HomeMy WebLinkAboutWOODLAND STATION PUD - PRELIMINARY - 18-94B (44-94) - SUBMITTAL DOCUMENTS - ROUND 1 - TRAFFIC STUDY1985 HCM: UNSIGNALIZED INTERSECTIONS Page-1
wxxxxxwxxxxxxxwxwxxxxwwxxxxx+rwwwxxxxxxxxxxxxxxxxxxxxxxxxxwxxxxxxxxxxx
IDENTIFYING INFORMATION
_____________________________________________________________________
AVERAGE RUNNING SPEED. MAJOR STREET.. 40
PEAK HOUR FACTOR ..................... 1
AREA POPULATION ...................... 100000
NAME OF THE EAST/WEST STREET......... Mt"W== 5 u(N
NAME OF THE NORTH/SOUTH STREET....... cr 9
NAME OF THE ANALYST .................. 2md
DATE OF THE ANALYSIS (mm/dd/vy)...... 6/22/94
TIME PERIOD ANALYZED ................. am CPD 2015
OTHER INFORMATION....
INTERSECTION TYPE AND CONTROL
------------------------------------------------------- ______________
INTERSECTION TYPE: T-INTERSECTION
MAJOR STREET DIRECTION: NORTH/SOUTH
CONTROL TYPE WESTBOUND: STOP SIGN
TRAFFIC VOLUMES
_____________________________________________________________________
EB WB NB SB
____ ____ ____ ----
LEFT -- 15 0 20
THP.0 -- 0 468 294
RIGHT -- 10 30 0
NUMBER OF LANES
_____________________________________________________________________
EB WB NB SE-
------- _______ _______ -------
LANES -- 1 2 2
i
CAPACITY AND LEVEL -OF -SERVICE Page-3
_____________________________________________________________________
POTEN- ACTUAL
FLOW- TIAL MOVEMENT SHARED RESERVE
RATE CAPACITY CAPACITY CAPACITY CAPACITY
MOVEMENT v(pcpn) c (pcph) c (pcph) c (pcph) c = c - v LOS
P M SH R SH
_______________ _________ ____________ ____________ ___
' MINOR STREET
i
WB LEFT 17 230 225 > 225 > 209 > C
314 > 287 >C
j RIGHT I1 771 771 > 771 > 760 > A
MAJOR STREET
SB LEFT 22 598 598 598 576 A
IDENTIFYING INFORMATION
_________________________________________________________
NAME OF THE EAST/WEST STREET...... 5�(i
NAME OF THE NORTH/SOUTH STREET.... cr 9 m,
DATE AND TIME OF THE ANALYSIS..... 6/22/94 q am �J 2015
/p
OTHER INFORMATION.... (P.
1965 HCM: UNSIGNALIZED INTERS--ECTIONS
Page-1
IDENTIFYING INFORMATION
---------------------------------------------------------------------
AVERAGE RUNNING SPEED. MAJOR STREET..
ari
PEAT. HOUR FACTOR .....................
1
AREA POPULATION ......................
100000
STREET.........
NAME OF THE EAST/WEST
NAME OF THE NORTH/SOUTH STREET.......
cr 9
NAME OF THE ANALYST ..................
jmd
DATE OF THE ANALYSIS (mm/dd/vy)_.....
6/22/94
TIME PERIOD ANALYZED .................
an- pm
2015
OTHER INFORMATION....
INTERSECTION TYPE AND CONTROL
--------------------------------------------------------------------_
INTERSECTION TYPE: T-INTERSECTION
MAJOR STREET DIRECTION: NORTH/SOUTH
CONTROL TYPE WESTBOUND: STOP SIGN
TRAFFIC VOLUMES
---------------------------------------------------------------------
EB WB NB SB
---- ---- ---- ----
LEFT -- 25 0 5
THRU -- 0 282 468
RIGHT -- 15 10 0
NUMBER OF LANES
---------------------------------------------------------------------
EB WB NB
-------
-------
SB
--------------
LANES -- 1 2
2
CAPACITY AND LEVEL -OF -SERVICE Page-3
---------------------------------------------------------------------
POTEN- ACTUAL
FLOW- TIAL MOVEMENT SHARED RESERVE
RATE CAPACITY CAPACITY CAPACITY CAPACITY
MOVEMENT v(pcph) c (pcph) c (pcph) c (pcph) c = c - v LOS
p M SH R SH
MINOR STREET
WB LEFT 28 248 247 > 247 > 219 C
> 337 > 293 >C
RIGHT 17 869 869 > 869 > 852 > A
MAJOR STREET
SB LEFT 6 766 766 766 76o A
IDENTIFYING INFORMATION
NAME OF THE EAST/WEST STREET...... So+,
NAME OF THE NORTH/SOUTH STREET.... cr 9
DATE AND TIME OF THE ANALYSIS..... 6/22/94 am pm 2015
OTHER INFORMATION....
1985 HCM: SIGNALIZED INTERSECTIONS
SUMMARY REPORT
INTERSECTION..corbett/shieldsicr 9
AREA TYPE..... OTHER
ANALYST ....... jmd
DATE.......... 6/22/94
TIME ......... <Z�� pm 2015
COMMENT.......
-----------------------------------------------------------------------
VOLUMES GEOMETRY
EB WB NB SB : EB WB NB SB
LT 75 25 270 10 : L 12. it L 12.0 L 12.0 L 12.0
TH 5 10 205 701-1 : TR 12.0 TR 12.0 T 12.0 T 12.0
RT 60 15 10 210 : 12.0 12.0 R 12.0 R. 12.0
RR O it 0 0 : 12.0 12.0 12.0 -12.0
12.0 12.0 12.0 12.0
12.0 12.0 12.0 12.0
--------------------------------------------------------------------------
ADJUSTMENT FACTORS
GRADE HV ADJ PKG BUSES PHF REDS PED. BUT. ARR. TYPE
(%) (%) Y/N Nm Nb Y/N min T
EB 0.00 1.00 N it 0 0.90 5 N 20.5 3
WB 0.00 1.00 N 0 0 0.90 5 N 20.5 3
NB 0.00 1.00 N O C, 0.90 5 N 14.5 3
SB 0.00 1.00 N 0 O 0.90 5 N 14.5
--------------------------------------------------------------------------
SIGNAL SETTINGS CYCLE LENGTH = 67.0
PH-1 P1H-2 PH-3 PH-4 PH-1 PH-2 PH PH-4
EB LT X NB LT X X
TH X TH X
RT % RT R
PD X PD X
WB LT X SB LT X X
TH X TH X
RT X RT %
PD X PD X
GREEN 15.0 0.0 0.0 0.0 GREEN 8.0 30.0 0.0 0.0
YELLOW 5.0 0.0 0.it 0.0 YELLOW 4.0 5.0 O.O O.0
--------------------------------------------------------------------------
LEVEL OF SERVICE
LANE GRP. V/C G/C DELAY LOS APP. DELAY APP. LOS
EB L 0. 191 0.254 14.9 B 13.9 B
TR 4.185 0. 254 12.7 B
WB L 0.069 0.254 14.4 E 13.3 B
TR 0. 067 0.254 12.7 B
NE L - 0. ir33 0.657 3.1 A 4.7 A
T 0..266 0.478 6.8 B
R 0.015 0. 478 5.9 B
SB L 0. 033 0. 657 7.1 A 15.9 C
T 6. 909 !i. 478 18.7 C
R 0. 322 ti. 478 7.1 B
--------------------------------------------------------------------------
INTERSECTION: Delay = 12.2 (sec/veh) V/C = 0.537 LOS = B
9
1985 Hr_M: SIGNALIZED INTERSECTIONS
SUMMARY REPORT
INTERSECTION..cor•bett/shields/cr 9
AREA TYFE..... OTHER
ANALYST....... jmd
DATE.......... 6/22/94
TIME.......... am tp�. 2015
COMMENT.......
--------------------------------------------------------------------------
VOLUMES GEOMETRY
EB WB NB SB : EB WB NB SS
LT 330 15 75 20 : L 12.0 L 12.0 L 12. ii L 12.0
TH 15 5 685 225 : TR 12.0 TR 12.0 T 12.0 T 12.0
RT 270 10 30 55 12.0 12.0 R 12.0 R 12.0
RR ii 0 0 O 12.0 12.0 12.0 12.0
12.v 12.0 12.0 12.ir
12.0 12.0 12.0 12.0
--------------------------------------------------------------------------
ADJUSTMENT FACTORS
GRADE HV ADJ PKG BUSES PHF PEDS PED. BUT. ARR. TYPE
(%) (%) Y/N Nm Nb Y/N min T
EB 0.00 1.00 N O 0 0.90 5 N 20.5
WB 0.00 1.00 N 0 0 0.90 5 N 20.5
NB 0.00 1.00 N 0 0 0.90 5 N 14.5
SB 0.00 1.00 N 0 0 0.90 5 N 14.5 3
--------------------------------------------------------------------------
SIGNAL SETTINGS CYCLE LENGTH = 67.0
PH-1 PH-2 PH-3 PH-4 PH-1 PH-2 PH-3 PH-4
EB LT % NB LT X X
TH X TH X
RT X RT X
PD X PD X
WB LT X SB LT X X
TH X TH X
RT X RT %
PD X PD X
GREEN 15.0 0.0 .0.0 0.0 GREEN 8.0 31:1.0 0.0 0.0
YELLOW 5.0 0.0 0.0 0.0 YELLOW 4.0 5.0 0.0 0.0
--------------------------------------------------------------------------
LEVEL OF SERVICE
LANE GRP. V/C G/C DELAY LOS APP. DELAY APP. LOS
EB L 0.821 0.254 26.0 D 24.4 C
TR 0.814 0.254 22.5 C
WB L 0.080 0.254 14.5 B 13.3 B
TR 0.041 0.254 12.2 B
NB L 0.033 0.657 3.1 A 15.4 C
T 0. 890 0. 478 17.2 C
R 0.046 0.478 6.0 B
SB L 0.033 0.657 3.1 A 6.5 B
T 0.292 0.478 6.9 B
R 0.064 0.478 6.2 B
--------------------------------------------------------------------------
INTERSECTION: Delay = 17.0 (sec/veh) V/C = 0.702 LOS = C
4�
N
]ALL
BM5 0
4 954
40RO
LUIU�
4939
1505
A
J!
H05P
17
f�f6
.
15
— L6_9�
F
it ill
ravel Pli -
...
00
Radio
Towfirs
Dr ve-i
it
Theat
�lljl1 J
9
%
\\ % 20 \4., L
% A
AT
21
Cem
L•
NN
BM48r
Ut-9
'I74
1486
880
_25;
j -67."
3
r
1128
27 2
—1101111 1
Gfave
HORSETO.QTH RD.
A
STRACHAN
& SHIELDS
PROPERTIES
36 499/
5� f
z
32
�-133 1
311 3
Timnat.
Harmony
0
0
'953063
HARMONY hl)
4867
If R 14
if
ii L
Cemr7j
4
)6
5
4
m
4 827
1471
4916
/498
12
7
9
11
N
j
4880
/so/
4923
1
' '065
d
[VII�'
16
NO.SCALE
SITE LOCATION Figure 1
I
1
1
1
1
i
1
1
1
1 APPENDIX A
i
1
7
1
1
1
1
1
1985 HCM: SICNALIZED INTERSECTIONS
SUMMARY REPORT
#YY#YXX%XYY#X#YYYXXYYYXXXXY YXY#XXYXYXXYXY##Y#X#YYXXXXX#Y##X Y:KX#YYYYXXXXXYY
INTERSECTION..harmony/cr9
AREA TYPE ..... OTHER
ANALYST....... mid
DATE ..........a °1
TIME......... am pm ex short 45
COMMENT....... 0 no corbet lonq 900
--------------------- ------ -------------------------------------
VOLUMES GEOMETRY
EB WB NB SB EB WB NB SB
LT 350 110 250 190 L 12.0 L 12.0 L 12.0 L 12.0
TH 1340 840 170 105 T 12.0 T 12.0 T 12.0 T 12.0
RT 140 210 140 135 T 12.0 T 12.0 R 12.0 R 12.0
RR 0 0 0 0 T 12.0 T 12.0 12.0 12.0
R 12.0 R 12.0 12.0 12.0
12.0 12.0 12.0 12.0
-----------------------------------------------------------------------
ADJUSTMENT FACTORS
GRADE HV ADJ PKG BUSES PHF PEDS PED. BUT. ARR. TYPE
(%) (%) YIN Nm Nb YIN min T
EB 0.00 2.00 N 0 0 0.95 5 N 20.5 4
WB 0.00 2.00 N 0 0 0.95 5 N 20.5 4
NB 0.00 1.00 N 0 0 0.95 5 N 32.5 3
SB 0.00 1.00 N 0 0 0.95 5 N 32.5 3
--------------------------------------------------------------------------
SIGNAL SETTINGS CYCLE LENGTH = 125.0
PH-1 PH-2 PH-3 PH-4 PH-1 PH-2 PH-3 PH-4
EB LT X X NB LT X X
TH X TH X
RT X RT X
PO X PO X
W8 LT X X SB LT X X
TH X TH X
RT X RT x
PD X PO X
GREEN 12.0 55.0 0.0 0.0 GREEN 10.0 30.0 0.0 0.0
YELLOW 4.0 5.0 0.0 0.0 YELLOW 4.0 5.0 0.0 0.0
--------------------- - --- --------------------------------- ------------
LEVEL OF SERVICE
LANE GRP. V/C G/C DELAY LOS APP. DELAY APP. LOS
EB L 0.615 0.584 16.4 C 14.2 B
T 0.536 0.456 14.3 B
R 0.179 0.544 6.3 a
WB L 0.269 0.564 9.9 B 10.0 8
T 0.399 0.456 10.7 8
R. 0.269 0.544 7.2 B
NS L 0.052 0.368 19.3 C 20.8 C
T 0.390 0.256 25.1 D
R 0.269 0.360 18.4 C
SB L 0.052 0.368 19.3 C 20.1 C
T 0.241 0.256 23.9 C
R 0.250 0.360 18.3 C
--------------------------------------------------------------------------
INTFRSECTION: Delay = 14.4 (sec/veh) V/C = 0.499 105 = 8
1985 HCM: SIGNALIZED INTERSECTIONS
SUMMARY REPORT
##XXY.Y XXKXXXY%YX%YX%%XXXXXX#YXXXYXX%Y%%%YX%X%YXXYY%%%XYXX%X%:K %'XX%Y%%XXY%X#
INTERSECTION..harmony/cr9
AREA TYPE ..... OTHER
ANALYST....... mid
DATE .......... 4/2
TIME.......... a pm ax short 4
COMMENT....... 651 n0 corbet 10n9 900
---------------------- ------ -----------------------------------
VOLUMES GEOMETRY
EB WB NB SB EB WB NB SB
LT 150 130 220 160 L 12.0 L 12.0 L 12.0 L 12.0
TH 1260 1780 155. 200 T 12.0 T 12.0 T 12.0 T 12.0
RT 155 250 160 290 T 12.0 T 12.0 R 12.0 R 12.0
RR 0 0 0 0 T 12.0 T 2.0 12.0 12.0
R 12.0 R 12_.0 12.0 12.0
12.0 12.0 12.0 12.0
-----------------------------------------------------------------
ADJUSTMENT FACTORS
GRADE HV ADJ PKG BUSES PHF PEDS PED. BUT. ARR. TYPE
(%) (%) YIN Nm Nb YIN min T
EB 0.00 2.00 N 0 0 0.95 5 N 20.5 4
w8 0.00 2.00 N 0 0 0.95 5 N 20.5 4
NB 0.00 1.00 N 0 0 0.95 5 N 32.5 3
SB 0.00 1.00 N 0 0 0.95 5 N .32.5 3
------------------------------------------------------------------------
SIGNAL SETTINGS CYCLE LENGTH = 125.0
PH-1 PH-2 PH-3 PH-4 PH-1 PH-2 PH-3 PH-4
EB LT X X NB LT X X
TH X TH X
RT X RT X
PD X PO X
WB LT X X SB LT X X
TH X TH X
RT X RT X
PO X PO X
GREEN 12.0 55.0 0.0 0.0 GREEN 10.0 30.0 0.0 0.0
YELLOW 4.0 5.0 0.0 0.0 YELLOW 4.0 5.0 0.0 0.0
----------------------------------------------------------------------
LEVEL OF SERVICE
LANE GRP. V/C G/C DELAY LOS APR. DELAY APP. LOS
E8 L 0.453 0.584 12.4 6 11.1 B
T 0.598 0.456 12.2 6
R 0.198 0.544 6.9 B
W8 L 0.366 0.584 10.9 B 17.7 C
T 0.845 0.456 19.5 C
R 0.320 0.544 7.5 B
NB L 0.052 0.368 19.3 C 20.7. C
T 0.356 0.256 24.8 C
R 0.308 0.360 13.7 C
SB L 0.052 0.368 19.3 C 22.3 C
T 0.459 0.256 25.8 0
R 0.558 0.360 21.5 C
--------------------------------------------------------------------------
INTERSECTION: Delay = 16.7 (sec/veh) VIC = 0.634 10S = C
I
F
1
11
1
1
1
i
APPENDIX G
1
i
1
i
1
1
1
1
1985 HCM: UNSIGNALIZED INTERSECTIONS Page-1
IDENTIFYING INFORMATION
_____________________________________________________________________
AVERAGE RUNNING SPEED. MAJOR STREET.. 40
PEAK HOUR FACTOR ..................... 1
AREA POPULATION ...................... IOOOUO f�
NAME OF THE EAST/WEST STREET......... lg�ng°""^
NAME OF THE NORTH/SOUTH STREET....... cr 9
NAME OF THE ANALYST .................. jmd
DATE OF THE ANALYSIS (mm/dd/yy)...... 6/22/94
TIME PERIOD ANALYZED ................. am (pm 96
OTHER INFORMATION....
INTERSECTION TYPE AND CONTROL
_____________________________________________________________________
INTERSECTION TYPE: T-INTERSECTION
MAJOR STREET DIRECTION: NORTH/SOUTH
CONTROL TYPE WESTBOUND: STOP SIGN
TRAFFIC VOLUMES
_____________________________________________________________________
EB WB NB SB
____ ____ ____ ----
LEFT -- 10 0 15
THRU -- 0 500 210
RIGHT -- 10 20 O
NUMBER OF LANES
_____________________________________________________________________
EB WB NS SB
______________ _______ -------
LANES -- 1 1 1
CAPACITY AND LEVEL -OF -SERVICE Page-3
_____________________________________________________________________
POTEN- ACTUAL
FLOW- TIAL MOVEMENT SHARED RESERVE
RATE CAPACITY CAPACITY CAPACITY CAPACITY
MOVEMENT v(pcph) c (pcph) c (pcph) c (pcph) c = c - v LOS
p M SH R SH
MINOR STREET
WS LEFT 11 292 288 > 268 > 277 > C
> 380 > 358 >B
RIGHT 11 558 558 > 558 > 547 > A
MAJOR STREET
SB LEFT 17 663 667 663 646 A
IDENTIFYING INFORMATION -
---- ____--- _--------- _------------ _--------
_____
NAME OF THE EAST/WEST STREET...... S==,=,asw ,
NAME OF THE NORTH/SOUTH STREET.... cr 9
DATE AND TIME OF THE ANALYSIS..... 6/22/94 ; am pm 98
OTHER INFORMATION....
1965 HCM: UNSIGNALIZED INTERSECTIONS Paqe-1
+xx+x++xxxxx�++xxxx++++xxxx+++x+x+xxxx+xx+xxxxx+++xx+xx+++xxxx+xx+x++
IDENTIFYING INFORMATION
_____________________________________________________________________
AVERAGE RUNNING SPEED. MAJOR STREET.. 41-1
PEAK HOUR FACTOR ..................... 1
AREA POPULATION ...................... IOO�iUO
NAME OF THE EAST/WEST STREET......... -�--�- 4
NAME OF THE NORTH/SOUTH STREET....... cr 9
NAME OF THE ANALYST .................. jmd
DATE OF THE ANALYSIS (mm/dd/yy)...... 6/22/94
TIME PERIOD ANALYZED.................pm 98
OTHER INFORMATION....
INTERSECTION TYPE AND CONTROL
_____________________________________________________________________
INTERSECTION TYPE: T-INTERSECTION
MAJOR STREET DIRECTION: NORTH/SOUTH
CONTROL TYPE WESTBOUND: STOP SIGN
TRAFFIC VOLUMES
_____________________________________________________________________
EB WB NB SB
____ ____ ____ ----
LEFT -- 15 0 5
THRU -- ii 195 610
RIGHT -- 10 5
NUMBER OF LANES
_____________________________________________________________________
EB WB NB SB
_______ _______ _______ -------
LANES -- 1 1 1
CAPACITY AND LEVEL -OF -SERVICE Paqe-3
_____________________________________________________________________
POTEN- ACTUAL
FLOW- TIAL MOVEMENT SHARED RESERVE
RATE CAPACITY CAPACITY CAPACITY CAPACITY
MOVEMENT v(pcph) c (pcph) c (pcph) c (pcph) c = c - v LOS
p M SH R SH
____________________________________ ____________ ---
MINOR STREET
WB LEFT 17 254 253> 253 > 237 > C
> 350 > S22 :�B
RIGHT 11 817 817 > 817 > 806 > A
MAJOR STREET
SB LEFT 6 947 947 947 942 A
IDENTIFYING INFORMATION
---- ____--- _--------- _--------
___________________
NAME OF THE EAST/WEST STREET...... aiwet[RTen fie+
NAME OF THE NORTH/SOUTH STREET.... cr 9
DATE AND TIME OF THE ANALYSIS..... 6/22/94 ; a m/ pm 98
OTHER INFORMATION.... ./
1985 HCM: UNSIGNALIZED INTERSECTIONS Page-1
ww+w+wwwwwwww+wwwwwwwwwwwwwwwwwwwwww+w++wwww+++wwwwww+w++wwwwww+++www
IDENTIFYING INFORMATION
_____________________________________________________________________
AVERAGE RUNNING SPEED, MAJOR STREET.. 40
PEAK: HOUR FACTOR ..................... 1
AREA POPULATION ...................... 100000
NAME OF THE EAST/WEST STREET......... e RJllt(
NAME OF THE NORTH/SOUTH STREET....... cr 9
NAME OF THE ANALYST .................. jmd
DATE OF THE ANALYSIS (mm/dd/yy)...... 6/21/94
TIME PERIOD ANALYZED ................. am (pm1 1998
OTHER INFORMATION....
INTERSECTION TYPE AND CONTROL
_____________________________________________________________________
INTERSECTION TYPE: T-INTERSECTION
MAJOR STREET DIRECTION: NORTH/SOUTH
CONTROL TYPE WESTBOUND: STOP SIGN
TRAFFIC VOLUMES
_____________________________________________________________________
EB WE, NB SB
____ ____ ____ ----
LEFT -- 10 0 15
THRU -- Q 490 215
RIGHT -- 10 20 O
NUMBER OF LANES
_____________________________________________________________________
EB WB NB SB
_______ _______ _______ -------
LANES -- 1 1 1
CAPACITY AND LEVEL -OF -SERVICE Page-7
_____________________________________________________________________
POTEN- ACTUAL
FLOW- TIAL MOVEMENT SHARED -RESERVE
RATE CAPACITY CAPACITY CAPACITY CAPACITY
MOVEMENT v(pcph) c (pcph) c (pcph) c (pcph) c = c - v LOS
p M SH R SH
MINOR STREET
WB LEFT 11 295 291 >- 291 > 280 > C
> 84 > _362 >B
RIGHT 11 566 566 566 :> 555 > A
MAJOR STREET
SB LEFT 17 671 671 671 654 A
IDENTIFYING INFORMATION
---- ____--- _--------- _-------- ______
NAME OF THE EAST/WEST STREET...... s
NAME OF THE NORTH/SOUTH STREET.... cr 9
DATE AND TIME OF THE ANALYSIS..... 6/21/94 ; am LPG 1998
OTHER INFORMATION....
1985 HCM: UNSIGNALIZED INTERSECTIONS Page -I
wwwwww+wwwwwwwww:wwwwwwwwwwwwwwwwwwwwwr+t+rrtarr+rw+a+t+rrr+airitwwwrwatrr+•
IDENTIFYING INFORMATION
------ _______________________________________________________________
AVERAGE RUNNING SPEED. MAJOR STREET.. 40
PEAK HOUR FACTOR ..................... 1
AREA POP'ULATION...................... 100000
NAME OF THE EAST/WEST STRREET......... SMtltdS)J zf�
NAME OF THE NORTH/SOUTH STREET....... cr 9
NAME OF THE ANALYST .................. jmd
DATE OF THE ANALYSIS (mm/dd/yy)....._ 6/21/94
TIME PERIOD ANALYZED ................. (am) pm 1998
OTHER INFORMATION....
INTERSECTION TYPE AND CONTROL
_____________________________________________________________________
INTERSECTION TYPE: T-INTERSECTION
MAJOR STREET DIRECTION: NORTH/SOUTH
CONTROL TYPE WESTBOUND: STOP SIGN
TRAFFIC VOLUMES
_____________________________________________________________________
EB WB NB SB
____ ____ ____ ----
LEFT -- 15 0 5
THRU -- 0 200 600
RIGHT -- 10 5 0
NUMBER OF LANES
_____________________________________________________________________
EB WB NB SB
_______ _______ _______ -------
LANES -- I 1 I
CAPACITY AND LEVEL -OF -SERVICE Paqe-3
_____________________________________________________________________
POTEN- ACTUAL
FLOW- TIAL MOVEMENT SHARED RESERVE
RATE CAPACITY CAPACITY CAPACITY CAPACITY
MOVEMENT v(pcph) c (pcph) c (pcph) c (ocph) c = c - v LOS
p M SH R SH
MINOR STREET
WB LEFT 17 256 255 :> 255 :> 239 ; C
> 352 > 724 >B
RIGHT 11 812 912 > 812 > 801 > A
MAJOR STREET
SB LEFT 6 942 942 942 937 A
IDENTIFYING INFORMATION
________________________________________________ --------
NAME OF THE EAST/WEST STREET...... -- P,+
NAME OF THE NORTH/SOUTH STREET.... cr 9
DATE AND TIME OF THE ANALYSIS..... 6/1-1/94 pm 1998
OTHER INFORMATION....
1985 Hr_M: SIGNALIZED
INTERSECTIONS
SUMMARY REPORT
INTERSECTION..harmony/cr
9
AREA TYPE..... OTHER
ANALYST....... amd
DATE.......... 6/22/94
TIME .......... Pm
98
,.2m7
COMMENT.......
--------------------------------------------------------------------------
VOLUMES
GEOMETRY
EB WB NO
SB
EB
WB
NO
SB
LT 255 45 90
140
L 12.0 L
12.0
L
12.0
L 12.0
TH 1180 700 25
15
T 12.0 T
12.0
TR
12.0
TR 12.0
RT 40 100 20
8O
T 12_0 T
12.0
12.0
12.0
RR ii 0 t)
O
R 12.0 R
12.0
12.0
12.0
12.0
12.0
12.0
12.0
12.0
12.0
12.0
12.0
--------------------------------------------------------------------------
ADJUSTMENT FACTORS
GRADE HV
ADJ PY.G
BUSES PHF
REDS
FED.
BUT.
ARR. TYPE
(%) (%)
Y/N Nm
Nb
YIN
min T
EB 0.00 2.00
N 0
0 0.90
5
N
19.8
4
WB O.00 2.00
N 0
0 0.90
5
N
19.8
4
NB 0.00 1.00
N 0
0 0.90
5
N
31.8
3
SB 0.00 I.00
N O
0 0. 9ii
5
N
-1.8
3
PH-1
EB LT x
TH
RT
PD
WB LT x
TH
RT
PD
GREEN 8.0
YELLOW 4.0
LANE GRP
EB L
T
R
WB L
T
P
NO L
TR
SB L
TR
-------------
INTERSECTION:
----------------------------------------------------------
SIGNAL SETTINGS CYCLE LENGTH = 100.0
PH-2 PH-3 PH-4 PH-1 PH-2'' PH-3 PH-4
X NB LT X
x TH x
x RT x
x PD x
x SB LT x
x TH x
x RT x
x PD x
53.0 O.0 0.0 GREEN 25.0 0.0 0.0 0.0
5.0 0.0 0.0 YELLOW 5.0 0.0 0.0 0.0
----------------------------------------------------------
LEVEL OF SERVICE
V/C G/C DELAY LOS APR. DELAY APR. LOS
O.049 O. 670 4.3 A 8.5 B
6. 7ij2 0.550 9.5 B
0.053 0.550 4.9 A
0.049 0.670 4,3 A 6.0 B
0.417 0.550 6.2 B
0.17.4 0.550 5.2 B
0. 277 0.270 22.0 C 20.6 C
0. 111 0.270 17.7 C
0.383 0. 2711 -2.9 C 21.1 L
0.250 0. 271i 18.5 C
Delav = 9.4 (sec/veh) V/C = 0.527 LOS = B
1985 HCM: SIGNALIZE➢ INTERSECTIONS
SUMMARY REPORT
+++ltfi#f txxfi}+txxxixtAxxx%}ifi%i%+%%+a#%#R#%t++xi%xta+++x++++axxx++#xxxx}#f
INTERSECTION..harmony/cr 9
AREA TYPE..... OTHER
ANALYST....... dmd
DATE.......... 6/22/94
TIME.......... am `m� 9B
COMMENT.......
--------------------------------------------------------------------------
VOLUMES
GEOMETRY
EB WB NB SB :
EB
WB
NB
SB
LT 70 60 30 120 : L
12.0
L
12.0 L
12.0
L 12.0
TH 1005 1610 25 30 : T
12.0
T
12.0 TR
12.0
TR 12.0
RT b5 ISO 10 160 : T
12.0
T
12.0
12.0
12.0
RR 0 0 O O: R
12.0
R
12.0
12.0
12.0
GRADE
EB 0.00
WB o.00
NB O.00
SB 0.00
12.0
12.0
12.0
12.0
12.0
12.0
12.O
12.0
------------------------------------------------------------
ADJUSTMENT FACTORS
HV
ADS
PKG
BUSES PHF
PEDS
RED.
BUT.
ARR. TYPE
(%)
Y/N
Nm
Nb
Y/N
min T
2.00
N
it
O 0.90
5
N
19.8
4
2.00
N
0
0 0.90
5
N
19.8
4
1.00
N
0
0 0.90
5
N
31.8
�•
1.00
N
0
0 0.90
5
N
31.8
3
PH-1
EB LT X
TH
RT
PD
WE, LT x
TH
RT
PD
GREEN S.0
YELLOW 4.0
LANE GRP
EB L
T
R
WB L
T
R
NB L
TR
SB L
TR
-------------
INTERSECTION:
----------------------------------------------------------
SIGNAL SETTINGS CYCLE LENGTH = 100.0
PH-2 PH-3 PH-4 PH-1 PH-2 PH-3 PH-4
x NO LT x
x TH X
x RT x
x PD x
x SB LT x
x TH x
x RT x
x PD x
53.0 4).1) 0.0 GREEN 25.0 0.0 0.0 O.O
S.0 0.0 0.0 YELLOW 5.0 0.0 0.0 0.0
----------------------------------------------------------
LEVEL OF SERVICE
V/C G/C DELAY LOS APR. DELAY APR. LOS
1).049 0.676 4.3 A 7.0 B
0.598 0.550 7.3 B
0. 0137 0.550 5.0 B
0.049 0.670 4.3 A 16.0 C
0.958 0. 550 19.6 C
0.201 0.550 5.4 B
0.121 0.270 20.9 C 19.2 C
0.084 0.270 17.6 C
0.-21 0.270 22.3 C _1.7 C
0.501 0.270 20.6 C
Deiav = 14.6 (sec/veh) V/C = 0.711 LOS = B
APPENDIX F
1965 HCM: UNSIGNALIZED INTERSECTIONS Page-1
IDENTIFYING INFORMATION
_____________________________________________________________________
AVERAGE RUNNING SPEED. MAJOR STREET.. 40
PEAKHOUR FACTOR ..................... 1
AREA POPULATION ...................... 104JOIX)
NAME OF THE EAST/WEST STREET......... 3rrd
NAME OF THE NORTH/SOUTH STREET....... cr 9
NAME OF THE ANALYST .................. jmd
DATE OF THE ANALYSIS (mm/dd/yy)...... 6/22/94
TIME PERIOD ANALYZED ................. am ,pm 97
OTHER INFORMATION....
INTERSECTION TYPE AND CONTROL
_____________________________________________________________________
INTERSECTION TYPE: T-INTERSECTION
MAJOR STREET DIRECTION: NORTH/SOUTH
CONTROL TYPE WESTBOUND: STOP SIGN
TRAFFIC VOLUMES
_____________________________________________________________________
EB WB NB SB
____ ____ ____ ----
LEFT -- 10 0 10
THRU -- O 440 1GO
RIGHT -- 5 15 0
NUMBER OF LANES
_____________________________________________________________________
EB WB NB SB
______________ _______ -------
LANES -- 1 1 1
CAPACITY AND LEVEL-OF-SEF.VICE Page-3
------------------ ___________________________________________________
POTEN- ACTUAL
FLOW- TIAL MOVEMENT SHARED RESERVE
RATE CAPACITY CAPACITY CAPACITY CAPACITY
MOVEMENT v(pcph) c (pcph) c (pcph) c (pcph) c = c - v LOS
p M SH R SH
_______________ _________ ____________ ____________ ---
MINOR STREET
WB LEFT it 343 340 > 340 329 > B
> 397 > 381 >B
RIGHT 6 603 603 > 603 597 :> A
MAJOR STREET
SB LEFT 11 714 714 714 703 A
IDENTIFYING INFORMATION
---- ____--- _--------- __________________________
NAME OF THE EAST/WEST STREET......
NAME OF THE NORTH/SOUTH STREET.... cr 9
DATE AND TIME OF THE ANALYSIS..... 6/22/94 : am pm 97
OTHER INFORMATION....
r.
1985 HCM: UNSIGNALIZED INTERSECTIONS Paqe-1
IDENTIFYING INFORMATION
_____________________________________________________________________
AVERAGE RUNNING SPEED, MAJOR STREET.. 40
PEAK HOUR FACTOR ..................... 1
AREA F'OPULATION...................... 100000
NAME OF THE EAST/WEST STREET......... Sew'^
NAME OF THE NORTH/SOUTH STREET....... cr 9
NAME OF THE ANALYST .................. .jmd
DATE OF THE ANALYSIS (mm/dd/yy)...... 6/22/94
TIME PERIOD ANALYZED ................. (cm) pm 97
OTHER INFORMATION....
INTERSECTION TYPE AND CONTROL
_____________________________________________________________________
INTERSECTION TYPE: T-INTERSECTION
MAJOR STREET DIRECTION: NORTH/SOUTH
CONTROL TYPE WESTBOUND: STOP SIGN
TRAFFIC VOLUMES
_____________________________________________________________________
EB WB NB SB
____ ____ ____ ----
LEFT -- 15 0 5
THRU -- 4 170 545
RIGHT -- 10 5 O
NUMBER OF LANES
_____________________________________________________________________
EB WB NB SB
_______ _______ _______ -------
LANES -- 1 1 1
CAPACITY AND LEVEL -OF -SERVICE Page-3
_____________________________________________________________________
POTEN- ACTUAL
FLOW- TIAL MOVEMENT SHARED RESERVE
RATE CAPACITY CAPACITY CAPACITY CAPACITY
MOVEMENT v(pcph) c (pcph) c (pcph) c (pcph) c = c - v LOS
p M SH R SH
_______ _____________________________ ____________ ---
MINOR STREET
WB LEFT 17 299 298 > 298 > 281 > C
> 402 11 374 >B
RIGHT 11 842 642 > 842 > 831 > A
MAJOR STREET
SB LEFT 6 960 960 960 954 A
IDENTIFYING INFORMATION
___________________________________________________
NAME OF THE EAST/WEST STREET......
NAME OF THE NORTH/SOUTH STREET.... cr 9
DATE AND TIME OF THE ANALYSIS..... 6/22/94 ; pm 97
OTHER INFORMATION....
1985 HCM: UNSIGNALIZED INTERSECTIONS page-1
IDENTIFYING INFORMATION
---------------------------------------------------------------------
AVERAGE RUNNING SPEED. MAJOR STREET.. 40
PEAK. HOUR FACTOR ..................... 1
AREA POPULATION ...................... 100000 //11
NAME OF THE EAST/WEST STREET......... .h',jd- Np4V1
NAME OF THE NORTH/SOUTH STREET....... cr 9
NAME OF THE ANALYST .................. jmd
DATE OF THE ANALYSIS (mm/dd/vy)...... 6/21/94
TIME PERIOD ANALYZED ................. am -�p mf 97
OTHER INFORMATION....
INTERSECTION TYPE AND CONTROL
---------------------------------------------------------------------
INTERSECTION TYPE: T-INTERSECTION
MAJOR STREET DIRECTION: NORTH/SOUTH
CONTROL TYPE WESTBOUND: STOP SIGN
TRAFFIC VOLUMES
---------------------------------------------------------------------
EP WB NE SB
---- ---- ---- ----
LEFT -- 10 0 30
THRU -- 0 470 ISO
RIGHT -- ., 15 O
NUMBER OF LANES
---------------------------------------------------------------------
EB WB N8 SB
--------------------- -------
LANES -- 1 1 1
CAPACITY AND LEVEL -OF -SERVICE Paae-3
---------------------------------------------------------------------
POTEN- ACTUAL
FLOW- TIAL MOVEMENT SHARED RESERVE
RATE CAPACITY CAPACITY CAPACITY CAPACITY
MOVEMENT v(pcph) c (pcph) c (pcph) c (pcph) c = c - v LOS
p M SH R SH
------- ----------------- ------------------------ ---
MINOR STREET
WS LEFT 11 348 =45 > 345 > 334 > B
> 403 > Z87 >B
RIGHT 6 610 610 610 > 604 > A
MAJOR STREET
SB LEFT 11 722 722 722 711 A
IDENTIFYING INFORMATION
---------------------------------------------_ -----
NAME OF THE EAST/WEST STREET.......kwvA
NAME OF THE NORTH/SOUTH STREET.... cr 9
DATE AND TIME OF THE ANALYSIS..... 6/21/94 p am ieJm 97
OTHER INFORMATION....
1985 HCM: UNSIGNALIZED INTERSECTIONS Fape-1
tx+#++#i++x**rtfix++fi+4ixxffx+fi#fi*++fi txxx#4fitxxx###x#+###+s#*+*rt+tx***#
IDENTIFYING INFORMATION
_____________________________________________________________________
AVERAGE RUNNING SPEED. MAJOR STREET.. 40
PEAK HOUR FACTOR ..................... 1
AREA F'OPULATION...................... 100000
NAME OF THE EAST/WEST STREET......... 'sMLTtt1's N),t ry
NAME OF THE NORTH/SOUTH STREET....... cr 9
NAME OF THE ANALYST .................. .imd
DATE OF THE ANALYSIS (mm/dd/vv)...... 6/21/94
TIME PERIOD ANALYZED ................. w pm 97
OTHER INFORMATION....
INTERSECTION TYPE AND CONTROL
------ _______________________________________________________________
INTERSECTION TYPE: T-INTERSECTION
MAJOR STREET DIRECTION: NORTH/SOUTH
CONTROL TYPE WESTBOUND: STOP SIGN
TRAFFIC VOLUMES
------------------------------------------------------------ _________
EB WB NB SB
____ ____ ____ ----
LEFT -- 15 0 5
THRU -- O 175 535
RIGHT -- 10 5 0
NUMBER OF LANES
_____________________________________________________________________
EB WB NB SB
______________ _______ -------
LANES -- 1 1 1
CAPACITY AND LEVEL -OF -SERVICE Paae-3
------------------------------------------------------------------
POTEN- ACTUAL
FLOW- TIAL MOVEMENT SHARED RESERVE
RATE CAPACITY CAPACITY CAPACITY CAPACITY
MOVEMENT v(pcph) c (pcph) c (pcph) c (pcah) c = c - v LOS
p M SH R SH
_______ ________ _________ ________________________ ---
MINOR STREET
WB LEFT 17 301 TOO > 300 > 294 ? C
a04 377 iB
RIGHT 11 837 81-7 837 326 ;= A
MAJOR STREET
SB LEFT 6 957 957 957 952 A
IDENTIFYING INFORMATION
---- ____--- _--------- _--------
__________�T
NAME OF THE EAST/WEST STREET ............
_.._____ Nwa"
NAME OF THE NORTH/SOUTH STREET.... cr 9
DATE AND TIME OF THE ANALYSIS..... 6/21/94 q pm 97
OTHER INFORMATION....
1985 HCM: SIGNALIZED
INTERSECTIONS
i9G5 HCM: SIGNALIZED INTERSECTIONS
SUMMARY REPORT
SUMMARY REPORT
'',
♦+at+++++++++++r++++++++r+t+w++r+w+w+++r+t++*+++++wrs+++rt+r+++++rwr++++++++r++
:F+.rw+wr+.+wwwsw++++++++ww�++++++++w+++++++++++ww+w++:++++e++++,r++++w++R++w
INTERSECTION..harmonv_icr
9
INTERSECTION..harmonyicr
9
AREA TYPE..... OTHER
AREA TYPE..... OTHER
ANALYST....... jmd
ANALYST....... Jmd
DATE.......... 6i22/94
DATE.......... 6/22/94
TIME......... Gail Pm
97
TIME.......... am ,p-n
`.=ll
97
COMMENT.......
COMMENT.......
-
__________________________________________________________________________
VOLUMES
GEOMETRY
_______-____________---________-__--__________---____________--_________-_
VOLUMES
GEOMETRY
EB WB NB
SB : EB WB
NB
SB
EB WB NB
SB :
EB WB
NB
SB
LT 255 35 80
135 : L 12.0 L 12.0
L 12.0 L
12.0
LT 65 50 25
115 : L
12.0 L 12.0
L 12.0 L
12.0
TH 1035 650 25
15 : T 12.0 T 12.0
TR 12.0 TR
12.0
TH 920 1500 20
30 : T
12.0 T 12.0
TR 12.0 TR
I^.0
RT 35 115 10
75 T 12.0 T 12.0
1.2.0
12.0
RT 55 135 5
170 : T
12.0 T 12.0
12.0
12.0
RR O O 0
O R 12.0 R 12.0
12.0
12.0
RR 0 O O
O R
1"%.!i R 12.0
12_0
12.0
12.0 12.0
12. 1)
12.11
12.11 12.11
12.11
12.11
12.0 12.0
12.0
12.0
12.0 12.0
12.0
12. U'
__________________________________________________________________________
ADJUSTMENT FACTORS
-__-_______________-_________--_-_______---_________--__________-_________
ADJUSTMENT FACTORS
GRADE HV
ADJ PKG BUSES PHF PEDS
FED. BUT. ARR.
TYPE
GRADE HV ADJ PK:G
BUSES PHF PEDS
FED. BUT. ARR.
TYPE
(%) (7.)
Y/N Nm Nb
Y/N min T
(%) (%) Y/N Nm
Nb
Y/N min T
EB 0. 00 2.00
N 0 0 0.90 5
N 19.8
4
EB O. CIO 2.00
N 0
0 0.90 5
N 14.5
4
WB 0.00 2.00
N O 0 0.90 5
N 19.8
4
WE 0.00 2.00
N 0
O 0.90 S
N 14.5
4
NB 0.00 1.00
N 0 0 0.90 5
N 31.8
_
NB 0.00 1.00
N 0
0 i). 90 5
N 26.5
3
SB 0.00. 1.00
N O 0 0.90 5
N 31.B
3
SB 0.00 1.00
N 0
0 0.90 5
N 26.5
__________________________________________________________________________
SIGNAL SETTINGS
CYCLE LENGTH =
160.0
-------------- -_____________-_--_____________---__________-___-________-_
SIGNAL SETTINGS
CYCLE LENGTH =
100.0
PH-I PH-2
PH-3 PH-4 PH-1
F'H-2 PH-3
PH-4
PH-1 PH-2
PH-3
PH-4 PH-1 PH-2 PH-3
PH-4
EB LT .X X
NS LT
X
EB LT X ti
NS LT
X
TH X
TH
X
TH X
TH
X
RT X
RT
X -
RT X
RT
X
PD X
PD
X
PD X
PD
X
WB LT X X
SB LT
X
WB LT X X
SB LT
X
TH X
TH
X
TH X
TH
X
RT :X
RT
X
RT X
RT
X
PD X
PD
X
PD X
PD
X
GREEN 9.0 53.0
0.0 0.0 GREEN 25.0
0.0 O,CI
0.0
GREEN 8.0 53.0
6.6
0.0 GREEN 25.0
0.0 0.0
0.0
YELLOW 4.0 5.0
__________________________________________________________________________
0.0 0.0 YELLOW
5.0 0.0 0.0
C1.0
YELLOW 4.0 5.0
0.0
C.. C, YELLOW
5.0 0.0 0.0
0.0
LEVEL OF SERVICE
-____________________-__-__-_-__--________________---___-________-__--____
LEVEL OF SERVICE
LANE GRP. V/C
G/C DELAY LOS
APP. DELAY APP.
LOS
LANE GRP. V/C
G/C
DELAY LOS
APP. DELAY APP.
LOS
EB L 0.049
0.670 4.3 A
7.7
B
EB L 0.049
0.670
4.3 A
6.7
B
T 0.616
u.550 8.6 B
T Co. 548
). 556
7.V B
R O. 047
0. 550 4.9 A
R C . 074
i i. 550
5.0 A
WB L 0,iJ49
0.670 4.3. A
5.9
B
WB L 6.049
0.67,0
4.3 A
'14.O
B
T 6. 375
0. 550 6.0 B
T 0.G93
0.55(J
15.0 C
R 0.154
v. 550 5.2 B
R 0.191
0.550
5.3 5
NB L v. 245
0.270 21.7 C
20.5
C
NB L C). IV4
iJ. 270
20.8 C
19.2
C
TR !.o84
0.270 17.6 C
TR O,i159
0.-'70
17.5
SB L u.361
0.270 22.7 C
21.0
C
SB L 0. 301
iI. 270
22.2 C
21.4
C
TR 0.237
__________________________________________________________________________
0.276 13.4 C
TR 0.52E
0.270
20.9 .0
INTERSECTION: Delav
= 6.9 (sec/veh) VIC =
o.470 LOS = B
-__-_____-____-____-_____---------________-----________________---__--____
INTERSECTION: Delav = !2.-1
(sec/veh) V/C =
0.680 LOS = B
i
1
1
i
1
1
1 APPENDIX E
1
1
L
i
i
i
1
1
1
MATTHEW J DELICH
ARTERIAL PROGRESSION DEGIGN
RUN9
ROUTE: CR9
INTERSECTIONS: 6 CYCLE LENGTH: 70 SYSTEM OFFSET: 0
BANDWIDTH LEFT: 19 RIGHT: 19 PERFORMANCE INDEX: 32
EFFICIENCY: 27 ATTAINABILITY: 46 INTERFERENCE: 29
---------------------------------------------------------------------------
NO. .........TIME -LOCATION DIAGRAM.......... DISTANCE SPEED
RIGHTBOUND ... READ DOWN LEFT RIGHT LEFT RIGHT
1 XXXXXXXXXXXXXXX X 1320 0 45 45
2 XXXXXXXXXXXXXXXX 1320 1320 45 45
3 XXXXXXXXXXXXX XXX 1320 1320 45 45
4 XXXXXXXXXXXXXXXX 1320 I320 45 45
5 XXXXXXXXXXX XXXXX 1320 1320 45 45
6 XXXXXXXXXXXXXXXX 0 I320 45 45
NO. OFFSET ......... TIME -LOCATION DIAGRAM.......... PHASE LENGTHS
LEFTBOUND ... READ UP 1 2 3 4 5 6 7 8
1 37 X XXXXXXXXXXXXXXX 60 40
2 87 XXXXXXXXXXXXXXXX 60 40
3 87 XX XXXXXXXXXXXXXX 60 40
4 37 XXXXXXXXXXXXXXXX 60 40
5 37 XXXX XXXXXXXXXXXX 60 40
6 87 XXXXXXXXXXXXXXXX 60 40
---------------------------------------------------------------------------
TIME SPACE DIAGRAM
ROUTE: CP.9
CYCLE LENGTH 70 SECONDS: SCALE I1NCH=40X OF CYCLE: 1 LINE= 165 FT
*******************************************************************************
I XXXXXXXXX \ \ XXXXXXXXXX / / XXXXXXXXXX X
2
3 XXXXXXXXXX
4 XXXXXXXXX
XXXXXXXXX XXXXXXXXXX
• XXXXXXXXXX XXXXXXXXXX
KXXXXXXXX XXXXXXXXXX X
5 XXXXXXXXX' XXXXXXXXXX XXXXXXXXX X
6 XXXXXXXXXX XXXXXXXXXX XXXXXXXXXX
MATTHEW .I DELICH
ARTERIAL PROGRESSION DEGIGN
RL448
ROUTE: CR9
INTERSECTIONS: 6 CYCLE LENGTH: 60 SYSTEM OFFSET: 0
BANDWIDTH LEFT: 13 RIGHT: 13 PERFORMANCE INDEX: 28
EFFICIENCY: 21 ATTAINABILITY: 36 INTERFERENCE: 28
---------------------------------------------------------------------------
NO. .........TIME -LOCATION DIAGRAM.......... DISTANCE SPEED
RIGHTGOU40 ... READ DOWN LEFT RIGHT LEFT RIGHT
I XXXXXXXXXXXXXXXX 1320 0 45 45
2 XXXXXXX XXXXXXXXX 1320 1320 45 45
3 XXXXXXXXXXXXXXXX 1320 1320 45 145
4 XX XXXXXXXXXXXXXX 1320 1320 45 45
5 XXXXXXXXX XXXXXXX 1320 1320 45 45
6 XXXXXXXXXXXXXXXX 0 1320 45 45
NO. OFFSET .........TIME -LOCATION DIAGRAM.......... PHASE LENGTHS
LEFTBOUND ... READ UP 1 2 3 4 5 6 7 8
1 0 XXXXXXXXXXXXXXXX 60 40
2 50 XXXXXXXXX XXXXXXX 60 40
3 50 XXXXXXXXXXXXXXXX 60 40
4 0 XXXXXXXXXXXXXX XX 60 40
5 50 XXXXXXX XXXXXXXXX 60 40
6 50 XXXXXXXXXXXXXXXX 60 40
---------------------------------------------------------------------------
TIME SPACE DIAGRAM
ROUTE: CR9
CYCLE LENGTH 60 SECONDS: SCALE (INCH=40% OF CYCLE: 1 LINE= 165 FT
*******************************************************************************
I \ xxxxxxxxxx xxxxxxxxxx / XXXXXXXXXX
04
3 XXXXXXXXXX
4 XXXXXXXXXX
5 XXXXXXXXXX
xxxxxxxxxx xxxxxxxxxx
XXXXXXXXX xxxxxxxxxx
XXXXXXXXXX XXXXXXXXXX
XXXXXXXX XXXXXXXXXX
6 XXXXXXXXXX/ / XXXXXXXXXX \ \XXXXXXXXX
*******************************************************************************
MATTHEW J DELICH
ARTERIAL PROGRESSION DEGIGN
IN11WId
ROUTE: CR9
INTERSECTIONS: 6 CYCLE LENGTH: 50 SYSTEM OFFSET: 0
BANDWIDTH LEFT: 11 RIGHT: I1 PERFORMANCE INDEX: 31
EFFICIENCY: 22 ATTAINABILITY: 38 INTERFERENCE: 21
---------------------------------------------------------------------------
NO. .........TIME —LOCATION DIAGRAM.......... DISTANCE SPEED
RIGHTBOUND ... READ DOWN LEFT RIGHT LEFT RIGHT
1 xxxx XXXXXXXXXXXX 1320 0 45 45
2 XXXXXXXXX XXXXXXX 1320 1320 45 45
3 XXXXXXXXXXXXXX XX 1320 1320 45 45
4 XXXXXXXXXXXXXXXX 1320 1320 45 45
5 XXXX XXXXXXXXXXXX 1320 1320 45 45
6 XXXXXXX XXXXXXXXX 0 1320 45 45
NO. OFFSET .........TIME —LOCATION DIAGRAM.......... PHASE LENGTHS
LEFTBOUND ... READ UP 1 2 3 4 5 6 7 8
1 10 XXXXXXXX XXXXXXXX 60 40
2 62 XXXX XXXXXXXXXXXX 60 40
3 12 XXXXXXXXXXXXXXXX 60 40
4 62 XXXXXXXXXXXXXXXX 60 40
5 62 xxxxxxxXX XXXXXXX 60 40
6 7 XXX XXXXX.XXXXXXXX 60 40
---------------------------------------------------------------------------
TIME SPACE DIAGRAM
ROUTE: CR9
CYCLE LENGTH 50 SECONDS: SCALE IINCH=40% OF CYCLE: 1 LINE= 165 FT
I XXX \XXXXXXXXX XXXXXXXXX / XXXXXXX
2 xxxxxxxxxx
3 XXX
4 XXXXXXXXXX
5
xxxxxxxxxx
XXXXXXXXXX
XXXXXXXXXX
xxxxxxxxxx
xxxxxxXXXX
xxxxxxxxxx
6 XX // XXXXXXXXXX XXXXXXXXXX \ XXXX.XXXX
MATTHEW J DELICH
ARTERIAL PROGRESSION DEGIGN
I:1119k4
ROUTE: CR9
INTERSECTIONS: 6 CYCLE LENGTH: 70 SYSTEM OFFSET: 0
BANDWIDTH LEFT: 15 RIGHT: 15 PERFORMANCE INDEX: 29
EFFICIENCY: 21 ATTAINABILITY: 36 INTERFERENCE: 27
---------------------------------------------------------------------------
NO. .........TIME -LOCATION DIAGRAM.......... DISTANCE SPEED
RIGHTSOUND ... READ DOWN LEFT RIGHT LEFT RIGHT
I XXXXXXXXXXXXXXXX 1320 0 40 40
2 XXXXXXX XXXXXXXXX 1320 1320 40 40
3 XXXXXXXXXXXXXXXX 1320 1320 40 40
4 XX XXXXXXXXXXXXXX 1320 1320 40 40
5 XXXXXXXXXX XXXXXX 1320 1320 40 40
6 XXXXXXXXXXXXXXXX 0- 1320 40 40
N0. OFFSET .........TIME -LOCATION DIAGRAM.......... PHASE LENGTHS
LEFTBOUND ... READ UP 1 2 3 4 5 6 7 8
1 0 XXXXXXXXXXXXXXXX 60 40
2 50 XXXXXXXXXX XXXXXX 60 40
3 50 XXXXXXXXXXXXXXXX 60 40
4 0 XXXXXXXXXXXXXXX X 60 40
5 50 XXXXXXX XXXXXXXXX 60 40
6 50 XXXXXXXXXXXXXXXX 60 40
--------------------------------------------------------------------------
TIME SPACE DIAGRAM
ROUTE: CR9
CYCLE LENGTH 70 SECONDS: SCALE (INCH=40X OF CYCLE: I LINE= 165 FT
I \ \\ XXXXXXXXXX XXXXXXXXXX / / XXXXXXXXXX
2 XXXXXXXXX XXXXXXXXXX
3 XXXXXXXXXX XXXXXXXX
4 XXXXXXXXXX XXXXXXXXXX
XXXXXXXXXX
XXXXXXXXXX
5 XXXXXXXXXX <XXXXXXXX XXXXXXXXXX
6 XXXXXXXXXX XXXXXXXXXX XXXXXXXXXX
XXXXXXXXXX
MATTHEW J DELICH
ARTERIAL PROGRESSION DEGIGN
RUN3
ROUTE: CR9
INTERSECTIONS: 6 CYCLE LENGTH:
60 SYSTEM OFFSET: 0
BANDWIDTH
LEFT: 15 RIGHT: 15
PERFORMANCE INDEX:
32
EFFICIENCY:
25 ATTAINABILITY: 43 INTERFERENCE:
21
---------------------------------------------------------------------------
NO.
.........TIME —LOCATION DIAGRAM.......:.. DISTANCE
SPEED
RIGHTBOUND
... READ DOWN LEFT
RIGHT
LEFT
RIGHT
1
XXXX
XXXXXXXXXXXX 1320
0
40
40
2
XXXXXXXXX
XXXXXXX I320
1320
40
40
3
XXXXXXXXXXX.XXX
XX 1320
1320
40
40
4
XXXXXXXXXXXXXXXX I320
1320
40
40
5
Xxxx
XXXXX.XXXXXXX 1320
I320
40
40
6
Xxxxxxxxx
XXXXXXX. 0
1320
40
40
NO. OFFSET
.........TIME —LOCATION DIAGRAM.........:
PHASE
LENGTHS
LEFTBOUND ...
READ UP 1
2
3 4
5 6
7 8
1 10
XXXXXXXXXX
XXXXXX 60
40
2 60
XXXXX
XXXXXXXXXXX 60
40
3 10
XXXXXXXXXXXXXXXX 60
40
4 10
XXXXXXXXXXXXXX
XX 60
40
5 57
XXXXXXXX
XXXXXXXX 60
40
6 7
---------------------------------------------------------------------------
XXX
XXXXXXXXXXXXX 60
40
TIME SPACE DIAGRAM
ROUTE: CR9
CYCLE LENGTH 60 SECONDS: SCALE IINCH=40% OF CYCLE: 1 LINE= 165 FT
*r*it it�r �+te*at��*�re�fr�e�!wear*e■*�*+t+:�+:��es<s�*•�r+r �ar••�sa+t+t �+t+��
I XXX \ XXXXXXXXXX XXXXXXXXXX /. s/*f / XXXXXXX
2 XXXXXXXXXX
3 XXX
4 XXX
5 XXXXXXXXXX
xxxxxxxxxx
XXXXXXXXXX
6 XX / / XXXXXXXXXX XXXXXXXXXX \ \ XXXXXXXX
e ear ar a ateeeaE lF aFeearar eaF aEe ee•afeeear eireeaf at a at areeeaFeeee{eak a aF lY aK eateeteeieee#eeeeee eareseaf a are
MATTHEW J DELICH
ARTERIAL PROGRESSION DEGIGN
RUNI
ROUTE: CR9
INTERSECTIONS: 6 CYCLE LENGTH: 50 SYSTEM OFFSET: 0
BANDWIDTH LEFTS 15 RIGHT: 15 PERFORMANCE INDEX: 46
EFFICIENCY: 30 ATTAINABILITY: 52 INTERFERENCE: 10
---------------------------------------------------------------------------
NO. .........TIME -LOCATION DIAGRAM.......... DISTANCE SPEED
RIGHTSOUND ... READ DOWN LEFT RIGHT LEFT RIGHT
I XXXXXXXXXXXX XXXX 1320 0 40 40
2 XXXXXXXXXXXXXXX X 1320 1320 40 40
3 XXXXXXXXXXXXXXXX 1320 1320 40 40
4 XXXXXXXXXXXXXXXX 1320 1320 40 40
5 XXXXXXXXXXXXXXXX 1320 1320 40 40
6 XXXXXXXXXXXXXXXX 0 1320 40 40
NO. OFFSET .........TIME -LOCATION DIAGRAM.......... PHASE LENGTHS
LEFTBOUND ... READ UP 1 2 3 4 5 6 7 8
1 30 XXXX XXXXXXXXXXXX 60 40
2 82 XX XXXXXXXXXXXXXX 60 40
3 32 XXXXXXXXXXXXXXXX 60 40
4 82 XXXXXXXXXXXXXXXX 60 40
5 32 XXXXXXXXXXXXXXXX 60 40
6 80 XXXXXXXXXXXXXXXX 60 40
---------------------------------------------------------------------------
TIME SPACE DIAGRAM
ROUTE: CR9
CYCLE LENGTH 50 SECONDS: SCALE IINCH=40% OF CYCLE: 1 LINE= 165 FT
2
3
4
5
6
*******************************************************************************
MATTHEW J DELICH
ARTERIAL PROGRESSION DEGIGN
RUN5
ROUTE: CR9
INTERSECTIONS: 6 CYCLE LENGTH:
70 SYSTEM OFFSET: 0
BANDWIDTH LEFT: 17 RIGHT: 17
PERFORMANCE 114DEX:
31
EFFICIENCY:
24 ATTAINABILITY: 41 INTERFERENCE:
22
---------------------------------------------------------------------------
NO.
......... TIME -LOCATION DIAGRAM.......... DISTANCE
SPEED
RIGHTBOUND
... READ DOWN LEFT
RIGHT
LEFT
RIGHT
I
XXXX
XXXXXXXXXXXX 1320
0
35
35
2
XXXXXXXXXX
XXXXXX 1320
1320
35
35
3
XXXXXXxxxxxxxXX
X 1320
1320
35
35
4
X
XXXXXXXXXXXXXXX 1320
1320
35
35
5
XXXxxx
XXXXXXXXXX 1320
1320
35
35
6
XXXXXXXXXXXX
XXXX 0
1320
35
35
NO. OFFSET
.........TIME -LOCATION DIAGRAM..........
PHASE
LENGTHS
LEFTBOUND ... READ UP l
2
3 4
5 6
7 8
I f0
XXXXXXXXXXXX
XXXX 60
40
2 60
XXXXXXX
XXXXXXXXX 60
40
3 10
X
XXXXXXXXXXXXXXX 60
40
4 10
XXXXXXXXXXXXXXX
X 60
40
5 57
XXXXXXXXX
XXXXXXX 60
40
6 10
---------------------------------------------------------------------------
XXXX
XXXXXXXXXXXX 60
40
TIME SPACE DIAGRAM
ROUTE: CR9
CYCLE LENGTH 70 SECONDS: SCALE (INCH=40% OF CYCLE: I LINE= 165 FT
*�s�+�*��e>�r�+t�nf: sett e+t+t<ss�te Breit*•��xft+ts�t�ar�x�ss��se��rr�r*it*��. sty
I XXx \ XXXXXXXXXX XXXXXXXXXx
2 XXXXXXXXXX
XXXXXXXXXX / / XXXXXXXXXX
xxxxxxxxxx \ \ xxxxxxxxxx
6 XXX j / - / XXXXXXXXXX XXXXXXXXXX \ \ XXXXXXX
+weir a ireseit it it it eiree•ite ite eeeeeeeeee+�eeir :ire ire eit :ire*ireeeair it it ireeeeeeiteeeeeeseeeeesire
MATTHEW J DELICH
ARTERIAL PROGRESSION DEGIGN
RUN4
ROUTE: CR9 -
INTERSECTIONS: 6 CYCLE LENGTH: 60 SYSTEM OFFSET: 0
BANDWIDTH LEFT: 12 RIGHT: 12 PERFORMANCE INDEX: 41
EFFICIENCY: 20 ATTAINABILITY: 34 INTERFERENCE: 12
--------------------------------------------------------------------------
NO. .........TIME —LOCATION DIAGRAM.......... DISTANCE SPEED
RIGHTSOUND ... READ DOWN LEFT RIGHT LEFT RIGHT
I XXXXXXXXX XXXXXXX 1320 0 35 35
2 XXXXXXXXXXXX XXXX 1320 1320 35 35
3 XXXXXXXXXXXXXXX X 1320 1320 35 35
4 XXXXXXXXXXXXXXXX 1320 1320 35 35
5 XXXXXXXXXXXXXXXX 1320 1320 35 35
6 XXXXXXXXXXXXXXXX 0 -1320 35 35
NO. OFFSET .........TIME —LOCATION DIAGRAM.......... PHASE LENGTHS
LEFTBOUND ... READ UP 1 2 3 4 5 6 7 8
1 22 XXXXX XXXXXXXXXXX 60 40
2 72 XX XXXXXXXXXXXXXX 60 40
3 22 XXXXXXXXXXXXXXXX 60 40
4 72 XXXXXXXXXXXXXXXX 60 40
5 22 XXXXXXXXXXXXXXXX 60 40
6 72 XXXXXXXXXXXXXXXX 60 40
---------------------------------------------------------------------------
TIME SPACE DIAGRAM
ROUTE: CR9
CYCLE LENGTH 60 SECONDS: SCALE IINCH=40% OF CYCLE: I LINE= 165 FT
*�:t�:t�:t+t�+r�+r�rxwt:t+t:trr+t+t��e*ret�i:ft�e:tz�+t+t:t�s��w<sri!i�z+rar:r r �t r>se�wszz��r is mat*�rr��e�
i
2
3
4
5
6
MATTHEW J DELICH
ARTERIAL PROGRESSION DEGIGN
RUN6
ROUTE: CR9
INTERSECTIONS: 6
CYCLE LENGTH: 50 SYSTEM OFFSET: 0
BANDWIDTH LEFT: 30
RIGHT: 30 PERFORMANCE INDEX:
60
EFFICIENCY:
60
ATTAINABILITY: 104 INTERFERENCE:
4
---------------------------------------------------------------------------
NO.
.........TIME
-LOCATION DIAGRAM.......... DISTANCE
SPEED
RIGHTBOUND ... READ DOWN
LEFT
RIGHT
LEFT
RIGHT
I
XXXX
XXXXXXXXXXXX
1320
0
35
35
2
XXX.X
XXXXXXXXXXXX
1320
1320
35
35
3
XXXX
XXXXXXXXXXXX
1320
1320
35
35
4
XXXX
XXXXXXXXXXXX
1320
1320
35
35
5
XXXX
XXXXXXXXXXXX
1320
1320
35
35
6
XXXX
XXXXXXXXXXXX
0
1320
35
35
NO. OFFSET
.........TIME
-LOCATION DIAGRAM..........
PHASE
LENGTHS
LEFTBOUND ... READ UP
1
2
3 4
5 6
7 8
1 10
XXXXXXXXXXXXXXXX
60
40
2 60
XXXXXXXXXXXXXXXX
60
40
3 10
XXXXXXXXXXXXXXXX
60
40
4 60
XXXXXXXXXXXXXXXX
60
40
5 10
XXXXXXXXXXXXXXXX
60
40
6 60
---------------------------------------------------------------------------
XXXXXXXXXXXXXXXX
60
40
TIME SPACE DIAGRAM
ROUTE: CP.9
CYCLE LENGTH 50 SECONDS: SCALE 11NCH=40X OF CYCLE: 1 LINE= 165 FT
R RRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRR#RRRRRRRRRRRRRRRRRRRRMRRifRRRRR
I
2
3
4
5
6
R RRR
I
1
�I
1
i
1
1
1
1 APPENDIX D
1
1
1
1
1
1
1
i
F7
LI
1
1
7
1
LEVEL -OF -SERVICE CRITERIA
SIGNALIZED INTERSECTIONS
Level -of -service for signalized intersections is defined in terms of delay.
Delay is a measure of driver discomfort, frustration, fuel consumption, and lost
travel time. Specifically, level -of -service crl.terie are stated In terms of the
average stopped delay per vehicle for a 15-mlrn.il:e analysis period.
Level -of -service A describes operations with very low delay, i.e., less than 5.0
seconds per vehicle.
Level -of -service 8 describes operations with delay in the range of 5.1 to 15.0
seconds per vehicle.
Level -of -service C describes operations with delay in the range of 15.1 to 25.0
seconds per vehicle.
Level -of -service D describes operations with delay in the range of 25.1 to 40.0
seconds per vehicle.
Level -of -service E describes operations with delay in the range of 411.1 to 60.0
seconds per vehicle. This is considered to be the limit of acceptable delay.
Level -of -service F describes operations with delay in excess of 60.0 seconds per
vehicle. This is considered to be unacceptable to most drivers.
RESERVE CAPACITY
UNSIGNALIZED INTE115ECTIONS
LEVEL OF
SERVICE
EXPECTED DELAY TO
MINOR 5111EET TRAFFIC
4OU A Little or no delay
30U-399 8 Short traffic delays
200-299 C Average traffic delays
1OU-199 D Long t.rafflo delays
0- 99 E Very luny traffic delays
* F
*When demand volume exceeds the capacity of the lone, extreme dolaye will be
encountered with queuing which may cause severe congestion affoul.ing other
traffic movements in the intersection. This condition usually warrants
Improvement to the intersection.
I
17
1
i
i
i
1
i
7
1 APPENDIX C
1
I
i
i
i
[1
1
L
i
= = = M M
1985 HCM: SIGNALIZED INTERSECTIONS
SUMMARY REPORT
FXXF:KC'Mt:K.K.KXIXRXXXXRXtXXXXXYX'.KXX X.F>.XXXXY(XXX...X.KX. Y:K RX XX RXXXXXX.K XX.KXXKX.K:KX
INTERSECTION..harmony/cr9
AREA TYPE ..... OTHER
ANALYST....... mid
DATE.......... 4/21
TIMEall pal ex short 450 6
COMMENT.. .,.,0 no :_orbett long 900
__________________________________________________________________________
VOLUMES GEOMETRY
EB WB NB SB : ES WB NB SB
LT 97 5 4 37 L 12.0 L 12.0 L 12.0 L 12.0
TH 1069 617 1 T 12.0 T 12.0 TR 12.0 TR 12.0
RT 23 5 9 T 12:0 T 12.0 12.0 12_0
RR 0 0 0 0 R 12.0 R 12.0 12.0 12.0
12.0 12.0 12.0 12.0
12.0 12:0 12.0 12.0
__________________________________________________________________________
ADJUSTMENT FACTORS
GRADE �HV ADJ PKG -BUSES PHI= PEDS PED. BUT. ARR. TYPE
(%) (%) -YIN Nm Nb YIN min T
EB 0.00 2.00 N 0 0 0.90 5 N 19.8 4
WP 0.00 2.00 N 0 0 0.90 5 N 19.3 4
NB 0.00 1.00 N 0 0 0.90 5 N :31.8 3
SB 0.00 1.00 N 0 0 0.90 5 N 31.8 3
__--______________________________________________________________________
SIGNAL SETTINGS CYCLE LENGTH = 100.0
PH-1 PH-2 PH-3 PH-4 PH-1 PH-2 PH-3 PH-4
ES LT X NB LT X
TH X TH X
RT X RT X
PD X PO X
WB LT X SB LT X
TH X TH X
RT X RT X
PD IPD X
GREEN 65`0 0.0 0.0 0.0 GREEN 25.0 O.Fi 0.0 0.0
YELLOW 5.0 0.0 0.0 0.0 YELLOW 5.'3 0.0 0.0 0.0
__________________________________________________________________________
LEVEL OF SERVICE
LANE GRP. V/C G/C DELAY LOS APP. DELAY APE'. LOS
Eft L 0.228 0.670 4.9 A 4.1 A
0.522 0.670 4.1 A
R 0.003 0.670 2.6
WB 1 0.032 0.670 A.,3_1
T 0.301 0.670
R 0.025 0.670 °_6
NB I_ 0.010 0.270 20.3 C 13 . 5; C
TR 0.016 0.270 17 3 C
se0.093 1)110 20.3 C 20.0 C
TR 0.02, 0.270 l; C
______________________________________----_--_---_-__________-_________--_
INTEF'3ECTION: Delay = 4.3 iserivehi V/C = 0.,.99 LOS = A
:935 ICM: SIGNALIZED iNTERSECTIONS
ZUMMARY REPORT
I: K..K XXXX'F R:K :K..W. Y.X K:A X:K :K kXX \'RKXXRRX X.R :FX KXK KKY K.Y aX;XX..F RY'K �:MR YRKz:K<tX:K t:K .K#ZW K K.%XY
INTERSECTION..harmony/cr9
AREA. TYPE... -.OTHER
ANALYST ........ nid
0A.TE.......... 4,`
TIME.... .am Pn short 450 6
f, OhIMENT....... iP11, no . orb: tt long 900
__________________________________________________________________________
VOLUMES GEOMETRY
EB WB NB SB EB WP, NB SP
LT 7 3 3 43 L 12.0 L 12.0 I_ 12.0 I_ 1'L.0
TH 759 1310 1 2 T 12.0 T 12.0 TR 12.0 TR 12.0
RT 4 60 :3 96 T 12.0 i 12.0 12.0 12.0
RR 0 0 0 0: R 12.0 R 12.0 12.0 12.0
11.0 12.0 12.0 12.0
12.0 12.0 i2.0 12.0
__________________________________________________________________________
ADJUSTMENT FACTORS
GRADE HV A6.1 PKG BUSES, PHF PEDS PED. B(li. ARR. TYPE
(%) (%) YIN Nm Nb YIN ruin T
EB 0.00 2.00 N' 0 0 0.90 5 N 19.8 4
WB 0.00 2.00 N 0 0 0.90 5 N 19.3 4
NB 0.00 1.00 N 0 0 0.90 5 N :131.3 3
SB 0.00 1.00 N 0 0 0.90 5 N 31.8 3
__________________________________________________________________________
SIGNAL SETTINGS CYCLE LENGTH = 100.0
PH-1 PH-2 PH-3 PH-4 PH-1 PH-2 PH-3 PH-4
ES LT NB LT X
TH X TH X
RT X RT X
PD X PD X
WS LT X SB LT X -
TH X TH X
RT X RT X
PD X PO X
GREEN 65.0 0.0 0.0 0.0 GREEN 25.0 0.0 0.0 0.0
YELLOW 5.0 0.0 0.0 0.0 YELLOW 5.0 0.0 0.0 0.0
______________________.-------____-_---_____-____-_________________________
LEVEL OF SERVICE
LANE GRP. V/C G/C DELAY LOS APP. DELAY APP. LOS
EB L 0.103 0.670 4.5 A 3.4 A
T 0_371 0.670 3.4
R 0.004 0.670 2.6 A
WB L 0.00.9 0.670 ._ 5.3 P
T 0.640 0.670 5.4 P•
F.• n.066 0.670 2.7 a
Ng I. 0.009 0.270 20.3 C 13.6 C
TR 0.010 0.270 17.-, C
58 L 0.103 0.270 20.9 C 19.3 C
TR 0.265 0.27n 13.6 il
_.._-----------------------------------------------------------------------
INTERSECTION: nelav = 5.6 (sec/veh) V/C = 0.532 LOS = B
1985 HCM: UNSIGNALIZED INTERSECTIONS P'a oe-1
A YI[YYti:k%Y%F%F%:ktYYFX.f FYX X:VY a t%Y:K X.%.K V :a%1%X %.K F .k X:t YYYr%%F.F i.I..F tX K.F%.%'.k:C K'k
IDENTIFYING INFORMATION
"--------------------------------------- -------------------------
AVERAGE RUNNING SPEED, MAJOR STREET.. 55
PEAK HOUR FACTOR ..................... 1
AREA POPULATION ...................... 80000
NAME OF THE EAST/WEST STREET......... haromny
NAME OF THE NORTH/SOUTH STREET....... cr9
NAME OF THE ANALYST .................. mjd
DATE OF THE ANALYSIS (mm/dd/yy)...... 4/=1
TIME PERIOD ANALYZED ................. am ae short 450
OTHER INFORMATION.... 650 corbett no
INTERSECTION TYPE AND CONTROL
---------------------- ---------------
INTERSECTION TYPE: 4-I_EG
MAJOR STREET DIRECTION: EAST/WEST
CONTROL TYPE NORTHBOUND: STOP SIGN
CONTROL TYPE SOUTHBOUND: STOP SIGN
TRAFFIC VOLUMES
EB WB NB SB
---- ---- ---- ----
LEFT 7 3 3 43
THRO 455 786 1 Z
RIGHT 4 ti0 96
:aU MBER OF I_ANFS AND LANE USAGE
---------------------------------------------------------------
EB WB N8 '36.
------- -------------- -------
t. AN E'c.
L p;JF USAGE LT + R LT R
CAPACITY AND LEVEL -OF -SERVICE Page--
---------------------------------------------------------------------
POTEN- ACTUAL
FLOW- TIAL MOVEMENT SHARED RESERVE
RATE CAPACITY CAPACITY CAPACITY CAPACITY
MOVEMENT v(p.ph) c (pcph) c rpcph) c ,pcph) = c - v LOS
o M SH R SH
----- ------- ------- ----------- ------------ --
MINOR STREET
NB LEFT 3 44 39 > 44 39 - 39 35 >E F-
THROUGH 1 76 75 > 75 > 73 >
RIGHT 3 861 861 861 857 A
MINOR STREET
SB LEFT 47 62 60 > 61 60 > 11 13 >E E
THROUGH Z ?CZ I > 78 76 > E
RIGHT 106 683 683 683 578 A
MAJOR STREET
ES LEFT 8 :343 343 343 335 8
W6 LEFT 3 579 579 579 575 4
IDENTIFYING INFORMATION
NAME OF THE EAST/WEST STREET...... haromny
NAME OF THE NORTH/SOUTH STREET.... cr9
DATE AND TIME OF THE ANALYSIS.... 4/71 ; dm( �short 450
OTHER INFORMATION.... 650 corbatt no
1985 HCM: UNSIGNAI.IZED INTERSECTIONS Page -I
Y #:K K:.F F:K<#;K K#f.K .K [t:k ### Y.'KXF F".R##:Y..K# ♦.:R F. l.FF.F### #:Y :KYi# Y.##'Y K K<:K :1'F KFYF#F#:K :K .K K
IDENTIFYING INFORMATION
-------------- ---------------------------
AVERA9E PUNNING :PEED. MAJOR STREET.. 55
PEAK HOUR FACTOR ..................... 1
AREA POPULATION ...................... 30000
NAME OF THE EAST/WEST STREET......... haromny
NAME OF THE NORTH/SOUTH STREET....... Cr9
NAME OF THE ANALYST ................... mid
DATE OF THE ANALYSIS (mm/dd/yy)...... 4121
TIME PERIOD ANALYZED ................. umsh ort 450
OTHER INFORMATION..._ 650 Corbett no
INTERSECTION TYPE AND CONTROL
---------------------------------------------------------------------
INTERSECTION TYPE: 4-1_EG
MAJOR STREET DIRECTION: EAST/WEST
CONTROL TYPE NORTHBOUND: STOP SIGN
CONTROL TYPE SOUTHBOUND: STOP SIGN
TRAFFIC VOLUMES
---------------------------------------------------------------------
ES WB NB 38
---- ---- ---- ----
LEFT
T; iR I1 641 370 i i
R[OHT J °3 5 9
NLIMBER OF LANES ANO LANE USAGE
------------------------------------------------------------------..--
Eli WB rip,
------- ---------------------
I.ANES
L,,"F LT is i.T
CAPACITY AND LEVEL -OF -SERVICE Page-3
---------------------------------------------------------------------
POTEN- ACTUAL
FLOW- TIAL MOVEMENT SHARED RESERVE
RATE CAPACITY CAPACITY CAPACITY CAPACITY
MOVEMENT v(pcph) (PCph) c �pcph) (Pcph) C = .
P M `.H R SH
--------------- --------------------- ------------ ---
MINOR STREET
NB LEFT 4 36 74 > 77 ?4 1-1 70 >E E
THROUGH 1 104 91 > 91 90 > E
RIGHT 6 770 .770 770_ 765 A
MINOR STREET
SB LEFT 41 83 77 > 77 77 > 35 36 >E E
THROUGH 1 106 93" >93 > 92 > E
RIGHT 10 894 894 894 884 A
MAJOR STREET
F-B LEFT 107 626 626 626 520 A
WB LEFT 6 455 455 455 449
IDENTIFYING INFORMATION
------------------------------------------------------------
NAME OF THE EAST/WEST STREET...... haromnv
NAME OF THE NORTH/SOUTH STREET.... ar9
DATE AND TIME OF THE ANALYSIS..... 4/21 am pm ex short 450
OTHER INFORMATION.... 'i50 Corbett no
APPENDIX B
'Site Code : 00000144
N-S Street: COUNTY RD. 9
E-N Street: HARMONY ROAD
Heather : SUNNY
1
CITY OF FORT COLLINS TRAFFIC ENGINEERING
PAGE: 1
FILE: 144-1092
Movements by: Primary DATE: 10/28/92
PEAK PERIOD ANALYSIS FOR THE PERIOD: 04:30 PH - 05:30 PH
c
DIRECTION
START
PEAK HR
...........
VOLUMES
...........
...... PERCeNT,........
FROM
PEAK HOUR
FACTOR
PEDS
Right
Thru
Left
Total
-------------------------------
PEOS Right
Thru
Left
----------------------------------------------------------------
North
4:30 PM
0.86
1
96
2
43
141
- 58
1
30
East
4:30 PM
0.93
3
60
1310
3
1373
- 4
95
0
South
4:30 PM
0.58
0
3
1
3
1
- 43
14
43
Nest
4:30 PH
0.92
0
4
159
1
110
- 1
99
1
Entire Intersection
North 4:30 F.4 0.86 1 96 2 43 141 - 68 30
East 0.93 3 60 1310 3 1313 - 4 95 0
South 0.58 0 3 1 3 1 - 43 14 43
Nest 0.92 0 4 753 7 170 - 1 99 1
COUNTY RD. 9 ;...; N
— — — — — — — — — — — — ' W—+—E
�...,
S
68 '
[PEDS ] 1 ; 96 ; 2 ; 43 ............: 3 [PEDS ]
.................. �— 141 -- -- 60
.......... 1409
... HARMONY ROAD 1373 1310
7 —�
759 770
4 --
7
[PEDS ] 0 :............: 3 ; 1
9
...; COUNTY RD. 9
— — — — — — — — — — —
— 3
CITY OF FORT COLLINS TRAFFIC ENGINEERING
Site Code : 00000144
N-S Street: COUNTY RD, 9
E-W Street: HARMONY ROAD
Weather : SUNNY
------------------------
Movements by: Primary
PAGE: 1
FILE: 144-1092
DATE: 10/28/92
'
DIRECTION
PEAK
START
PERIOD ANALYSIS FOR THE
PEAK HR ...........
PE97OD:
VOLUMES
1:30 AM - 08:30 AM
........... ......
PERCENTS ...,...
FROM
PEAK HOUR
FACTOR
PEDS Right
Thru
Left
Total PEDS
Right
Thru
Left
'
--North---- --------
--1:30----AM --------
0----,82 ---------
0 ------9 ---------
0
----------------46
31
----20
-------
0 -----
80----
East
1:30 AM
0.81
0 23
617
5
645 -
4
96
1
'
South
West
1:30 AM
7:30 AM
0.63
0.93
0 5
5 3
1
1069
4
97
10 _
1169
50
0
10
91
40
8
'
North
7:30 AM
0.82
Entire
0 9
Intersection
0
37
46
20
0
80
East
0.81
0 23
511
5
645 -
4
96
1
South
0.53
0 5
1
4
i0 _
50
10
40
West
0.93
5 3
1069
97
1169
0
91
8
[PEDS 0
-- — — —— —]—— _
t.......... •630
..................
' ... HARMONY —ROAD
-----------------
COUNTY RD. 9 ;...; N
----------- W—+—E
,...,
S
�.. 121 ...;
9 ; 0 ; 37 :............: 0 [PEDS ]
— 46 — — — — -- 23
'------------
645 617
------------
97 -- —
t
1069 1169
3 —� --- 10 — — — —
------------------
[PEDS ] 5 :............: 4 ; 1 ; 5
i 8
�•.............
�
. .; COUNTY RD. 9
------------
1
5
HARMONY ROAD ...
. .1111��..........
------------------
0 [PEDS ]
m m m m m m = = = m = = = = = m= m r
MATTHEIN J. DELICH, P.E.
3413 BANYAN AVENUE
LOVELAND, CO 805W
TABULAR SUMMARY (O,F VEHICLE COUNTS
Observer Date 3 30 4¢ Day ,� �YClty POP- " CLL1a S R = Right turn
o t / Pd cKA�� S = Straight
INTERSECTION OF �` AND mL�—� L = Left turn
TIME
BEGINS
from NORTH
TOTAL
North
South
from EAST
TOTAL
East
West
TOTAL
ALL
from SOUTH
from WEST
R
S
I L
Total
R
S
I L
I Total
R
S
I L
Total
I R
S
L
I Total
Zia
II
illo
43
s9p7—
15
1
1 4-0
11 91
s'I
10
z45-II
1 16n,
-77-
$ 8
154
S1
I
I s5
11143
113
I
14
1 7
11
7
II 1
(i�-mt>
I
I (<
6G1
$4
11-34-
is
1
1 4-4
11133 113
1
10
1 3
Qs1S
17-
1 791
9 1
113
14
1
I sZ
1114. 3 II
Z
I
l0
1 z
II
I
I
IL z
II 14s—
I
I
I
I
I
II
I
I
I
I
I
I
I.
II
-23 3s 0
2.z(n013Z.21131
sl
119 GIIs1
'3 Ili-5I
1 4-
1 17
11
I
1
1
I 1'7
1153 s
I
I
I
I
I
I
II
i
I
I
it
I
I
II
I
I
i
I
I
II I
I
I
I
II
I
i
I
II
II
I
I
I
I
I II
I
I
I
MEMO
I
II
I
I II
i
I I
II
I
I
I
II
I
I
II
i I
II
II
I
I
I
II
I
I
I
I
4-�0
1 1
15 1
z 1
1�7 11
1
1(o 1
1
17 11
34 135
1
03 1
4to 11
I
1
1
11
4(0 11.
To
4¢s`I
19
14
I
i3
I Z
1'i I
Zo 11
33
4.41
IZ31
(:,7 11
1
I
( -7 II
100
�00 11
1
10
7 1
1-7
¢s
471
I1z
1
s91
1
1
I
11
:-'?
110
51 S
1
1-7
3 1
2-0 l
2 4- 1
1
z- 5 11
4-9 116&1
1
z31
1
1I
I
t 3
I
I
I
II
I
I
II
I
I.
I
I
I
I
V I
I
II
3o-s3 1
�5- 1 I
► co 1(,
711)
y
7 91
19
4-11
110
d
171
2(p III
I
I
1
11
-Z III-
z z
i
i
a five lane cross section at or before the year 2015. The 70 foot
arterial cross section will have 6 foot bike lanes.
It is recommended that parking not be allowed in the first
100+ feet west of CR9 on both the North and South Access streets
of the Strachan/Shields PUD. This will allow striping of two
westbound lanes and one eastbound lane on each street. The
driveways for lots 1, 90, and 37 should be located as close to the
east lot line as practicable.
1
Accidents
The recommended geometry, roadway cross sections, and control
for the area streets should minimize vehicle conflicts and maximize
vehicle separation. The accident rate should be normal for typical
' urban conditions.
' IV. CONCLUSIONS
This study assessed the impacts of the Strachan/Shields PUD
' residential development on the short range (1997 and 1998) and long
range (2015) street system in the vicinity of the proposed
developments. As a result of this analysis, the following is
concluded:
- The development of the Strachan/Shields PUD is feasible
from a traffic engineering standpoint. At full development of this
' development, approximately 1100 trip ends will be generated at this
development daily.
' - With the newly installed signal, operation at the
Harmony/CR9 intersection is acceptable.
- In the short range future (1997 development scenario),
' operation will be acceptable at all key intersections.
- In the short range future (1998 development scenario),
' operation will be acceptable at all key intersections with the
geometry shown in Figure 8.
' - In the long range future (2015), all intersections will
e operatacceptably in the peak hours with the geometry shown in
Figure 9. Signals will be warranted at the CR9/Collector
intersection.
- With the recommended control and geometrics, the accident
rate should be at an acceptable level for typical urban conditions.
1
COLLECTOR 1 /�-
NCR
}
Z
U
N
NORTH ACCESS
Site
SOUTH ACCESS
m
HARMONY ROAD
LONG RANGE GEOMETRY
Figure 9
J
1
1
II
II
e
SHORT RANGE GEOMETRY
Figure 8
Table 5
Long Range (2015) Peak Hour Operation
Intersection
Harmony/CR9 (signal)
CR9/South Access (stop sign)
WB LT
WB RT
SB LT
CR9/North Access/Collector,(signal)
Level of Service
AM PM
B C
C
A
A
B
C
A
A
C
Table 3
Short Range (1997) Peak Hour Operation
Intersection
Harmony/CR9 (signal)
CR9/South Access (stop sign)
WB LT
WB RT
SB LT
CR9/North Access (stop sign)
WB LT
WB RT
SB LT
Level of Service
AM PM
B B
C
A
A
C
A
A
Table 4
Short Range (1998) Peak Hour Operation
Intersection
Harmony/CR9 (signal)
CR9/South Access (stop sign)
WB LT
WB RT
SB LT
CR9/North Access (stop sign)
WB.LT
WB RT
SB LT
B
A
A
B
A
A
Level of Service
AM PM
B B
C
A
A
C
A
A
C
A
A
C
A
A
41
N
LO
F4 o o
—10/5
COLLECTOR) +
25/15
NORTH ACCESS
75/330
f
5/15
60/270—�
Ln ,n o
o\o
N O
/
N
� Site �
0
o�
�
'^ LO
- 15/10
25/15
SOUTH ACCESS
fr
00 N7
Q
\O
Z
o
V�
0
Q
O
z
'o
NCR
HP
U
000
Soto
\\\
210/250
r)orn
0/1
11
110/130
350 150
1340 1260 -
LO C)
140/155 --�
N
o 0 0
,n n �
N , ,
HARMONY ROAD
AM / PM
Rounded to Nearest
5 Vehicles.
LONG RANGE (2015) PEAK. HOUR TRAFFIC Figure 7
r
N
\tn
10/10
} %,5/10 NORTH ACCESS
7-!U�
o
N
Site
loe
toLO
,0/10
/r-,5/"
SOUTH ACCESS
r
a)
C�o CD
G
�Ln
z
to
c^
a
0
m
}
z
NCR 0
HP
U
0 0
mom
84
-100/150
- 700/1610
r
/r— 45/60
255/70
1180/1005 -
C n
40/65
� c
T N N
HARMONY ROAD
AM / PM
Rounded to Nearest
5 Vehicles.
N
SHORT RANGE (1998) PEAK HOUR TRAFFIC Figure 6
NCR
0
Go
n
d
�,o
LO
to LO 10/5
/`— " " NORTH ACCESS
0
Site
CD
co
i
to L 10/5
i �,i 15/" SOUTH ACCESS
CD 1 1
oL0
O ,Lo
z o
0
a
0
m
z
n
0
o LO
r--o�
-115/135
- -
+ 630/1500
35/50
25Y65
1035 920
o
35/55 -
o o
Ln
w N
HP
HARMONY ROAD
AM / PM
Rounded to Nearest
5 Vehicles.
SHORT RANGE (1997) PEAK HOUR TRAFFIC Figure 5
I
70 seconds (about half the Harmony Road cycle length) depending
upon the time of day.
' Operations Analysis
Capacity analyses were performed on key intersections
accessing the Strachan/Shields site and the Harmony/CR9
intersection. The analyses correspond with the traffic forecasts
shown in Figures 5; 6, and 7.
Using the traffic volumes shown in Figure 5, the key
' intersections operate in the 1997 short range condition as
indicated in Table 3. Calculation forms for these analyses are
provided in Appendix E. All intersections will operate acceptably.
' Using the traffic volumes shown in Figure 6, the key
intersections operate in the 1998 short range condition as
indicated in Table 4. Calculation forms are provided in Appendix
F. All intersections operate acceptably.
Using the traffic volumes shown in Figure 7, the intersections
operate in the long range condition with the proposed developments
as indicated in Table 5. Calculation forms for these analyses are
provided in Appendix G. At this level of background traffic and
site generated traffic, the key intersections will operate
' acceptably with the geometric improvements recommended later in
this report.
Geometric Analysis
The geometry at the various intersections was analyzed using
the short range traffic (Figure 6) and long range traffic
conditions (Figure 7).
' CR9 will be improved to one-half of an arterial cross section
with this development. The improvement will occur on the east side
of CR9. This will result in a street width of 40+ feet. While
' auxiliary right- and left -turn lanes are not required based upon
the anticipated traffic from the Strachan/Shields PUD, there is
merit in striping CR9 with a three lane cross section. The third
lane can be a center left -turn lane or a continuous two-way left -
turn lane in this area. This striping would be compatible with the
short range geometry recommended in the NCR Site Access Study.
Details of the design should occur later in the approval process.
Figure 8 shows the short range
geometry, assuming this three
lane
'
scheme.
The long range geometry
is shown in Figure 9. At
the
'
Harmony/CR9 intersection, the
geometry is determined by
the
operation of the intersection.
It is expected that CR9 will
have
1 5
I
Collins and, as such, the traffic increases are
largely dependent
upon land development. Background
traffic
was increased
incrementally by 2-3 percent per year on
Harmony
Road for the short
'
range future analysis years. Traffic
on CR9
was increased to
reflect the expected development both north and south of Harmony
Road. The traffic projections from the
City of
Fort Collins staff
and previously completed traffic studies in the area were used to
obtain the long range background traffic forecasts.
' Trip Assignment
' Trip assignment is how the generated and distributed trips are
expected to be loaded on the street system. The assigned trips are
the resultant of the trip distribution process. Figures 5 and 6
show the short range peak hour site generated traffic as described
' earlier, plus background traffic. The background traffic also
includes incremental development of the NCR facility. Figure 7
reflects full development of Strachan/Shields and full development
t of all the land on the west side of CR9 as an industrial park (NCR
included).
' Signal Warrants
As a matter of policy, traffic signals are not installed at
' any location unless warrants are met according to the Manual on
Uniform Traffic Control Devices. Other than the expected signal
at the Harmony/CR9 intersection, no signals are anticipated along
CR9 in the short range futures that were analyzed. However, the
long range future traffic forecasts indicate that a signal will be
warranted at the CR9/Collector Street intersection, located at/near
the half section line. This signal will be warranted based upon
expected traffic from the assumed industrial park adjacent to the
NCR site. In addition to this signal, the NCR Site Access Study
indicated that a signal would be warranted at the CR9/NCR/Hewlett
' Packard intersection.
' Signal Progression
' Signal progression was evaluated in a general fashion on CR9.
Since Harmony Road is a major arterial, continuous signal
progression from the north side of Harmony Road will not likely
continue to the south side of Harmony Road. The anticipated two
' signals are at quarter mile spacing. The minor street green time
will be short during most hours of the day. It is only during the
peak hours that these signals will have significant demand. The
' time/space diagrams in Appendix D show quarter mile spacing. It
is expected that the cycle lengths of signals along CR9 will be 50-
1 4
1
1
1I
1
1
' TRIP DISTRIBUTION
N
NO SCALE
Figure 4
1
H-
Z'
Di
O
U!
�T1I=[Z l
A&
N
NO SCALE
0
SITE PLAN
Figure 3
Table 1
Existing Peak Hour Operation
Intersection
Harmony/CR9 (signal)
Land Use
Level of Service
AM PM
L
Table- 2
Trip Generation
Daily A.M. Peak
Trips Trips Trips
in out
Strachan/Shields PUD
Single Family Detached - 1070
112 D.U.
L,
P.M. Peak
Trips Trips
in out
22 62 74 39
I
intersection will likely be diverted to CR9. This will be
especially true for southbound left turns to Harmony Road.
Existing Operation
t Table 1 shows the operation at the counted intersections
during the peak hours. Calculation forms are provided in Appendix
B. Appendix C describes level of service for signalized and
' unsignalized intersections from the 1985 Highway Capacity Manual.
With the recently installed signal, the Harmony/CR9 intersection
operates acceptably.
III. PROPOSED DEVELOPMENT
Strachan/Shields is a residential development located east of
CR9 and north of the Hewlett Packard Fort Collins Facility. Figure
' 3 shows a general site plan of Strachan/Shields. For analysis
purposes, the following development assumptions were made: 50%
built by 1997, 60% built by 1998, and 100% built by/before 2015.
These development years were selected specifically to correspond
with the analyses performed for the proposed NCR facility to the
west.
' Trip Generation
Trip generation is important in considering the impact of a
development such as this upon the existing and proposed street
system. A compilation of trip generation information, prepared by
the Institute of Transportation Engineers (Trip Generation, 5th
' Edition) was used to forecast site generated trips. Table 2 shows
the trip generation on a daily and peak hour basis.
Trip Distribution
' The trip distribution was determined based upon the location
attractions for home -based trips that are typical during the peak
hours. The attractions for home -based trips are primarily
employment and shopping locations. The trip distribution is shown
' in Figure 4.
' Background Traffic
Background traffic is defined as the traffic that is and/or
' will be on the area streets that is not related to the proposed
development. Future analysis years were 1997 and 1998 (short
range) and 2015 (long range): This is a developing area of Fort
L
N
' RECENT TRAFFIC COUNTS Figure 2
�I
Land Use
Land uses in
the area are primarily agricultural, industrial
or residential.
Residential and agricultural uses exist to
the
west of Strachan/Shields across CR9. The Hewlett Packard (HP)
Fort
Collins Facility
is south of the site. There is a large
lot
residential area
east and north of the site.
Land in the
area is essentially flat. The center of
Fort
'
Collins lies to the
northwest of Strachan/Shields.
Roads
The primary streets near Strachan/Shields are CR9 and Harmony
Road. CR9 is west of the site. It is a north -south street
designated as an arterial north and south of Harmony Road. Adjacent
to the site, it has a two lane rural cross section. Specifics of
the future cross section of CR9 will be addressed in this study.
' There was a signal installed at the Harmony/CR9 intersection in the
last month or so. South of Harmony Road, CR9 is a two lane gravel
road.
Harmony Road is a four lane state highway, designated as a
major arterial. Harmony Road has an interchange with I-25. In the
vicinity of the site, the cross section consists of two lanes in
' each direction with a grass median. There are right- and left -turn
lanes at most intersections, including CR9. The posted speed is
55 mph, but may be dropped to 45 mph when the signal is installed.
' In the future, Harmony Road is expected to be widened to six
through lanes.
Existing Traffic
Peak hour traffic flow at the Harmony/CR9 intersection is
' shown in Figure 2. These count volumes were obtained in 1991. Raw
traffic count data is provided in Appendix A. The traffic counts
indicate a higher eastbound directional split in the morning peak
' hour and a higher westbound directional split in the afternoon peak
hour. Figure 2 also shows 1994 peak hour traffic at the CR9/HP
intersection. Comparisons of these and other traffic counts
performed for other projects in the area indicate that traffic has
not changed significantly on Harmony Road. In the morning peak
hours, traffic has decreased slightly on Harmony Road by 8% in the
3 years between counts. During the afternoon peak hour, traffic
' has increased by 5% in the same time period. On CR9, traffic has
increased significantly in the morning peak hour and hardly at all
in the afternoon peak hour. It is expected that the traffic will
' increase on CR9 now that the traffic signal has been installed.
Some of the traffic currently at the Harmony/Timberline
1 2
I. INTRODUCTION
This traffic impact study addresses the capacity, geometric,
and control requirements at and near a proposed residential
development hereinafter known as Strachan/Shields, located west of
' CR9 and north of Hewlett Packard in Fort Collins, Colorado. This
study also considers various development proposals and land that
will likely develop in the next 10-20 years.
' During the course of the analysis, numerous contacts were made
with the project planning consultants (Cityscape Urban Design), the
developer (Brad Bennett), the Fort Collins Planpiing Dep rtment, d
the Fort Collins Transportation Division. This study genera�y
' conforms to the format set forth in typical traffic impact study
guidelines. The study involved the following steps:
Collect physical, traffic, and development data;
Perform trip generation, trip distribution, and trip
assignment;
Determine peak hour traffic volumes and daily traffic volumes;
Conduct capacity and operational level of service analyses on
key intersections and roadway sections;
' = Analyze signal warrants;
Analyze signal progression;
Analyze potential changes in accidents and safety
considerations.
This report is prepared for the following purposes:
- Evaluate the existing conditions at key intersections and
roadway segments;
- Estimate the trip generation by the proposed/assumed
' developments;
Determine the trip distribution of site generated traffic;
-
Evaluate operation at key intersections and roadway segments;
- Determine the geometrics at key intersections;
' - Determine the impacts of site generated traffic on key
intersections.
Information used in this report was obtained from the City of
Fort Collins, the planning and engineering consultants, the
developers, research sources (ITE, TRB, etc.), and field
' reconnaissance.
' II. EXISTING CONDITIONS
The location of Strachan/Shields is shown in Figure 1. It is
' important that a thorough understanding of the existing conditions
be presented.
f-1
LI
EXECUTIVE SUMMARY
Strachan/Shields PUD is a residential development, located
east of CR9 and north of Hewlett Packard in Fort Collins. This
traffic impact study involved the steps of trip generation, trip
distribution, trip assignment, capacity analysis, traffic signal
warrant analysis, signal progression analysis, and safety analysis.
This study.assessed the impacts of the Strachan/Shields PUD
residential development on the short range (1997 and 1998) and long
range (2015) street system in the vicinity of the proposed
developments. As a result of this analysis, the following is
concluded:
- The development of the Strachan/Shields PUD is feasible
from a traffic engineering standpoint. At full development of this
development, approximately 1100 trip ends will be generated at this
development daily.
' - With the newly installed signal, operation at the
Harmony/CR9 intersection is acceptable.
In the short range future (1997 development scenario),
operation will be acceptable at all key intersections.
- In the short range future (1998 development scenario),
' operation will be acceptable at all key intersections with the
geometry shown in Figure 8.
' - In the long range future (2015), all intersections will
e operatacceptably in the peak hours with the geometry shown in
Figure 9. Signals will be warranted at the CR9/Collector
intersection.
With the recommended control and geometrics, the accident
rate should be at an acceptable level for typical urban conditions.
1
STRACHAN/SHIELDS PUD
SITE ACCESS STUDY
FORT COLLINS, COLORADO
JULY 1994
Prepared for:
Chateau Custom Builders, Inc
8101 East Prentice Avenue, Suite 815
Englewood, CO 80111
Prepared by:
MATTHEW J. DELICH, P.E.
3413 Banyan Avenue
Loveland, CO 80538
Phone: 303-669-2061