23. The Harmony Corridor Design Guidelines require the clumping or
massing of certain types of plant material within the 80 foot
buffer.
24. The building foundation along Harmony Road should be planted
with foundation shrubs to mitigate a potential 20 foot high block
wall.
25. The southerly elevation should be articulated or enhanced to
create a more attractive building and comply with the Harmony
Corridor Design Guidelines.
26. All rooftop mechancial equipment should be totally screened
from the public streets.
27. Parking lot and building security lighting should be down
directional with sharp cut-off luminaires.
28. It is recommended that should the decision be made to proceed,
a pre -submittal conference with the Planning Department be arranged
to discuss the documents that need to prepared for a complete
submittal.
impact analysis. This study will investigate the impact on the
street system, the adjacent intersections, and trip distribution.
The traffic study must be prepared by a professional engineer. For
further information, please contact Eric Bracke, Transportation
Engineer, 221-6608. Also, detailed information is provided in
Chapter 7.14 of the Development Manual. The Planning Department
has a list of traffic engineering consultants who are familiar with
the scope of a traffic study in Fort Collins.
14. The development of this site will require the construction of
a sidewalk along both public streets, if not already constructed.
The sidewalk on Harmony Road will be eight feet wide. The
developer is responsible for four feet of this width while the
City's Street Oversizing Fund will reimburse for the remaining four
feet. The sidewalk on Innovation Drive is required to be four feet
wide with the developer responsible for the total width.
15. The City Engineering Department will work with Public Service
Company on connecting the sidewalk to the east.
16. The sidewalk on Harmony Road is allowed to gently meander in
accordance with the Harmony Corridor Design Guidelines. A copy of
these guidelines are -available at the Planning Department. If the
sidewalk meanders outside of the dedicated right-of-way, then an
access easement can be dedicated accordingly. The City has a
standard form for accepting such dedications.
17. The lot is already platted. At the time the plat was
approved, a six foot wide utility easement along Innovation Drive
was the standard. At this time, however, the utility providers
need nine feet in order to accommodate both sidewalk and utilities.
Therefore, an extra three feet will need to be dedicated. The
Planning Department has standard forms that can be used to dedicate
additional property for purposes of utility easements, without
creating the need to do a replat. Please contact Mike Herzig, 221-
6750.
18. construction of the necessary sidewalks must be designed.
This design can become part of the Drainage and Grading Plan and
can include standard City details.
19. The 80.foot landscape buffer along Harmony Road*is measured
from the future edge of pavement.
20. The I-P Site Plan Review requires a landscape plan, which can
be combined on the same sheet as the site plan. The architectural
sheet should be separate.
21. The landscape details should include what is existing on the
site that will be preserved. Also, please indicate if any existing
trees are to be relocated.
22. Landscaping and or berming should be provided along Innovation
to screen headlights in the parking lot.
5.' It is a requirement of the Zoning Code that the setback on the
north property line be 30 feet. Your request for a 10 foot setback
will require a variance of 20 feet. Please coordinate with Peter
Barnes, Zoning Administrator, 221-6760, regarding scheduling a
hearing date with the Zoning Board of Appeals. If the variance is
granted, the Site Plan should refer to the variance and the date
the variance was granted.
6. If the variance on the north property line is granted, then
the City's Building Inspection Division will require that the
exterior wall along that property line be rated as a one -hour fire
wall. For further information, please contact Plans Examiner,
Sharon Getz, 221-6760.
7. The Poudre Fire Authority will require that the plans for the
automatic fire extinguishing- system be submitted to the Fire
Marshal, Mike Pretz, for review.
8. The site is located in the Fox Meadows Drainage Basin. The
stormwater development fee in this basin is $4,891 per acre,
subject to the runoff coefficient and the amount of stormwater
detention.
9. As part of the submittal for an I-P Site Plan Review, the
Stormwater Utility Department will require a Drainage Report,
Drainage and Grading Plan, and Erosion Control Plan. For
information on the submittal requirements, please contact Glen
Schlueter, Stormwater Engineer, 221-6589. Information is also
available in Chapter 7.19 of the Development Manual.
10. The stormwater outfall for the site is the Golden Meadows
regional detention pond. This pond is located next to the railroad
tracks on the eastern edge of Golden Meadows neighborhood park.
The.subject site will be required to convey storm flows to this
pond. Stormwater detention will be required on site if the 100-
year storm flows, under fully developed conditions, cannot be.
conveyed to the regional detention pond. If the conveyance
channels to the regional pond cannot handle the storm flows, then
the parking lot area on the subject site should be used to detain
flows and release at the two-year historic rate. Some drainage
from the site will be allowed to be conveyed to the street.
11. Development of the site will not be allowed to proceed until
the Drainage Report and Drainage and Grading Plan, and Erosion
Control Plan are in final form and approved by the City.
12. The site will be assessed a Street Oversizing Fee. For
background information on this fee, please refer to Chapters 7.18
and 8.1 of the Development Manual. For an estimate of what this
fee will be, please contact the City Engineering Department, 221-
6605.
13. The City's Transportation Department will require a traffic
CONCEPTUAL REVIEW STAFF COMMENTS
MEETING DATE: December 27, 1993
ITEM: Colotex Electric on Lot it of Golden Meadows
Business Park
APPLICANT: Colotex Electric c/o Mr. Bob Bjerge, Mountain and
Plains Constructors, 1708 East Lincoln, Fort
Collins, CO. 80524.
LAND USE DATA: Request for a 11,175 square foot building for
electrical wholesale supply (20% office, 80% warehouse) on Lot it
of Golden Meadows Business Park. Lot is 45,360 square feet located
at the northeast corner.of Harmony Road and Innovation Drive.
COMMENTS:
1. Electrical power is available at the lot corner. The
developer's electrical contractor should complete the "C-1" form to
determine entrance capacity and size the transformer. Normal
development charges will apply. The location of the transformer
should be coordinated with Light and Power. The transformer should
be screened from. public streets by an enclosure meeting the
specifications of Light and Power, or by landscaping. One side of
the transformer must be accessible (within ten feet) by hard
surface in case of emergency change out. If you have any
questions, please call Kevin Westhuis, 221-6700.
2. Existing water and sewer services are stubbed in off
Innovation Drive towards the north half of the lot. It will be the
developer's obligation to verify the tap sizes to see if they are
sufficient to serve the property and the proposed use. If you have
any questions regarding water and sewer services, please call Mark
Taylor, 221-6681.
3. There is a long range plan to install a 36 inch diameter water
main along Harmony Road -within the 80 foot landscape, utility, and
drainage easement.
4. The zoning of the property is I-P, Industrial Park. This will
require that the property develop according to the criteria of the
Zoning Code and be reviewed administratively by the Planning
Director as an I-P Site Plan Review. The submittal requirements
for an I-P Site Plan Review are in the Development Manual.
COMMUNITY PLANNING &
ENVIRONMENTAL SERVICES 281 NORTH COLLEGE P.O.BOX 580 FORT COLLINS, COLORADO 80522-0580 (303)221.6750
PLANNING DEPARTMENT
Community Planning and Environmental Services
Planning Department
City of Fort Collins
r,
December 28, 1993
Mr. Bob Bjerge
Mountain and Plains
1708 East Lincoln
Constructors, Inc.
Fort Collins, CO 80524
Dear Bob:
For your .information, attached is a copy of the Staff's comments
concerning your request for a 11,175 square foot building for
electrical wholesale supply office and warehouse located at the
northeast corner of Harmony Road and Innovation Drive which was
presented before the Conceptual Review Team on December 27, 1993.
The comments are offered informally by Staff to assist you in
preparing the detailed components of the project application.
Modifications or additions to these comments may be made at the
time of formal review of this project.
If you should have any questions regarding these comments or the
next steps in the review process, please feel free to call me at
221-6750.
Sincerely,
Ted Shepard
Project Planner
CC. Planning Director
Kerrie Ashbeck, Civil Engineer
.Transportation Department
Project Planner
File