Loading...
HomeMy WebLinkAboutLINDENMEIER ESTATES PUD - PRELIMINARY - 24-94 - SUBMITTAL DOCUMENTS - ROUND 1 - GEOTECHNICAL (SOILS) REPORTNo Text r l 1 � 1 1 1 1 1 1 1 1 1 1 1 1 1 1 Boring No. Depth 1 3.0 3 3.0 5 3.0 8 3.0 9 3.0 14 3.0 15 3.0 17 3.0 21 3.0 SU14 ARY OF TEST RESULTS % Moisture Before Test 18.5 5.6 5.3 9.6 17.3 15.7 18.3 19.9 15.4 Dry Density P.C.F. 105.3 98.9 107.5 97.5 100.8 123.5 109.7 114.6 108.2 Swelling Pressure PSF 1,975 215 315 660 505 1,420 390 1,450 1,200 SUMMARY OF TEST RESULTS BORING NO. DEPTH FT. % MOISTURE DRY DENSITY P.C.F. UNCONFINED COMPRESSIVE: STRENGTH-P.S.F. WATER SOLUBLE SULFATES-% PENETRATION BLOWS/INCHES 17 3.0-4.0 19.9 24/12 7.0-8.0 17.4 46/12 14.0-15.0 18.8 48/12 18 3.0-4.0 14.6 8/12 7.0-8.0 30.4 50/11 14.0-14.3 13.9 42/3 19 3.0-4.0 21.4 103.8 800 4.0-5.0 5/12 7.0-8.0 27.1 9/12 14.0-15.0 18.7 47/12 20 3.0-4.0 26.4 4/12 7.0-8.0 21.3 7/12 14.0-15.0 22.1 50/12 21 3.0-4.0 15.4 49/12 7.0-7.5 15.4 39/6 14.0-14.9 16.7 50/1W EMPIRE LABORATORIES, INC.-_L.._-____...__ _ SUMMARY OF TEST RESULTS BORING NO. DEPTH FT. % MOISTURE DRY DENSITY P.C.F. UNCONFINED COMPRESSIVE STRENGTH-P.S.F. WATER SOLUBLE SULFATES-% PENETRATION _ BLOWS/INCHES 9 3.0-4.0 17.3 12/12 7.0-8.0 5.6 12/12 14.0-14.2 17.5 50/2 10 3.0-4.0 2/1-2 7.0-8.0 28.5 4/12 14.0-14.3 14.3 50/4 11 3.0-4.0 25.0 4.0-5.0 2/12 7.0-8.0 23.7 10/12 14.0-14.5 15.8 50/5 12 3.0-4.0 9.8 9/12 7.0-8.0 14.2 12/12 14.0-14.3 22/3 13 3.0-4.0 11.2 13/12 7.0-8.0 13.9 10/12 14.0-14.5 31/12. 14 3.0-4.0 15.7 113.5 11,530 4.0-5.0 17/12 7.0-8.0 13.3 8/12 1.4.0-14.5 50/52 15 3.0-4.0 18.3 109.7 31200 4.0-5.0 29/12 7.0-8.0 16.7 50/12 14.0-14.5 15.8 42/6 16 3.0-4.0 27.3 7/12 7.0-8.0 22.2 10/12 14.0-15.0 21.0 19/12 EMPIRE LABORATORIES, INC. - . y - f n SUMMARY OF TEST RESULTS Y. BORING NO. DEPTH FT. % MOISTURE DRY DENSITY P.C.F. UNCONFINED COMPRESSIVE STRENGTH-P.S.F. WATER SOLUBLE SULFATES-% PENETRATION BLOWS/II4CHES 1 3.0-4.0 18.5 108.4 14,290 4.0-5.0 15/12 7.0-8.0 26.8 20/12 14.0-14.5 16.6 50/5 2 3.0-4.0 14.7 8/12 7.0-8.0 50/12 14.0-15.0 45/12 3 3.0-4.0 5.6 12/12 7.0-7.9 50/9 14.0-15.0 38/12 4 3.0-4.0 6.4 17/12 7.0-8.0 14/12 14.0-15.0 26/12 5 3.0-4.0 5.3 113.5 71065 4.0-5.0, 23/12 7.0-8.0 15/12 14.0-15.0 29/12 6 3.0-4.0 5.5 13/12 7.0-8.0 18.4 10/12 14.0-15.0 25/12 7 3.0-4.0 11.7 10/12 7.0-8.0 13/12 14.0-15.0 44/12 8 3.0-4.0 9.6 14/12 7.0-8.0 37/12 14.0-14.8 5.0/9. _-- _-, - -- EMPIRE L&MRATORILS, INC. _--- ----------- --------- --------------- ' LOG OF BORINGS 1 ELEVAT/ON A0. 4980 1 t 4975 ' 4970 4965 o ■ �wr m m m WA m m o m m m -14- LOG OF BORINGS FLEVAT/ON a I6 o• 17 No. 4985 4980 4975 4970 4965 `- 4)G5 4955 -13 -- .r 497`_ 497( 496! 496 495 LOG OF BORINGS 471 i 2 90/12 .. 71 13/12 i / 17 12 �. 4 2 6 10 12 ' 8 12 o, p O v p•e- • o �O v o.� ey•. m 50 5 i -12- LOG OF BORINGS ELEVAT/ON No.10 NO. if No.l 4970 4965 496C 495` / i. 2/12 ,. , 10 12 / 9/12 / 22 34/12 4950 -11- I , II I 1 LOG OF BORINGS ELEVAVON No. No.8 a.9 4965 4960 4955 4950 WA .'A w WA OVA OVA MAP 50/2 -10- CAAMOC i AOl DDT/ DICC fklr LOG OF BORINGS El- EVAT(ON 496E r...D 495E 495( ®e Nip SWARM w ®d_�� LOG OF BORINGS EL EVA T/ON NO• % 0• Z No. 3 4965 496C 495_ 4950 AM ® FILL SILT CLAYEY SILT i SANDY SILT z CLAY zSILTY CLAY ZJ SANDY CLAY SAND LiSILTY SAND CLAYEY SAND a KEY TO BORING LOGS p 6 n aA GRAVEL A. n •a -SAND & GRAVEL SILTY SAND & GRAVEL a COBBLES o �• SAND, GRAVEL & COBBLES ® WEATHERED BEDROCK SILTSTONE BEDROCK ® CLAYSTONE BEDROCK SANDSTONE BEDROCK ® LIMESTONE a SHELBY TUBE SAMPLE STANDARD PENETRATION DRIVE SAMPLER WATER TABLE 24 HOURS AFTER DRILLING 5/12 indicates that 5 blows of a 140 pound hemmer falling 30 Inches was required to penetrate 12 Inch". —7— TEST BORING LOCATION PLAN SCALE /t= SOO wELO CANAL % A I�^E% No. 20 Na 21 I � 1, � J�- No. IB Na. /7 No. /G 'No.10 Na. 11 No. 12 No. 13 No. / Na /4 ; .,. ' •.MARSH AREA No. 8 No. 7 No. G A%.-1-- No. 2 No. 3 No. 4 No. 5 1%EN07-,C9 %E5T BORING • UENO7E5 CA6.rR TEST 90RIIV6; AREA I A REA 11 a I i I! 1 1 7 [1 I 1 LI all slabs on grade in this area be placed directly on the undis- turbed soil which has been slightly wetter: down prior to place- ment of any concrete. All slah.s on grade should be structurally independent of bearing memiers and should be reinforced with reinforcing running through the construction joints. All slabs cn grade in Area II should be underlain_ by a minimum of four (4) inches of gravel or crushed rock devoi3 of fines. Fill material supporting slats on grade should be a non -expansive, granular -type material compacted at optimum moisture to at least ninety percent ("40€) of Standard Proctor Censity (-"S'TM CG96-70). Pond r.rea and Lrainage It is our understanding that a ponce is to be constructed in t:.e Soutnwest corner of t e site in tile area of the existing rarsh. Due to the relatively ir--pervious nature of the clay soil, the absence of cravel under the clav and the abundance of ground- r:ater in the area, it is felt that the proposed pond constructici is feasible. It should be noted that impounding hater in this area may change the gravel aquifer characteristics Fast of the pond location. In doing this, eater levels may tend to rise in the Eastern Porticr of tl- site. "o lce.•er the water table in. the Northern and .tiort iwestern portion of the site and: to control seepage along the Scut'_i .base of the Larimer anc Weld Canal, it is suggested that a suh-drain he installed at the site. The drain should be rlaced Lelow the existing canal from an area fast of Boring No. Z,0 Vest to the West property line. The suhdrain_ should then be placed along tine Nest property ling Southward ane empty into tie proposed pond. GENEVAL Coy*FENTs It should be noted that this was a preliminary investiga- tion and the Learirg caracities recemmend.cd in this report are rased on preliminary tests.. Due to variations in soil and groundwater conditions and swelling pressures encountered at the site, it is strongly recormended that additional test borings be made prior to construction. Samples obtained from these test Lorings should be suhiected to testing and inspection in the laboratory to prcvide a sound basis for deterrr.inina the physical properties anal bearing capacities of the soils encountered. 1 -5- 7 L 1 1 [1 1 load plus maximum live load). To counteract swelling pressures, which will develop if the dry subsoils inArea I become wetted, all footings, pads and grade beams should be designed for mini- mum dead loads of five hundred pounds (500`) to twent-y-five hun- dred pounds (2,5006) per square foot. Area II In view of the soil conditions encountered in this part of the site, it is recommended that the substructures be supported by conventional -type, continuous spread footings. All footings should be founded on the original undisturbed soil a minimum of thirty (30) inches below finished grade for frost protection. Footings at the above level may be designed for maximum allow- able bearing capacities of one thousand pounds (1,0001) to fif- teen hundred pounds (1,5001) per square foot (dead load plus maximura live load) . A feasible foundation alternate would be a drilled pier foundation system. It is recommended that all piers be straight shaft and that they be drilled a minimum of two (2) feet into the firm bedrock stratiLm. Piers at this level may be designed for maximum end bearing pressure of fifteen thousand pounds (15,000#) to forty thousand pounds (40,000?) per square foot. To counteract swelling pressures, all piers should be desianed for minimum dead loads of two thousand pounds (2,000*) to_-sevent� five hundred pounds (7,500f) per square foot. In. areas wb ere the firm bedroc% stratum is encountered, close to the surface, the substructures may be supported by a pad and grade beam foundation system. Pads founded on the bedrock stratum nay be designed for maximum allowable bearing capacities of ten thousand pounds (10,000t) to fifteen thousand pounds (15,000-�) per square foot (dead load plus maximum live load). To counteract swelling pres- sures, all pads and grade beams should be designed for minimum dead loads of two thousand pounds (2,000#) to five thousand pounds (5,000$) per square foot. It is important that a four (4) inch minimum void be provided under all grade beams. Basements Basement construction is feasible over most of Area I pro- viding the finished basement floor slabs are placed a minimum of two (2) feet above maximum seasonal groundwater elevations. Due to the extremely high groundwater elevations encountered in Bor- ings No. 1 and lb in Pxea I and in all of Area II, it is felt that basement construction is not feasi'hle in these areas. Groundwater elevations are such in Borings No. 2, 9, 17 and 18, that basement construction may or may not be feasible depending upon seasonal fluctuations. Therefore, it is recommended that garden -level construction be considered in lieu of basements in these areas. Slabs on Grade Due to the expansive nature of the subsoils in Pxea I, it is felt that floating slabs are feasible. It is recommended that and gravels at depths of three to twelve and one-half feet below the surface in Borings No. 1, 9 through 11, and 15 through 21 and ex- ' tends to greater depths. The upper one-half to four feet of the bedrock is highly weath- ered; however, t'.e underlying bedrock is firm and dense and exhibits very high bearing char- ' acteristics. Like the upper clays, the drier siltstone and clayatone bedrock exhibits low to moderate swelling potentials wren wetted. ' (C) Groundwater: At the time of the investigation, free groundwater was encountered at depths of ' zero to fourteen feet below tl:e surface. No free groundwater was encountered to depths of � fifteen feet below tl:e surface in Borings No. 15 and 21. water levels in this area are sub- ' ject to change depending upon seasonal varia- tions and irrigational flows on and adjacent to the site. Five test borings at the site i ' were cased to ol�serve these seasonal fiucua- j tions . tPECM1,M NDATI0NS Alib DISCi'SSI! iJ ' Foundation It is our understanding that the proposes' structures are to consist of apartments, townhouses and single-family residences. 1 bue to differences in the physical properties of the soils encountered at the site, the area will be divided into two, Parts in this report for the purpose of determining foundation types and bearing values of the soils encountered. Area II is that portion of the site which has high groundwater and generally ' non-ex�,:ansive soils. these areas are located in the Marsh area at the Southwest corner of the site, and below the Larimer and Weld Canal in the North Central portion of the site. Area I constitutes the remainder of the site (See Test Boring Location, Plan). Area I ' In view of the tyke of structures proposed and the soil con- ditions encountered in e,.rea I, it is recommended that the sub- structures in this area be supported by conventional -type, con- tinuous spread footings, continuous grade beams.and/or a pad and grade bean foundation system. All footings, grade beards and pads should be founded on the original undisturbed soil a minimum of thirty (30) inches below finished grade for frost protection. Bearing values bases: upon the preliminary investigation for the upper soils in .'sea I vary from:. twenty-five hundred pounds ' (2,500$) to six thousand pounds (6,0001) per square foot (dead ' -3-- SOIL AND GROUNDWATER CONDITIO14S The soil profile at the site consists of strata of mater- ials arranged in different combinations. In order of increasing depths, they are as follows: (1) Silty Topsoil: The entire site is overlain by a one-half to one -foot layer of silty topsoil. The upper six inches of the topsoil have been penetrated by plant roots and organic natter and should not be used as a bearing soil or backfill material. Four feet of wet, organic, clay fill is located in Boring No. 20. This material is not suitable as a bearing soil or as backfill material. (2) Silty Clay: This stratum underlies the top- 1 fill in Borings No. 1, 9, 10, 11, 14, 15, 17, 19, 20 and 21 at depths of three to thirteen feet below the %urface. The brown, silty clays are lUghly plastic and have varying moisture contents. in their near sat- urated state, the silty clays exhibit low :,earing characteristics and consolidate readily upon. loadinq. The drier silty clays exhibit generally moderate bearing caracteristics, and upon wetting, these clays exhibit moderate swelling potentials. (3) Sandy, Silty Clay: A layer of brown., sandy, silty clay underlies the topsoil in the -area of Borings No. 2_ through 8, 12, 13, 15, and 18 and extends to depths of five to twelve and one-half feet below the surface. The sandy clays are slightly plastic, contain varying amounts of fine sand and exhibit generally moderate bearing.characteristics in their dry to moist natural state. When wetted, the drier sandy silty clays exhibit slight to moderate swelling potentials. (4) Sand;. Gravel and Cobbles_ The gravel stratum underlies the upper clays in the Southern part of the site in Borings No. 1 through 9 and 12 through 14 and extends to depths of nine to greater than fifteen feet below the surface. The gravels are poorly graded, clean and exhi- bit moderate to high bearing characteristics in their medium dense to dense natural state. It is estimated that the cobbles, scattered through- out the gravel stratum, vary in size up to twelve inches in diameter. (5) Claystone, Siltstone and Sandstone (Bedrock): The bedrock stratum un erliesthe upper clays -2- 11 11 L! 1 i 11 1 SCOPE REPORT OF A PRELIMINARY SOILS ALAI*, FOUNDATION INVESTIGATION This report presents the results of a Preliminary Soils and Foundation Investigation prepared for the proposed unit develcp- ment located on Lindenmeier Road, Northeast of Fort Collins, Colorado. The investigation was carried out by means of test borings and laboratory testing of samples obtained from these borings. The primary objective of this investigation was to dote the suitability of the site for construction purposes. SITE INVESTIGATION The field investigations, carried out en June 21, 22 and 23, 1972, consisted of drilling, logging, and sampling twenty- one test borings. The locations of the test borings are shown on the Test Boring Location Plan included on page 6 of this re- port. Boring logs prepared from the field logs are shown on pages 6 through 14. These logs show soils encountered, locati of sampling, and groundwater at the time of the investigation. All borings were advanced with a four -inch diameter, continuous -type, power -flight auger drill. During the drilling operations, a field engineer from -Empire Laboratories, Inc., was present and made a continuous visual inspection of the soils encountered. SITE LOCATION AND DESCRIPTION The proposed site is located on Lindenmeier Road, Northeast of Pori: Collins, Colorado. tore particularly, the site is des- cribed as a tract of land situate in the Southeast 1/4 of Section 36, Township B North, Range 69 West, and the Borth 1/2 of the Northeast 1/4 of Section 1, Township 7 North, Range 69 West of the 6th P.M., Larimer County, Colorado. The majority of the site is relatively flat and has minor drainage to the Southwest. The North edge of the site slopes to the Southeast and Southwest from the Larimer and Weld Canal, which forms the Northern portion of the site. The majority of the site is under vegetation and several residences and a,it buildings are located in the Northeastern corner of the site. A large marsh is located in the Southwest corner of the area. -� 11 ' �PSOR4TO � W � T N 1 Empire Laboratories, Inc. Materials and Foundation Engineers duZy SB, 1972 Don Pavel Land Company Suite 420 Savings Building Fort COllins, Colorado 20521 Dear ^.'r. Pavel: We are pleased to submit our Peport of a PrraZininary Soils and Pcundation Investigation prepared for the proposed planned ree- idental development located Northeast of Fort Collins, Colorado, as requested. Based upon our findings in the subsurface, we feel that the site is suitable for the proposed construction. The accompany - inn report presents our findings in the subsurface and our recor,mendatione based upon the preliminary findings. Very truly yours, E'Pl nib' LABDRd CP._TES, INC. /Je Cf�O do Neil R. Shkarrod Engineering Ceolcgist rro _Reviewed by: I f Chester C. Smith, P.E. Vice President Pt0157EREQ aD d 1 V * H 4808 O. 5 \�T�'YGINEER t'��Cw�O� OFFICE AND LABORATORY-214 NORTH HOWES 0 P.O. SOX 149 _ FORT COT T INS, COLORADO M21 0 TELEPHONE ARZA 303/4844359 TABLE OF CONTENTS Table of Contents .................................. Letter of Transmittal .............................. Report ............................................. Test Boring Location Plan .......................... Key to Borings ..................................... Log of Borings ..................................... Summary of Test Results ............................ -i- REPORT OF A PRELIMINARY ' SOILS AND FOUNDATIO24 INVESTIGATION Fcn DON PAV= LAND COMPANY ' FORT COLLINS, COLORADO 1 1 1 1 PROJECT NO. 1192-72 BY EMPIRE LABORATORILS, INC. 214 NORTH IIOWES STREET FORT COLLINS, COLORADO fi�521 M O I S T U R E- DENS ITY DETERMINATION Samples of representative fill materials to be placed shall be fur- nished by the contractor to• the soils engineer for determination of maximum density and optimum moisture or percent of Relative Density for these materials. Tests for this determination will be made using methods conforming to requirements of ASTM D 698, ASTM D 1557, or ASTM D 2049. Copies of the results of these tests will be furnished to the contractor. These test results shall be the basis of control for all compaction effort. D E N S I T Y T E S T S The density and moisture content of each layer of compacted fill will be determined by the soils engineer in accordance with ASTM D 1556, ASTM D 2167, or ASTM D 2922. Any material found not to comply with the minimum specified density shall be recompacted until the required density is obtained. The results of all density tests will be furnished to both the owner and the contractor by the soils engineer. P L A C I N G F I L L No sod, brush, frozen material, or other unsuitable material shall be placed in the fill. Distribution of material in the fill shall be such as to preclude the formation of lenses of material differing from the surrounding material. The materials shall be delivered to and spread on the fill surface in a manner which will result in a uniformly com- pacted fill. Prior to compacting, each layer shall have a maximum thickness of eight inches, and its upper surface shall be approximately horizontal. M O I S T U R E C 0 N T R 0 L While being compacted, the fill material in each layer shall as nearly as practical contain the amount of moisture required for optimum com- paction or as specified, and the moisture shall be uniform throughout the fill. The contractor may be required to add necessary moisture to the fill material and to uniformly mix the water with the fill material if, in the opinion of the soils engineer, it is not possible to obtain uniform moisture content by adding water on the fill surface. If, in the opinion of the soils engineer, the material proposed for use in the compacted fill is too wet to permit adequate compaction, it shall be dried in an acceptable manner prior to placement and compaction. C O M P A C T I O N When an acceptable, uniform moisture content is obtained, each layer shall be compacted by a method acceptable to the soils engineer and as specified in the foregoing report as determined by applicable standards. Compaction shall be performed by rolling with approved tamping rollers, pneumatic -tired rollers, three -wheel power rollers, vibratory compactors or other approved equipment well -suited to the soil being compacted. If a sheepfoot roller is used, it shall be orovided with cleaner bars attached in a manner which will prevent the accumulation of material between the tamper feet. The rollers should be designed so that the effective weight can be increased. I 1 1 [1 1 1 I APPENDIX A Suggested Specifications for Placement of Compacted Earth Fill and/or Backfills. G E N E R A L A soils engineer shall be the owner's representative to inspect and control all compacted fill and/or compacted backfill placed on the project. The soils engineer shall approve all earth materials prior to their use, the methods of placing, and the dearee of compaction obtained. A verification of approval from the soils engineer will be required prior to the owner's final acceptance of the filling opera- tions. M A T E R I A L S Soils used for all compacted fill beneath interior floor slabs shall be a oranular, nonexpansive type. The upper 12" to 18" of compacted earth backfill placed adjacent to exterior foundation walls shall be an impervious, nonexpansive material. No material having a maximum dimension greater than six inches shall be placed in any fill. All materials proposed for use in compacted fill and/or compacted back - fill shall be approved prior to their use by the soils engineer. PREPARATION OF S U B G R A D E All topsoil, vegetation, debris, and other unsuitable material shall be removed to a depth satisfactory to the soils engineer before begin- nino Preparation of the subgrade. The subarade surface of the area to be filled shall be scarified a minimum depth of six inches, mois- tened as necessary, and compacted in a manner specified below for the subsequent layers of fill. Fill shall not be placed on frozen or muddy ground. 1 SUMMARY OF TEST RESULTS BORING DEPTH % DRY DENSITY UNCONFINED COMPRESSIVE WATER SOLUBLE PENETRATION NO. FT. MOISTURE P.C.F. STRENGTH-P.S.F. SULFATES-% BLOWS/INCHES 6 3.0-4.0 21.2 7.5-8.2 2.6 13.5-14.1 17.7 7 3.0-4.0 16.1 7.0-8.0- 12.2 13.5-14.0 2.4 8 3.0-4.0 19.8 7.0-8.0 17.0 13.5-14.3 16.2 9 3.0-4.0 27.0 7.0-8.0 21.0 13.5-14.5 17.6 10 $.0-4.0 17.3 7.0-8.0 24.5 13.5-14.5 17.5 11 3.0-4.0 12.0 7.0-8.0 18.8 13.5-14.4 23.6 8%12 50/8 50/7 16/12 23/12 50/5 11/12 43/12 50/9 2/12 21/12 50/12 14/12 8/12 2,6/ 12 15/12 14/12 50/11 EMPIRE LABORATORIES, INC. SUMMARY OF TEST RESULTS BORING DEPTH % DRY DENSITY P.C.F. UNCONFINED COMPRESSIVE STRENGTH-P.S.F. WATER SOLUBLE SULFATES-% PENETRATION BLOWS/INCHES NO. FT. MOISTURE 1 3.0-3.5 14.9 50/6 7.0-7.5 13.9 50/6 13.5-14.0 13.2 50/5 2 3.0-4.0 21.5 10/12 7.0-7.6 14.0 50/7 13.5-14.0 11.9 50/5 3 3.0-4.0 23.5 4/12 7.0-8.0 35.3 12/12 13.5-14.5 17.3 26/12 4 3.0-4.0 27.5 6/12 7.0-8.0 42.9 19/12 13.5-14.5 17.9 26/12 5 3.0-4.0 13.7 7/12 8.5-9.5 24.2 21/12 13.5-14.5 19.5 36/12 EMPIRE LABORATORIES, INC. 01 Ad LOG OF BORINGS F—\//-'� T 10 No. 9 N.. 10 No. I I 4980 4975 4970 4965 4960 4955 2/12 LZ 21112 77- V 7 --7 15/12 50/7E r;r— Id 12 z 10 1 14/12 50/1, 26/L2 ' LOG OF BORINGS 1 No. 6 No. 7 No. 8 ' 4970 4950 4g55 4g5r 1 t ll. 12 43/12_ / ✓ 16 12 7112 8 12 23 50 9 e -o o. 21 12 — 508 _— 50/5 e 36 12 50/7 49-90 4975 4970 4965 4960 4955 4950 LOG OF BORINGS J No. I No. 2 No. 3 No. 4- i,. 7 50 6 — -- 50 5 — ✓ �✓ i 10 12 50 7 _ — 4/12 — _ — — 6 12 50/5 = 12112 19/12 zz 26/12 26/12 NnTE: ELEVATIONS WERE INTERPOLATED FPO'l A TOPOGRAPHIC MAP PREPARED RY ZVFK ARCHITECTS/PLANNERS KEY TO BORING LOGS TOPSOIL a GRAVEL ® FILL LA SAND &GRAVEL SILT is SILTY SAND & GRAVEL CLAYEY SILT op COBBLES /7' SANDY SILT ,o� SAND, GRAVEL & COBBLES ' ® CLAY ® WEATHERED BEDROCK ' FI SILTY CLAY PH SILTSTONE BEDROCK SANDY CLAY ® CLAYSTONE BEDROCK ' a SAND SANDSTONE BEDROCK El SILTY SAND ® LIMESTONE 1 � CLAYEY SAND "" • ... GRANITE ' SHELBY TUBE SAMPLE STANDARD PENETRATION DRIVE SAMPLER WATER TABLE 17 DayS AFTER DRILLING C T HOLECAVED .i• .. ♦r iwn Sri._.. _rr /r .. i 1 1 17 L 1 1 1 1 1 11 1 TEST BORING LOCATION PLAN Z V _. 1 NN DITL14 ®No.1`► ® • No.20 ®Na.9 No.16 No.15 0.10 Ne.l7• �Ns.B • • M/n%R51-1Y /.1RC—/� N0.10 Na.I1 I Li n.TOT 7 No.11 Na.12 No.13 No.14- � � J OQ ` No. Mo. 7 o�C No. S PROP05E.D Df_TLNTION POND I • • • No.I Na 2 Ne.3 N&A No.5 ••-•DRILLED JUNL 21,22,23, 1972 6---bRILL:LD JUNE— 29 1976 (ALL BORINGS 445r—t) 1 11 II I h U 1 1 the site. All test holes should be monitored throughout and after instal- lation of drains and filling of the marsh area to determine the effect of the construction on groundwater levels in the area and the suita- bility of the site for basement construction. GENERAL COMMENTS Every effort was made to provide comprehensive site coverage through careful locations of the test borings, while keeping the site investigation economically feasible. Variations in soil and groundwater conditions between test borings may be encountered during construction. In order to permit correlation between the reported subsurface con- ditions and the actual conditions encountered during construction and to aid in carrying out the plans and specifications as originally con- templated, it is recommended that Empire Laboratories, Inc. be retained to perform continuous construction review during the excavation and foundation phases of the work. Empire Laboratories, Inc. assumes no responsibility for compliance with the recommendations included in this report unless they have been retained to perform adequate on -site construction review during the course of construction. 1 1 1 1 1 has ceased in the area to the west of the property, and a sewer has been constructed along the west, south, and east property lines. These factors have reduced the flow of water into the marsh area slightly. However, the other factors mentioned above have kept water levels in the wet area high. Therefore, to make the marsh area suitable for construction, alterations in the surface and subsurface drainage in the area will be required. It is recommended that the marshy area be drained. A series of drains should be placed below the wet area and should drain to the south into existing farm drains or into the underdrain below the ex- isting sewer, if one exists. All vegetation should be stripped from the wet area, and the marsh should then be filled and graded so that surface runoff is directed away from the area or into the proposed detention pond. The drains should be constructed prior to filling the pond. The subgrade below the pond area should be scarified, if possible, mixed with a granular pit -run material approved by the soils engineer, and compacted to at least ninety percent (90%) of Standard Proctor Density ASTM D 698-70. (See Appendix A.) The pond should then be filled with a minimum of two (2) feet of the approved granular pit -run material. Additional fill placed above the pit run may consist of the on -site clays or other acceptable material approved by the soils engineer. All fill should be placed in uniform six (6) inch lifts at optimum moisture and compacted to at least ninety-five percent (95%) of Standard Proctor Density ASTM D 698-70. Preparation of subgrade and placement of all fill should be in- spected by the soils engineer. Field density tests should be taken under the supervision of the soils engineer to insure proper compaction. It is further recommended that a drain be placed adjacent to the Eaton Ditch. The drain should be designed to intercept seepage water from the ditch and minimize flow into the marsh area and other wet areas located adjacent to the ditch. Water from the drain should empty into the proposed detention pond or drain into proposed or existing drains on I I 1 1 C 1 1 1 1 11 I moderate swelling potentials. The upper one-half (2) to three (3) feet of the bedrock is highly weathered; however, the underlying interbedded sandstone, siltstone, and claystone is firm and exhibits very high bearing characteristics. (6) Groundwater: At the time of the investigation, free ground- water was encountered at the surface in Boring 2 and to depths eleven (11) feet below the surface in all but Boring 7. No free groundwater was encountered in Boring 7 to a depth fourteen (14) feet below the surface. Water levels in this area are subject to change due to seasonal variations and irrigation demands on and adjacent to the site. All test borings were cased so that water levels could be monitored throughout the seasonal variations. RECOMMENDATIONS AND DISCUSSION It is our understanding that the site is to be developed for commercial structures, garden apartments, town homes, patio homes, and single-family homes. A small detention pond is planned in the western portion of the site. The western part of the site is currently occupied by a large marsh or wet area. This area is vegetated with cattails. Groundwater levels within the marshy area are at or near the surface. The initial investi- gation for this area, undertaken by Empire Laboratories, Inc. in June 1972, indicated similar groundwater conditions. The marsh is located in an area of internal drainage and receives surface runoff from the surrounding land in all directions. Excess irrigation water from planted fields east of the marsh area drains into the marsh. Seepage from the Eaton Ditch also flows into the low, wet area. Surface and groundwater conditions in the area have been altered somewhat due to construction on and adjacent to the site. Irrigation (2) Silty Clay: This stratum was encountered in Borings 2, 3, 4, 5, 8, and 11 below the topsoil and extends to depths three and one-half (32) to twelve and one-half (122) feet below the surface. The silty clay is very plastic and exhibits low to moderate bearing characteristics in its dry to moist in situ condition. When wetted, the drier clays exhibit slight to moderate swelling potentials. (3) Sandy Silty Clay: The sandy silty clay layer was encountered below the topsoil in Borings 1, 6, 7, 9, and 10 and extends to depths two and one-half (22) to twelve (12) feet below the surface. The brown silty clay contains varying amounts of sand and traces of gravel, is plastic, and exhibits moderate bearing characteristics in its dry to moist natural state. When wetted, the sandy silty clay exhibits slight to moderate swelling potentials. (4) Sand, Gravel, and Cobbles: The granular layer was encountered in Borings 6 and 7 below the upper clays and extends to depths ten (10) to greater than fourteen (14) feet below the surface. The sand and gravel exhibits high bearing characteristics in its dense in situ condition. It is estimated that the cobbles within the gravel stratum range in size to twelve (12) inches in diameter. (5) Claystone, Siltstone, Sandstone (Bedrock): The bedrock was encountered in all but Boring 7 at depths two and one-half (2z) to twelve and one-half (122) feet below the surface and extends to greater depths. The bedrock consists of inter- bedded lenses of sandstone, siltstone, and claystone. The siltstone and claystone portion of the bedrock exhibits 1 1 [1 1 11 11 SITE LOCATION AND DESCRIPTION The site is located between Redwood Street and Lemay Avenue south of the Eaton Ditch, northeast of Fort Collins, Colorado. More par- ticularly, the site is described as Greenbriar P.U.D., situate in the southeast 1/4 of Section 36, Township 8 North, Range 69 West, and the north 1/2 of the northeast 1/4 of Section 1, Township 7 North, Range 69 West of the Sixth P.M., Larimer County, Colorado. The majority of the site consists of relatively flat, irrigated farm land planted in alfalfa, beans, and corn. A large marshy area vegetated with cattails and exhibiting high groundwater is located in the western portion of the site. The Eaton Ditch is located along the north boundary of the property and is elevated above the site. A small marshy area is located south of the ditch in the north central portion of the site. A small hill is located in the northwest corner of the property, and this portion of the site has good positive drainage from the knoll to the southwest, south, and southeast. The remainder of the site has minor drainage to the southeast. A sanitary sewer is located along the west, south, and east property lines. Large trees are located in the northern portion of the site along the Eaton Ditch. SOIL AND GROUNDWATER CONDITIONS The soil profile at the site consists of strata of materials arranged in different combinations. In order of increasing depths, they are as follows: (1) Silty Topsoil: The area tested is overlain by a one (1) foot layer of silty topsoil. The upper six (6) inches of the topsoil have been penetrated by plant roots and organic matter and should not be used as bearing soil or as backfill material. I I I II 1 [1 7L 1 I 1 SCOPE REPORT OF A SOIL PROFILE AND GROUNDWATER INVESTIGATION This report presents the results of a Soil Profile and Groundwater Investigation prepared for the Greenbriar P.U.D. located on Lemay Avenue, northeast of Fort Collins, Colorado. The investigation was carried out by means of test borings and laboratory testing of samples obtained from these borings. The objectives of this investigation were to (1) determine the soil profile and groundwater elevations at the site and (2) recommend certain precautions which should be taken because of adverse groundwater con- ditions. SITE INVESTIGATION The field investigation, carried out on June 28, 1978, consisted of drilling, logging, and sampling eleven (11) test borings. The locations of the test borings are shown on the Test Boring Location Plan included on page 7 of this report. Boring logs prepared from the field logs are shown on pages 9 through 11. These logs show soils encountered, lo- cation of sampling, and groundwater at the time of the investigation. A preliminary soils and foundation investigation was prepared for the site by Empire Laboratories, Inc. July 26, 1972. During this investiga- tion twenty-one (21) test borings, also shown on the Test Boring Location Plan, were drilled at the site. All borings were advanced with a four -inch diameter, continuous - type, power -flight auger drill. During the drilling operations, a field engineer from Empire Laboratories, Inc. was present and made a continuous visual inspection of the soils encountered. G 7 L Empire Laboratories, Inc. MATERIALS AND FOUNDATION ENGINEERS 214 No. Howes Fort Collins, Colorado 80522 P.O. Box 429 (303) 484-0359 ZVFK Architect,6 and PZanneas 218 West Mountain Avenue Font CoUi.nz, CoZorado 80521 Attention: MA. Ed Zdeneh. Genteemen: Branch Offices 1242 Bramwood Place Longmont, Colorado 80501 P.O. Box 1135 (303) 776-3921 3151 Nation Way Cheyenne, Wyoming 82001 P.O. Box 10076 (307) 632-9224 We cute plea -led to submit ouA Report o6 a So.ie PAo6ite and Groundwater Inve6tigation prepared 6or the puposed pta.nned unit development .Cocated nontheaAt ob Font CoZUns, CoZorado, ad requested. The accompanying report presents ouA jindings in the subsuA�ace and outs recommendations baaed upon the/se bindings. Vehy tnuey youX6, EMPIIRRjE', LABORATORIES, INC. /I d� Neil. R. S etucod S ecttetany-Treas uAeA Reviewed by: Chester. C. Smith, P.E. P)Lu dent Pit cc: Resource Con6w tants Ted Rose NElI SHERR00 Cy au3' `0 #2575 n� J * N 4SG8 %O( 6 -7 1 V i CHESTER C "` TH TABLE OF CONTENTS Table of Contents .......................................... i Letter of Transmittal ...................................... Report..................................................... 1 Test Boring Location Plan .................................. 7 Key to Borings ............................................. 8 Log of Borings ............................................. 9 Summary of Test Results .................................... 12 AppendixA . ................................................ 14 REPORT OF A SOIL PROFILE AND GROUNDWATER INVESTIGATION FOR ZVFK ARCHITECTS AND PLANNERS FORT COLLINS, COLORADO PROJECT NO. 1192-72 RE: GREENBRIAR P.U.D. LAR.IMER COUNTY, COLORADO BY EMPIRE LABORATORIES, INC. 214 NORTH HOWES STREET FORT COLLINS, COLORADO 80521 SOILS TESTS ZTI GROUP ARCHITECTURE 1220 SC�o Avenue Fat Cabins, CO 80524 S303 493-4105 Oke 3031 825-1122 Metro