Loading...
HomeMy WebLinkAboutMOORE ELEMENTARY SCHOOL - SITE PLAN ADVISORY REVIEW - 15-94 - CORRESPONDENCE - RESPONSE TO STAFF REVIEW COMMENTSRobb, Brenner < relig, Inc. 125 South Howes • Suite 880 • P O. Box Fort Collins, CO 80522 • (303) 484-0117 Architecture Planning Interior Design RB B April 18, 1994 Ms. Kirsten Whetstone, AICP City Planner City of Fort Collins 281 N. College Avenue P.O. Box 580 Fort Collins, CO 80522-0580 RE: Additions to Bennett, Dear Ms. Whetstone, 1 C> -6N O'Dea and oore Elementary Schools Attached are the required 8 prints of each site plan, one PMT for each site plan, and a colored site plan of each site for the three referenced projects. In response to the comments in your letter to me dated March 30, 1994: 1. Cost to relocate gas meters and/or lines' will be paid for by the School District. 2/3. Any change in telephone service lines will be shown on the Contract Documents. The Electrical Contractor will install any conduit required under the Contract. The School District will handle installation of conductors and equipment under a seperate contract. Drainage Reports on the three schools, prepared by Lidstone and Anderson dated March 28, 1994 were submitted by the School District under seperate cover. Please call me if you have any questions: Si cer'e/l.(�y/I,en i O. Brenner Jr. AI Vice President WOB/lw Enclosure cc: Ron Daggett Mike Spearnak