HomeMy WebLinkAbout5 SENSES ENLARGED HOME DAYCARE PUD - PRELIMINARY / FINAL - 23-94 - SUBMITTAL DOCUMENTS - ROUND 1 - SUBMITTAL CHECKLISTChecksheet{/'��'�
T-P
The following check sheet is to be used in the preparation of a complete submittal of a Final PUD
Plan:
1. Application form (1 copy).
F. Filing Fee- Lat
--- 3. Site plan (25 folded copies).
4. Landscape plan (16 folded copies).
t �/T` 5. Final subdivision plat (21 folded copies).
N f'C 6. Final utility plans (10 unfolded copies).
7. Final drainage report and plans and grading plans (4 copies).
8. Other documentation as determined by special circumstances._.,
9. Signage (circle size) Large Small
S.F. 100 or more D.U. S. . up to 100 D.U.
M.F. 100 or more D.U. M.F. up to 100 D.U.
Non -Res 50,000 S.F. or more Non -Res 25,000-50,000 S.F.
Non -Res w/ regional impact All other projects not listed
M