HomeMy WebLinkAboutWESTBURY PUD, FIRST FILING - FINAL - 11-94A - SUBMITTAL DOCUMENTS - ROUND 1 - LDGS ACTIVITY FORMWestbury Final PUD
Activity A: ALL DEVELOPMENT CRITERIA
ALL CRITERIA
APPLICABLE CRITERIA ONLY
CRITERION
Is the criterion
appiical;10
M the ariteri
be satistledl
If no, please explain
r i
a �
Yes
No
Al. COMMUNITY -WIDE CRITERIA
1.1 Solar Orientation
I X
x
1.2 Comprehensive Plan
X
X
1.3 Wildlife Habitat
X
1.4 Mineral Deposit
X
1.5 Ecologically Sensitive Areas
reserved
reserved
1.6 Lands of Agricultural Importance
1.7 Enercv Conservation
x
X .
,
1.8 Air Qualitv
X
1.9 Water Quality
I X
x
1 10 SeINage and Wastes
I
X
X
A 2. NEIGHBORHOOD COMPATIBILITY CRITERIA
2.1 Vehicular. Pedestrian, Bike Transportation
x
X
2.2 Building Placement and Orientation
X
x
2.3 Natural Features
x
x
2.4 Vehicular Circulation and Parking
X
X
2.5 Emergency Access
X
X
2.6 Pedestrian Circulation
X
x
2.7 Architecture
X
X
2.8 Building Height and Views
X
2.9 Shading
X
X
2.10 Solar Access
X
X
2.11 Historic Resources
x
2.12 Setbacks
X
x
2.13 Landscape
x
X
2.14 Signs
X
2.15 Site Lighting
X
2.16 Noise and Vibration
X
2.17 Glare or Heat
X
2.18 Hazardous Materials
x
A 3. ENGINEERING CRITERIA
3.1 Utility Capacity
3.2 Design Standards
x
X
3.3 Water Hazards
X
x
3.4 Geologic Hazards
X
54