Z A.
PA
T. F �Ir A.
q /
A.
FiK"fiM. I L I A.
U f nl G E Tb n)
SCHEMATIC DESj*.N
OVEA ELEMENTARY
NOVEMRPR 22, 1993
A.
A. CLASSROOM
B. MEDIA CENTER.
C. TEACHERS WORK ROOM
D. STORAGE
E. RESOURCE
F. TOILET
G. JANITORIAL STORAGE
H. STAFF ROOM
1. KILN ROOM
J. MEDIA OFFICE/A.V.
K. CLINIC
L. PRINCIPAL
M. COUNSELOR
N. ART ROOM
0. MUSIC ROOM
P. CHAPTER ONE
0. KITCHEN
R. COMM/DATA
S. ITINERANT
T. P.E. OFFICE
U. ADMINISTRATION
V. MECHANICAL
W. FLEX ROOM
X. MULTI -PURPOSE
Y. MULTI -CATEGORICAL SERVICES
Z. COMPUTER
"
I" Sol
ROD swoft
A ���w,.
�v rOIA,
Ord Dead Pam MOB`
Odea upgrade in 1994
Construct an addition( s) to provide permanent space for the programs
ndicated. No architectural or site utilization studies have been done. It is
assumed that the 6.6 acre site will work.
Ar t 1 1300
I`lusic 1 1300
Chap.-1 1 450
Write/Read 1 450
Teachers Work 2 300
Itinerents 2 100
Custodial 1 100
Restrooms 2 150
Corridors 20 %
Total Square Footage
Cost Per 4quare Foot
New Construction Cost
Enclose Corridors
Remodeled Construction Cast (just a guess)
Architects fee 1259 �.
Miscellaneous fees, testing
Reserve and admin
School adm. furnishings 9z
TOTAL 1990 6%
Year Bid 1991
_ 1992
1993
' 1994
1995
-9-
1 ,300
1.300
450
450
600
200
100
300
940
5,640
$67
$377,880
$60,000
$50.00
$58,54
$10,000
$ 42,788
$34,009
$633 223
$671,,Z 16
$711,489
$ 754,178
$799,429
$847,395
$754,178
n
O
o \
0
i
w .: �`
�\
i
' ��tt Kilt IJtA
• `' it
.�p
Oi[I(T�MO 1 i 1 ;ort 111n., mm.
1 Aitoo 'L71utlr .p.u. rw tu.,e, arl, SpatLL.
* KAtrtion. Q.pt.[ Om. +M the .nl.[pr.n! e W iJl.
GWWJM
••.••rv'•. ti ,1 1�1 Jth, m1 hill v i' a
1 1 L ,y.vaa r r111 r umy.t.C.
4q L r [ mlldl7 W1t1.n m w .lt..
1 �/ 'rlu Wtl !1 lil"i n bN•rnrtm. m .ib q
�., ;`•/) 'Il�-�y . ut.um. �:cm .mom. <..!
Mt
1
ODEq
t .eel L to o•a. u awry taeo.l ut t. � w
ef.l w ..l.elnv satrapp .m ewe yltn ys
�tr.iy. w wW. o. ar yai�ln rt31 r qty Wrly '
1(/y[. P•Ql" l• plyrr tNn w u1.t1M .tIW [Lv[uT VSN
vul wt W E1pE wtt ar w pw . 4Kf n „
.mt+ rinTM. uar.a. xe. n1rtVw [Y.: b Jt' �tsy7�rlLw
trw. i.timl Yvw.ir J. J• .mw rw...e erm.. ..
(�r E rros ect A►ta
U c c
0
.- o � IDe
� i .�' °' J V1 0
IL
Parker St a ri a
SP! n err• '�
L AI p ert Avenl
CU
E L Stuart 3
Ind
ion
a: I Meadows
N L.one. ✓ � _-
Johnson -S nn r
Dr.
c
0
o
'-
3
W I
Dr
W
Cr
� t
Rutgers Av �
In
>
Q
o J
>
I
w
Yale
Q
Yale Wa
Q)
v
9
n
U
N
SITE
�I
r
�I
Prince
an Rd
cn
I
v%
N
ITI
II L
o
1F/'cker �r
a I`
W. Alpert ' v'
v C� E.
�o e'
Q] C�
zhe
N
- cIlne
m
Cheyenne
v ;
r.
o�
H v, t
cart �'- ��` Dartmouth
p o
DIhl T v Cir.
ye
o6l
�!
:3 v 0� L n .
_ d
U c
o
o
a Columbia
Y
d
Ur
3
t
av
a
N
Corn II Ave
C om brill
o
..-0
0 t c~n
Cir• ��
onderbift C
ore r w n A
�? \
=
Queens CI
—
Pr,nceton
v
8a for $t,
v `
w °'
O
0
0
c'o >
to V)
2
L
0
�a a ry rr•a - v
Dr. W. Dr. E. c ��en St.
> d
o 0-3
t c
= Mao
L � f
L
� Q
C Hcat her c
1c,-
r Strac an
ITEM: O'DEA ELEMENTARY lAr�
North
NUMBER: 14=94
O'Dea Elementary School - Site Plan Advisory Review, #14-94
April 25, 1994 P & Z Meeting
Page 3
5. Design
The addition will be between the two existing buildings and will
connect the main school building and the annex. The exterior
materials will match the existing building. The media center
addition will be approximately 3' higher than the existing adjacent
classroom spaces, which will put the high part of the new roof at
approximately 15' above finish grade. The existing gym is 21'
above finish grade.
The addition occurs on graveled areas. No changes to the existing
landscaping are planned. The addition will increase the hard
surface on site by approximately 4,800 square feet. A drainage
report will be reviewed by the City Stormwater Utility.
RECOMMENDATION:
In review of the request to add program space and enlarge the media
center, at O'Dea Elementary School, Staff finds the following facts
to be true:
1. Public Schools are a permitted use in the R-L Zone District.
2. The design of the addition is compatible with the existing
structure.
3. There is no significant impact on the surrounding
neighborhood.
4. The design, location, and character of the additions are
appropriate and meet City plans and policies.
Staff, therefore, recommends approval of O'Dea Elementary School,
Addition, Site Plan Advisory Review, #14-94.
O'Dea Elementary School - Site Plan Advisory Review, #14-94
April 25, 1994 P & Z Meeting
Page 2
COMMENTS:
1. Background
The surrounding zoning and land uses are as follows:
N: R-L; Single Family
S: R-L; Single Family
E: R-L; Single Family
W: R-L; Single Family
O'Dea Elementary School was built in the late 1964. It is located
on approximately 5.62 acres. It was constructed with 28,000 square
feet for grades K through 6. A 10,000 sf annex was constructed in
1986. With this new addition for programs and an enlarged media
center the total size will be 44,000 sf. The addition will not
change the status as a three track elementary school.
2. City's Right to Advisory Review
The City's right to conduct an advisory review of school facilities
is found in two sections of the Colorado Revised Statutes: Section
22-32-124, and Section 31-23-209. Under these sections, the
Planning and Zoning Board is authorized to make a finding as to the
location, character, and extent of the public buildings and
structures relative to the adopted Master Plan of the City.
3. Land Use
Public schools are a permitted use in the R-L, Low Density Zoning
District. The addition of program space for music, art, special
education, and flex -space; and the enlargement of the median center
are considered to be complementary and compatible with the purpose
and function of a public school.
4. Neighborhood Compatibility
The addition will be constructed between the two existing
buildings. The addition will fit comfortably within the school
grounds and not impose upon the adjacent residential areas. As the
school will remain a 3 track school, the impacts of traffic and
parking will be unchanged. The addition will have a negligible
impact on the surrounding area and is, therefore, found to be
compatible with the neighborhood.
ITEM NO. 11
MEETING DATE 4/25/94
STAFF Kirsten Whetstone
PLANNING AND ZONING BOARD
J
STAFF REPORT
PROJECT: O'Dea Elementary School Addition - Site Plan
Advisory Review, #14-94
APPLICANT: Poudre R-1 School District
c/o Robb, Brenner, and Brelig, Inc
125 South Howes, Suite 880
Fort Collins, CO 80521
OWNER: Poudre R-1 School District
2407 LaPorte Avenue
Fort Collins, CO 80521
PROJECT DESCRIPTION:
This is a request for a Site Plan Advisory Review to add 6,000
square feet of program space and to expand the media center of the
existing 3 track O'Dea Elementary School. The site is located at
312 Princeton Road, east of South College Avenue and north of Drake
Road. The site is zoned R-L, Low Density Residential.
RECOMMENDATION: Approval
EXECUTIVE SUMMARY:
The request for this 6,000 sf addition at O'Dea Elementary School
has been reviewed by the City in accordance with two state
statutes. Public Schools are permitted in the R-L, Low Density
Residential Zoning District. The addition is located between the
two existing buildings. The addition will increase the amount of
hard surface on site by about 4,800 sf. The addition occurs in
graveled areas and no changes to the existing landscaping are
proposed. There is no significant impact on the surrounding
neighborhood and the design is compatible with the existing
building. The location, character, and extent of the addition are
appropriate and meet City plans and policies.
COMMUNITY PLANNING AND ENVIRONMENTAL SERVICES 281 N. College Ave. P.O. Box 580 Fort Collins, CO 80522-0580 (303) 221-6750
PLANNING DEPARTMENT