HomeMy WebLinkAboutSPRADLEY BARR FORD EXPANSION - BASIC DEVELOPMENT REVIEW - BDR180025 - SUBMITTAL DOCUMENTS - ROUND 1 -Comment Number: 2
Comment Originated: 02/06/2018
02/06/2018: A Minor Amendment to the existing conditions is required to expand the
building.
The minor amendment should include a site plan, landscape plan and elevations of
the new portion of the building. A lighting plan is need if there is new exterior lighting.
Response — Acknowledged
Comment Number: 3 Comment Originated: 02/06/2018
02/06/2018: Is there any bicycle parking on site?
Response — There is already bicycle parking on site.
Comment Number: 4 Comment Originated: 02/07/2018
02/07/2018: Is there a dumpster enclosure on site? Is it sufficiently sized with the
increased building trash and recycling needs?
Response — There currently is a large enclosure on the west side of the
building.
Comment Number: 5
Comment Originated: 02/07/2018
02/07/2018: If any trees removed they will need to mitigated for, through new
plantings.
Depending on the parking configuration for those areas affected by the proposed
changes, landscape islands with trees are needed at the end of parking rows.
Response — A single tree was removed, an existing parking island was
extended to make up for the lost impervious material and new scrubs are
planned to match the existing island planting. No other landscaping
changes are proposed.
Comment Number: 6 Comment Originated: 02/07/2018
02/07/2018: New mechanical equipment will need to be screened.
Response — Acknowledged
Comment Number: 7
Comment Originated: 02/07/2018
02/07/2018: A new building should not have long blank walls. This can be
accomplished in different ways as mentioned in the meeting. Please contact us with
questions.
Response — The building addition is consistent with existing architecture
using masonry construction. Colors will also fall in line with existing site
conditions and we will use alternating material textures to maintain
architectural banding around the building similar to existing.
Page 10 of 10
Contact: Tim Tuttle,, TTUTTLE@fcaov.com
Topic: General
Comment Number: 1 Comment Originated: 02/06/2018
02/06/2018: Based on the addition shown additional traffic generated is assumed to
be low. Please provide a brief narrative describing the changes in traffic to the site.
With the information shown on the plan currently a Traffic Impact Study can be
waived.
Response — A new body shop will be added to the north side of the building
and will work very similar to the existing service department. Customers
will still arrive in the customer parking area on the south side of the
building where body shop staff will be inside helping customers. Any cars
staying for service will be shuttled to the west side of the lot designated for
Service/Employee parking until it is ready to be serviced inside the new
body shop.
Department: Water -Wastewater Engineering
Contact: Shane Boyle, 970-221-6339, sbovle@fcaov.com
Topic: General
Comment Number: 1 Comment Originated: 01/30/2018
01/30/2018: Other service district (site specific comment):
This project site is located within the Fort Collins Loveland Water District and the
South Fort Collins Sanitation District for water and sewer service. Please contact
them at (970) 226-3104 for development requirements.
Response — Acknowledged — no water or sewer changes are proposed. We
have discussed the project with the District and they do not need to sign
the utility plans.
Comment Number: 2
Comment Originated: 01/30/2018
01/30/2018: Water conservation (standard comment):
The water conservation standards for landscape and irrigation will apply.
Information on these requirements can be found at:
http://www.fcgov.com/standards
Response — Acknowledged
Department: Zoning
Contact: Noah Beals, 970-416-2313, nbeals@fcaov.com
Topic: General
Comment Number: 1
Comment Originated: 02/06/2018
02/06/2018: This property has not been platted. It will need to platted to proceed
with a Minor Amendment.
Response — Please see Minor Amendment submittal
The plat can be reviewed through a Basic Development Review for a Minor
Subdivision.
Response — Please see Basic Development Review submittal
Page 10 of 10
Response — The project will not create more than 1,000 SF of impervious. A
letter is provided and grading is in the civil plans.
Comment Number: 6 Comment Originated: 01/30/2018
01/30/2018: Erosion control requirements (standard comment):
The erosion control report requirements are in Section 1.3.3, Volume 3, Chapter 7 of the
Fort Collins Stormwater Criteria Manual. If you need clarification concerning this section,
please contact the Erosion Control Inspector, Jesse Schlam at 224-6015 or
jschlam@fcgov.com.
Response — An Erosion Control Report will be submitted directly to Jesse.
01/30/2018: Fees (standard comment):
The 2017 city wide Stormwater development fee (PIF) is $8,217/acre for new
impervious area over 350 square feet and there is a $1,045/acre of site review fee.
No fee is charged for existing impervious area. These fees are to be paid at the
time each building permit is issued. Information on fees can be found at:
http://www.fcgov.com/uti I ities/business/builders-and-developers/plant-investment-de
velopment-fees or contact our Utility Fee and Rate Specialists at (970) 416-4252 for
questions on fees. There is also an erosion control escrow required before the
Development Construction permit is issued. The amount of the escrow is
determined by the design engineer, and is based on the site disturbance area, cost
of the measures, or a minimum amount in accordance with the Fort Collins
Stormwater Manual.
Response — Acknowledged
Department: Technical Services
Contact: Jeff County, 970-221-6588, icounty@fcgov.com
Topic: General
Comment Number: 1
Comment Originated: 01/25/2018
01/25/2018: As of January 1, 2015 all development plans are required to be on the
NAVD88 vertical datum. Please make your consultants aware of this, prior to any
surveying and/or design work.
Response — Acknowledged
Topic: Site Plan
Comment Number: 2
Comment Originated: 01/25/2018
01/25/2018: Will new plans be submitted & filed? The plan submitted for this PDR
no longer meets our requirements for note clarity & scanning quality.
Response — Yes new plans will be submitted
Department: Traffic Operation
Page 10 of 10
01/30/2018: Documentation requirements (site specific comment):
If there is an increase in imperviousness greater than 1,000 square feet a drainage
report, erosion control report and construction plans are required and they must be
prepared by a Professional Engineer registered in the State of Colorado. The drainage
report must address the four -step process for selecting structural BMPs. If the
increase in impervious area is greater than 350 square feet and less than 1,000
square feet, a drainage letter along with a grading and erosion control plan should be
sufficient to document the existing and proposed drainage patterns. A grading plan is
required if the increase in imperviousness is less than 350 square feet
Response — The project will not create more than 1,000 SF of impervious. A
letter is provided and grading is in the civil plans.
Comment Number: 3 Comment Originated: 01/30/2018
01/30/2018: Imperviousness documentation (site specific comment):
It is important to document the existing impervious area since drainage requirements
and fees are based on new impervious area. An exhibit showing the existing and
proposed impervious areas with a table summarizing the areas is required prior to the
time fees are calculated for each building permit.
Response — Documentation is in the drainage letter.
Comment Number: 4 Comment Originated: 01/30/2018
01/30/2018: Detention requirements (site specific comment):
When improvements are proposed to an existing developed site and there is an increase
in impervious area greater than 1000 square feet, onsite detention is required with a 2-
year historic release rate for water quantity. Parking lot detention for water quantity is
allowed as long as it is not deeper than one foot. If there is less than 1000 but more than
350 square feet of new impervious area, a site grading plan is required along with the
impervious area documentation.
Response — The project will not create more than 1,000 SF of impervious. A
letter is provided and grading is in the civil plans.
Comment Number: 5 Comment Originated: 01/30/2018
01/30/2018: Standard water quality requirements (standard comment):
When improvements are proposed to an existing developed site and there is an
increase in impervious area greater than 1000 square feet, any new or modified
impervious area is required to be treated using the standard water quality treatment as
described in the Fort Collins Stormwater Manual, Volume 3-Best Management
Practices (BMPs).
(http://www.fcgov.com/utilities/business/builders-and-developers/development-form s-
guidelines-regulations/stormwater-criteria) Extended detention is the usual method
selected for water quality treatment; however the use of any of the BMPs is
encouraged.
Page 10 of 10
Comment Number: 7
Comment Originated: 02/05/2018
Department: Stormwater Engineering
Contact: Jesse Schlam, 970-218-2932, ischlam@fcaov.com
Topic: Erosion Control
Comment Number: 1
Comment Originated: 01/29/2018
01/29/2018: The site disturbs more than 10,000 sq. ft. and therefore Erosion and
Sediment Control Materials need to be submitted. The erosion control requirements
are in the Stormwater Design Criteria under the Amendments of Volume 3 Chapter
7 Section 1.3.3. a copy of the erosion control requirements can be found at
www.fcgov.com/eroison. The Erosion Control Materials will need to be submitted at
time of the first round of FDP. If you need clarification concerning the Erosion
Control Material Requirements or Comments presented above please contact
myself. Jesse Schlam (970) 224-6015jschlam@fcgov.com
Response — An Erosion Control Report will be submitted directly to Jesse.
Contact: Shane Boyle, 970-221-6339, sbovle@fcoov.com
Topic: General
Comment Number: 7
Comment Originated: 02/05/2018
> The required turning radii of afire apparatus access road shall be a minimum of 25
feet inside and 50 feet outside. Turning radii shall be detailed on submitted plans.
> Be visible by red curb and/or signage, and maintained unobstructed at all times. Sign
locations or red curbing should be labeled and detailed on final plans. Refer to
LUCASS detail #1418 & #1419 for sign type, placement, and spacing. Appropriate
directional arrows required on all signs.
SECURITY GATES
If any security fences, such as those to the north west of the building, are planned
across the Fire Lane then those gates will be require an approved locking Key
Switch. Code language follows:
> IFC 503.6: The installation of security gates across a fire apparatus access road
shall be approved by the fire chief. Where security gates are installed, they shall
have an approved means of emergency operation. The security gates and the
emergency operation shall be maintained operational at all times.
Response — Acknowledged
Department: Planning Services
Contact: Pete, ,
Topic: General
Comment Number:
Comment Originated: 02/05/2018
We will need to clarify number of parking spaces removed with proposed building
addition and remaining or new spaces proposed to assess if additional parking is
required. For vehicle servicing and maintenance use, the parking standard is a
minimum of 2/1000 SF (max. 5/1000 SF) of gross leasable space. It appears some
of the servicing and or vehicle storage spaces will be further revised with new plan.
Based on information from the applicant at the PDR meeting, no additional parking
spaces are required.
Response — Acknowledged
Comment Number:
Comment Originated: 02/05/2018
Need to clarify location of the main building entrance on addition, and connection to
sidewalk system on site.
Response - Access to the new building will be from inside main building
and entrance on east side. This exterior entrance connects to the existing
sidewalk.
Comment Number:
Comment Originated: 02/05/2018
The landscape plan should include any changes to the existing site, parking and
building foundation planting areas. It is not clear on the proposed site plan, the
extent of landscaping revisions.
Response — A single tree was removed, an existing parking island was
extended to make up for the lost impervious material and new scrubs are
planned to match the existing island planting. No other landscaping
changes are proposed.
Comment Number: 7 Comment Originated: 02/05/2018
Contact: Andrew Rosen,, arosen@fcgov.com
Topic: General
ACCESS
UPDATE 02-07-2018
>The Project Team agreed at the Staff Review meeting that a Fire lane would be
dedicated along the west side of the existing building, continuing along the north
elevation of the proposed new building and extending along the east elevation of the
existing building to join the entrance at the south east edge of the property. The short
length of the drive aisle shown as 16ft on the provided plan at the south east corner of
the existing building will be considered appropriate for inclusion in the dedicated Fire
Lane if it can be shown as capable of supporting 40tons. The full extent of the 16ft drive
aisle should be dedicated as 20ft on the Emergency Access Easement
>Access from the north west corner of the property from the WalMart property does
not readily provide fire access coverage of the east elevation of the facility.
Dedicating a Fire Lane extension to this entrance from the proposed Fire Lane
around the existing and new building would be beneficial.
Fire access is required to within 150' of all exterior portions of any building, or facility as
measured by an approved drive route around the perimeter. This access can be
achieved by a Fire Lane which may already exist close to the location of the proposed
new addition but is not shown on the provided documents. If this Fire Lane does exist
then it can be extended to serve the proposed building or, if there is no dedicated Fire
Lane, one will have to be brought in from the entrance at College Ave and brought
around the building to the new Body Shop. This distance is greater than 660ft which
triggers the requirement for a second entrance. This requires continuing the Fire Lane
around the complete periphery of the existing and new structure. Code language
follows:
> IFC 503.1.1: Approved fire Lanes shall be provided for every facility, building or
portion of a building hereafter constructed or moved into or within the jurisdiction. The
fire apparatus access road shall comply with the requirements of this section and shall
extend to within 150 feet of all portions of the facility and all portions of the exterior
walls of the first story of the building as measured by an approved route around the
exterior of the building or facility.
Response — A 20' minimum fire lane is now proposed to be platted around the
perimeter of the building.
Comment Number: 2
Comment Originated: 02/05/2018
FIRE LANE SPECIFICATIONS
A fire lane plan shall be submitted for approval prior to installation. In addition to the
design criteria already contained in relevant standards and policies, any new fire lane
must meet the following general requirements:
> Shall be designated on the plat or by separate document as an Emergency
Access Easement.
> Maintain the required 20 foot minimum unobstructed width & 14 foot minimum
overhead clearance.
> Be designed as a flat, hard, all-weather driving surface capable of supporting 40
tons.
> Dead-end roads shall not exceed 660' in length without providing for a second
point of access.
> Dead-end fire access roads in excess of 150 feet in length shall be provided with an
approved area for turning around fire apparatus.
Comment Number: 7 Comment Originated: 02/05/2018
Contact: Molly Roche, , mroche@fcgov.com
Topic: Landscape Plans
Comment Number: 1 Comment Originated: 02/05/2018
02/05/2018:
There appears to be existing trees on -site. Please schedule an on -site meeting with
City Forestry (Molly Roche - mroche@fcgov.com) to obtain tree inventory and
mitigation information. Please confirm if trees will be impacted by building expansion
and construction activities.
Response — A single tree was removed, an existing parking island was
extended to make up for the lost impervious material and new scrubs are
planned to match the existing island planting. No other landscaping
changes are proposed.
Department: Light And Power
Contact: Rob Irish, 970-224-6167, rirish@fcoov.com
Topic: General
Comment Number: 1
Comment Originated: 02/02/2018
02/02/2018: Property is currently fed by a 500kva 3-phase transformer on the North
side of the building. Please field locate, and coordinate with Light & Power, if the
transformer or primary line will need to be relocated or if an increase in capacity is
anticipated.
Response — Acknowledged
Comment Number: 2
Comment Originated: 02/02/2018
02/02/2018: Any relocation or modification to existing electric facilities will be at the
expense of the owner/developer. If Light & Power's existing electric facilities are to
remain within the limits of the project they must be located within a utility easement.
Response — Acknowledged
Comment Number: 3
Comment Originated: 02/02/2018
02/02/2018: Certain building materials and or building design (door openings), may
require more clearance from the transformer. Please adhere to all clearance
requirements in the Electric Service Standards at the following link.
http://www.fcgov.com/util ities/business/builders-and-developers/development-forms
-guidelines-regulations
Response — Acknowledged
Comment Number: 4
Comment Originated: 02/02/2018
02/02/2018: Please contact Light & Power Engineering at 970-221-6700 or
ElectricProjectEngineering @fcgov.com for any anticipated change in the existing
electric service.
Electric Capacity Fee, Building Site charges and system modification charges may
apply to this development.
Response — Acknowledged
Department: PFA
Comment Number: 7 Comment Originated: 02/05/2018
irrigation plan, that: "...(4) protects significant trees, natural systems, and habitat,
and (5) enhances the pedestrian environment." Note that a significant tree is defined
as a tree having DBH (Diameter at Breast Height) of six inches or more. For trees
within this site having a DBH of greater than six inches, a review of the trees shall be
conducted with Ralph Zentz, Senior Urban Forester (970-221-6302 or
rzentz@fcgov.com) to determine the status of the existing trees and any mitigation
requirements that could result from the proposed development.
Response — Acknowledged
Comment Number: 3
Comment Originated: 02/05/2018
02/05/2018: City of Fort Collins Land Use Code [Section 3.2.1 (E)(3)], requires that
to the extent reasonably feasible, all plans be designed to incorporate water
conservation materials and techniques. This includes use of low -water -use plants
and grasses in landscaping or re -landscaping and reducing bluegrass lawns as
much as possible. Native plants and wildlife -friendly (ex: pollinators, butterflies,
songbirds) landscaping and maintenance are also encouraged. Please refer to the
Fort Collins Native Plants document available online and published by the City of
Fort Collins Natural Areas Department for guidance on native plants is:
http://www.fcgov.com/naturalareas/pdf/nativeplants20l3.pdf. Also see the City of
Fort Collins Plant List : https://www.fcgov.com/forestry/plant_list.pdf.
Response — Acknowledged
Topic: Lighting Plan
Comment Number: 4
Comment Originated: 02/05/2018
02/05/2018: In regard to outdoor lighting, especially LED light fixtures, cooler color
temperatures are harsher at night and cause more disruption to circadian
(biological) rhythms for both humans and wildlife. Warmer color temperature (warm
white, 3000K or less) for any LED light fixtures is preferred. Please also consider
fixtures with dimming capabilities so that light levels can be adjusted as needed. Site
light sources shall be fully shielded and down -directional to minimize up -light, light
spillage and glare [see LUC 3.2.4(D)(3)]. For further information regarding health
effects please see:
http://darksky.org/ama-report-affirms-h uman-health-impacts-from-leds/
Response — No new site lighting is proposed. The remainder of the site
lighting has recently been improved to LED.
Comment Number: 7
Comment Originated: 02/07/2018
Lighting rebates may be available to update all lighting for this commercial site. The
program is a collaboration between Fort Collins Utilities and Platte River Power
Authority. A 25 percent rebate bonus might be available on new LED fixtures for any
project pre -approved, completed and submitted for final payment by Nov. 15, 2018.
For more information visit:
https://www.fcgov.com/utilities/business/conserve/rebates-incentives/electric-efficie
ncy/lighting-efficiency
And/or contact John Phelan, Energy Services Manager, Fort Collins Utilities,
jphelan@fcgov.com, 970-416-2539
Please ask for 3000K or less corrected color temperature fixtures if this rebate
option is pursued. Thank you.
Response — Acknowledged
Department: Forestry
Comment Number: 7 Comment Originated: 02/05/2018
will need to find a location(s) on private property to accommodate any necessary
staging and/or parking needs associated with the completion of the Development.
Information on the location(s) of these areas will be required to be provided to the
City as a part of the Development Construction Permit application.
Response — Acknowledged
Department: Environmental Planning
Contact: Stephanie Blochowiak, 970-416-4290, sblochowiak@fcaov.com
Topic: General
Comment Number: 5
Comment Originated: 02/05/2018
02/05/2018: Our city has an established identity as a forward -thinking community
that cares about the quality of life it offers its citizens now and generations from
now. Thus, the City of Fort Collins has many sustainability programs and goals that
may benefit this project.
1) ClimateWise program: http://fcgov.com/climatewise, contact Heidi Wagner
at970-416-2230 orclimatewise@fcgov.com
2) Zero Waste Plan and the Waste Reduction and Recycling Assistance Program
(WRAP): http://fcgov.com/recycling/wrap.php, contact Jonathon Nagel at
970-416-2701 orjnagel@fcgov.com
3) Green Building Program: http://fcgov.com/greenbuilding contact Tony Raeker at
970-416-4238 ortraeker@fcgov.com
4) Solar Energy: www.fcgov.com/solar, contact Rhonda Gatzke at 970-416-2312 or
rgatzke@fcgov.com
5) Integrated Design Assistance Program: http://fcgov.com/idap, contact Gary
Schroeder at 970-224-6003 orgschroeder@fcgov.com
6) Bike Share Program: http://fcgov.com/bikeshare, contact Stacy Sebeczek at Bike
Fort Collins at stacy@bikefortcollins.org or970-481-5577
Response — Acknowledged
Topic: Landscape Plans
02/05/2018: Ensure any impacts to existing trees will be mitigated for in updated
landscape plans in addition to meeting parking lot tree stocking requirements. See
Land Use Code 3.2.1(D) Tree Planting Standards, 3.2.1(E)(4) Parking Lot Perimeter
Landscaping and 3.2.1(E)(5) Parking Lot Interior Landscaping standards (available
online). Contact City Forestry to determine if an onsite tree inventory visit will be
necessary. 970-221-6302
Response — A single tree was removed, an existing parking island was
extended to make up for the lost impervious material and new scrubs are
planned to match the existing island planting. No other landscaping
changes are proposed.
Comment Number: 2
Comment Originated: 02/05/2018
02/05/2018: Note LUC Section 3.2.1(C) requiring developments to submit a
landscape and tree protection plan, and if receiving water service from the City, an
Comment Number: 7 Comment Originated: 02/05/2018
access control plan. The access control plan will need to be followed and implemented
with any project. Plans will be routed to CDOT for review and approval and the applicant
may need to obtain access permits from CDOT. The existing head in parking is also
subject to CDOT review. It is possible CDOT may require this to be removed.
Response — See Response #1
Comment Number: 12
Comment Originated: 02/06/2018
LCUASS parking setbacks (Figure 19-6) apply and will need to be followed
depending on parking design.
Response — no parking changes near the driveway are proposed.
Comment Number: 13 Comment Originated: 02/06/2018
All fences, barriers, posts or other encroachments within the public right-of-way are
only permitted upon approval of an encroachment permit. Applications for
encroachment permits shall be made to Engineering Department for review and
approval prior to installation. Encroachment items shall not be shown on the site plan
as they may not be approved, need to be modified or moved, or if the permit is revoked
then the site/ landscape plan is in non-compliance.
Response — with the proposed 57' ROW dedication, there are no encroachment
items — only public sidewalk and street trees.
The development/ site cannot use the right-of-way for any rain gardens to treat the
storm runoff. We can look at the use of rain gardens to treat street flows — the
design standards for these are still in development
Response — Acknowledged
Comment Number: 15 Comment Originated: 02/06/2018
Doors are not allowed to open out into the right-of-way.
Response — Acknowledged
Comment Number: 16
Comment Originated: 02/06/2018
Bike parking required for the project cannot be placed within the right-of-way and if
placed just behind the right-of-way need to be placed so that when bikes are parked
they do not extend into the right-of-way.
Response — Acknowledged
Comment Number: 17
Comment Originated: 02/06/2018
In regards to construction of this site, the public right-of-way shall not be used for
staging or storage of materials or equipment associated with the Development, nor
shall it be used for parking by any contractors, subcontractors, or other personnel
working for or hired by the Developer to construct the Development. The Developer
Comment Number: 7 Comment Originated: 02/05/2018
Response — Acknowledged — see horizontal control plan
Comment Number: 6 Comment Originated: 02/06/2018
All public sidewalk, driveways and ramps existing or proposed adjacent or within the site
need to meet ADA standards, if they currently do not, they will need to be reconstructed
so that they do meet current ADA standards as a part of this project.
Response — We would like to meet with the Staff regarding the existing driveway.
The sidewalk does not go any further south, so upgrading at this time may not be
wise. On a recent project with a similar driveway, the City inspector did not require
adding domes, so the ramp as it exists is probably adequate.
Comment Number: 7 Comment Originated: 02/06/2018
Any public improvements must be designed and built in accordance with the
Larimer County Urban Area Street Standards (LCUASS). Payment in lieu for the
construction of Prospect Road may be accepted for the required public street
improvements. The Larimer County Urban Area Street Standards are available
online at:
https://www.larimer.org/engineering/standards-and-guides/urban-area-street-standa rds
Response — Acknowledged
Comment Number: 8
Comment Originated: 02/06/2018
This project is responsible for dedicating any right-of-way and easements that are
necessary or required by the City for this project. This shall including the standard
utility easements that are to be provided behind the right-of-way (15 foot along an
arterial, 8 foot along an alley, and 9 foot along all other street classifications). No
easements could be found on this property in the country recorders files. The
following easements will need to be dedicated on the plat or separate document.
Information on the dedication process can be found at:
http://www.fcgov.com/engineering/devrev.php
Response — See response #1
Comment Number: 9
Comment Originated: 02/06/2018
Utility plans will be required and if needed a Development Agreement will be
recorded once the project is finalized.
Response — Acknowledged
Comment Number: 10
Comment Originated: 02/06/2018
As of January 1, 2015 all development plans are required to be on the NAVD88
vertical datum. Please make your consultants aware of this, prior to any surveying
and/or design work.
Response — Acknowledged
Comment Number: 11 Comment Originated: 02/06/2018
This site is adjacent to CDOT roadway and all access to the site is governed by an
Comment Number: 7 Comment Originated: 02/05/2018
Response — We have worked through the US 287 needs with
the City and CDOT — Morgan would have an email dated 3-7-
18. The plat proposes the following (based on centerline of
existing road / section line):
57' ROW dedication (which will contain the existing public
sidewalk)
15' Access, Utility and Drainage easement behind new ROW —
the back of this easement would be the 72' half roadway from
the CDOT EOS and would allow the walk to be moved west in
the future
15' (min) Utility and Drainage easement behind the access
easement
Comment Number: 2
02/06/2018
Comment Originated:
There is a driveway stub at the south transit center that can be
connected to with this parcel. The US 287 EOS shows a median
ultimately in this location of College Ave which will restrict the
movements from the current driveway to right in right out.
Connecting to the South Transit Center will allow for the parcel to
utilize the signal at W Fairway Lane. If a driveway connection is not
wanted, a sidewalk connection would be ideal.
Response — The owner would prefer not to connect this drive or
a sidewalk at this location.
Comment Number: 3
02/06/2018
Comment Originated:
Larimer County Road Impact Fees and Transportation Expansion
Fees are due at the time of building permit. Please contact Kyle
Lambrecht at 221-6566 if you have any questions.
Response — Acknowledged
Comment Number: 4
02/06/2018
Comment Originated:
The City's Transportation Development Review Fee (TDRF) is
due at the time of submittal. For additional information on these
fees, please see: http://www.fcgov.com/engineering/dev-
review.php
Response — Acknowledged
Any damaged curb, gutter and sidewalk existing prior to construction, as well as streets,
sidewalks, curbs and gutters, destroyed, damaged or removed due to construction of this
project, shall be replaced or restored to City of Fort Collins standards at the Developer's
expense prior to the acceptance of completed improvements and/or prior to the issuance
of the first Certificate of Occupancy.
Comment Number: 7
Comment Originated: 02/05/2018
City of
Fort Collins
February 09, 2018
Kris Lee
Kenny Lee
Architecture
Group 209 E
4th St
Loveland, CO 80537
Communi
ty
Developm
ent and
Neighbor
hood
Services
281
North
Colle
ge
Aven
ue
PO
Box
580
Fort Collins,
CO 80522
970.221.6750
970.224.6134 - fax
lcgov. com/developmentreview
RE: Spradley Barr Ford - 4809 S College, PDR180002, Round Number
Please see the following summary of comments from City staff and outside reviewing
agencies for your submittal of the above referenced project. If you have questions
about any comments, you may contact the individual commenter or direct your
questions through the Project Planner, Pete Wray, at 970-221-6754 or
pwray@fcgov.com.
Department: Engineering Development Review
Contact: Morgan Uhlman, 970-416-4344,
muhlman@fcoov.com Topic: General
Comment Number: 1
02/06/2018
Comment Originated:
Right-of-way will need to be dedicated to accommodate the future
expansion of College Ave. CDOT will need to be part of the
discussion to how much right-of-way will be need to be dedicated
for the ultimate cross section. Our current contact for CDOT is Tim
Bilobran, 970-350-2163, timothy.bilobran@state.co.us .The US 287
Loveland to Fort Collins Environmental Overview Study for this
section of roadway indicates that the needed right-of-way would
encroach into the existing retaining walls behind the sidewalk. Here
is a link to the study
https://www.codot.gov/library/studies/US287EOS