HomeMy WebLinkAboutLINDENMEIER ESTATES PUD - PRELIMINARY - 24-94 - SUBMITTAL DOCUMENTS - ROUND 1 - DRAINAGE REPORTSTEWART&ASSOCIATES 10 S. M LDiRUM,FAX as2-9g OLLINS, CO 80521
Consulting Engineers and Surveyors
By: Date: Client: ?�- • C2�j Sheet No. ( of
Project: L I D�->>�t�1ICI
Subject: ii ZE-EU VA t 0 tit?y "Llll 11Cc o�
i
Z; Z, j ZCoO/ Co l0 1Jo2j� 1 N�'c
S 1,37
L t Z�, 2 O Ol3vo �Ew.w� -T ►.ka r
71 .
i
1;AS1� -1wAT ColoiQoc-
i �—�'eJoa,,►a Zr�,�e,� `�e��as 2',3 i j
iJ i
1 i �
i
I
SUSBASIN:..T.O.C.:..,..:(.100yt)...
...........
D. Pnt
Slope
c Cf
Length
(feet)
OverLTc
(min.)
Vel.Chan
(ft/sec.)
Tc Chan.
(min.)
Tc Tom]
(min.)
COMMENTS
L 1
2.00
1.00
50.00
1.0
Tc (100)
1.00
300.00
225
2.2
......3.31
LNGST. ERL.+CHANNEL
0.90 = Runoff C 1.00 = Cf 2,10 1.25 =Cf 100
D. Pnt
Area
(acres)
C Cf
I (2yr.)
(in/hr)
I (10yr.)
(in/br)
I (100yr.)
(in/hr)
Basin Q
(cfs)
Comb. Q
(cfs)
COMMENTS
0.23
1.00
3.30
0.76
0.81
2 yr. runoff
1.00
5.65
1.30
4
10 r. runoff
�jj 0
1.00
7.00
1.61
_j
I
100 yr. runoff
0.90 C 1.00 =Cf(zlo) 1.25 =Cf 100
.SUBBASIN..., OC.:.. 000YO-......
D. Pnt
Slope
(0/0)
c Cf-
Length
V (feet)
Overl-Tc
(min.)
Vel.Chan
(ft/sec.
Tc Chan.
min.
Tc Total
min.)
COMMENTS
2.001
1.001
50.001
1.01
1
Tc (100)
1.001
1 300.001
1 2-251
2.2
1 .... .,.:a3j
LNGST. OVERL+CFIANNEL
0.90 = Runoff C 1.00 = Cf 2,10 1.25 =Cf 100
D. Pnt
Area
(acres)
C Cf
I (2yr.)
(in/br)
I (10yr.)
(in/br)
I (100yr.)
(in/hr)
Basin Q
(cfs)
Comb. Q
(cfs)
COMMENTS
0.75
1.00
3.30
2.48
25
2 yr. runoff
1.00
5.65
4.24
42
10 r. runoff
1.00
7.00
5.25
100 r. runoff
y
0.90 = C 1.00 =Cf(zlo) 1.25 =Cf(100)
...... ....
�)..
SUBBASIN O.C. Alfflyr
X
D. Pnt
Slope
c Cf
Length
(feet)
Overl-Tc
(min.)
Vel.Chan
(ft/sec.)
Tc Chan.
(min.)
Tc Tom]
(min.)
COMMENTS'
1.001
0.56
110.00
10.5
Tc (100)
1.001
400,06-
0.70
9.5
20 1
LNGST. OVERL+CHANNEL
0.45 = Runoff C 1.00 = Cf 2,10 1.25 =Cf 100
D. Pnt
Area
(acres)
c Cf
I (2yr.)
(in/hr)
I (10yr.)
Cin/hr)
I (100yr.)
(in/hr)
Basin Q
cfs
Comb. Q
(cfs)
COMMENTS
0.77
0.45
2-35
2.23
22
2 yr. runoff
0.45
4.10
3.89
"',,-:3 9
10 r. runoff
0.56
6.60
7.83
.8
100 yr. runoff
0.45 = C -1.90 =Cf (zlo) 1.25 =Cf 100
3,�;-:j
I. fb = ArBataC) mis page
D. Pnt.
Area
(acres)
C Cf
I (2yr.)
(in/hr)
I (10yr.)
(in/hr)
I (100yr.)
(in/hr)
Basin Q
(cfs
Comb. Q
(cfs)
COMMENTS
4
1.17
0.45
2.35
1 242
-.2
yr. runoff
0.45
4.10
2-161
22
10 yr. runoff
0.56
6.60
4.341
100 yr. runoff
0.45 = C 1.00 =Cf 2,10 1.25 =Cf(100)
D. Pnt.
Slope
C Cf
Length
(feet)
Overl-Tc I
(min.
Vel.Chan
fUsec.
Tc Chan.
min.
Tc Total
min.)
COMMENTS
2-001
0.561
300.001
13.81
Tc (100)
1.001
0.001
1 0.70
0.0
3 8
LNGST. OVERL +CHANNEL
0.45 = Runoff C 1.00 = Cf 2,10 1.25 =Cf 100
D. Pnt.
Area
(acres)
C Cf
I (2yr.)
(in/hr)
I (10yr.)
(in/hr)
I (100yr.)
(in/hr)
Basin Q
(Cfs)
Comb. Q
(cfs)
COMMENTS
0.60
0.45
2.20
0.59
2 yr. runoff
0.45
3.80
1.03
p.m
10 yr. runoff
0.56
6.20
Z09
100 yr. runoff
0.45 = C 1.00 =Cf 2,10 1.25 =Cf(100)
SUBBASIWT.'O.0 -4000yr).
D. Pnt.
Slope
C Cf
Length
(feet)
OverL Tc
(min.)
Vel.Chan
(ft/sec.
Tc Chan.
min.
Tc Total
min.)
COMMENTS
1.00
0.25
25.00
7.9
Tc (100)
1.30
0.00
2.25
0.0
1-9
LNGST. OVERL+CHANNEL
0.20 = Runoff C 1.00 = Cf 2,10 1.25 =Cf 100
D. Pnt.
Area.
(acres)
C Cf
I (2yr.)
(in/hr)
I (10yr.)
(i n /h r)
I 100yr.)
(in/hr)
Basin Q
(cfs)
Comb. Q
(cfs)
COMMENTS
0.77
0.45
2.70
0.94
2 yr. runoff
0.45
4.70
1.63
i 61
10 yr. runoff
7.00
3.031Ln'.�.XXXX�-:�:."
100 r. runoff
0.20 = C 1.00 =Cf(zlo) 1.25 =Cf 100
LU 1 '
i::.,)4 = Areatac) mis page
'SUBBASIN TOC.
D. Pnt Slope
DEVELOPED RUNOFF COMPUTATIONS FROM RATIONAL METHOD
Q = C x Ct x I x A
C Cf Length Overl-Tc Vel.Chan Tc Chan. Tc Total COMMENTS
(min.)
(tt/sec.)
(min.)
(min.)
j(feet)
2.001
0.56
180.00
10.71
Tc (100)
1.001
-
0.00
200
0.00
7
LNGST. OVERL.+CHANNEL
0.45 = Runoff C
1.00 = Cf 2,10
1.25 =Cf 100
7L 91U�BBA51N,,.::T.LOC
D. Pnt
Slope
I C*Cf
I Length
I overl-TC
Vel.Chan
Tc Chan.
TcTotal
COMMENTS
%
I (feet)
I (min.)
(ft/sec.)
(min.)
(min.)
3.001
0.561
- 260.001
11.2
1
Tc (100)
2.00
5.1
." L ........ 16 3
LNGST. OVERL+CHANNEL
0.45 = Runoff C 1.00 = Cf 2,10 1.25 =Cf 100
SUBBASIN1O.C,-.1-:
D. Pnt
Slope
%
C Cf
I
Length
feet )
Overl-Tc
(min.)
Vel.Chan
I (ft/sec.)
Tc Chan.
(min.)
Tc Total
(min.)
COMMENTS
3.001
-
0.56
260.00
11.2
Tc (100)
3.001
610.00
2.50
4.1
LNGST. OVERL.+CHANNEL
0.45 = Runoff C 1.00 = Cf 2,10 1.25 =Cf 100
D. Pnt.
Area
(acres)
f
I (2yr.)
(in/br)
I (10yr.)
(in/hr)
I (100yr.)
(in/hr)
Basin Q
(cfs
Comb. Q
cfs)
COMMENTS
3
1.2
0.45
2-10
1. 13
2 yr. runoff
0.45
3.76-
2.00
10 r. runoff
0.56
6.00
4.05
4.11
100 yr. runoff
0.45 = C 1.00 =Cf 2,10 1.25 =Cf(100)
4.86 = Area(aC) this page
DATE: March 1994
HISTORIC/DEVELOPED RUNOFF COMPS. 2/10/100 YR. STORMS
LINDEN ESTATES
FOR: Z.T.I. GROUP
BY: Stewart & Associates
GENERAL NOTES: Velocity in a Channel per FIGURE 3-2
If C x Cf > = I then C x Cf = 1 (constants listed below)
For design of the developed site runoff quantities Tc(l 00) was the basis for design
D. Pnt. Slope C*Cf Length Overt Tc I Vel.Chan I TcChan. I TcTotal COMMENTS
3.701 0.311 200.001 13.51 Tc (100)
............ ...
0.001 1 0.001 1 2.001 0.001---,',-.
........ �.13 51 LNGST. OVERL.+CHANNEL
= Runoff C 1.00 = Cf 2.10 1.25 =Cf 1
D. Pnt.
Area
(acres)
C Cf
I (2yr.)
(in/hr)
1 (1 Oyr.)
(in/hr)
I (100yr.)
(in/hr)
Basin Q
cfs
Comb. Q
cfs
COMMENTS
2.58
0.25
2.75
1.77FTTTTTT81
2 yr. runoff
0.25
4.00
2.581
10 yr. runoff
0.31
6.40
5.16
00 yr. runoff
0.25 C 1.00 Cf(2,1 0) 1.25 =Cf(100)
IMM
6.95 = Area this Page
Storm Drainage Report'
Lindenmeier Estates
Page 5
CONCLUSIONS
No risk to health or human safety are evident from the
preliminary review undertaken. Concern of downstream property
owners will be addressed and verified during final, though it
does not appear as though any significant impact will result.
Should question arise during your review of this report please do
feel free to contact our office so we may facilitate your
.. understanding.
Respectfully,
Richard A. Rutherford, P.E. & L.S. #5P28
b:\linden.rpt
Storm Drainage Report'
Lindenmeier Estates
Page 4
Street capacities are well within the SDDCCS criteria and
should present a concern during final design. Curb inlets will
all be designed in a "sumped" condition to facilitate the maximum
inlet capacity. It is anticipated that software developed for
Urban Storm Drainage "UDSEWER" will be used to design the piped
collection system. No landscaped areas within the site will be
left with slopes of less than 2 percent that would require
nuisance flow considerations.
Offsite data will be required for much of the final design
work though during this cursory review and based on available
data the design concept is feasible. Data on the swale and down
stream piping into the Lake will be the primary focus of further
study.
DETENTION
Detention may not be required on this site, apparently the
downstream structures are adequate. Though this fact will have to
be verified in detail, before we will do a final design without
detention. Also the owners of the Lindenmeier Lake, Water Supply
and Storage, appear willing to accept the increase of storm flows
from this proposed residential development.
Storm Drainage Report'
Lindenmeier Estates
Page 3
This historic. runoff is directed primarily to two specific
areas, the ditch on the West facing slope, and the existing 1
12" CMP crossing Lemay and running into Linden Lake. These points
of release will be maintained following the proposed intensified
usage. Rates will increase however, with the minor and major
events now developing 13.3 cfs and 41.0 cfs. Basins 1 and U-1
will flow into the ditches while the remainder of the site will
be collected and conveyed into Linden Lake. During this
preliminary report, details of this split of flow has not been
entirely developed. Noteworthy, is the fact that the single
family residence O'Halloran property has been included in our
design considerations:
HYDRAULICS
Piped and surface methods of runoff conveyance will be
incorporated in this project. .Three curb inlets are being
proposed, one each.on the North and South sides of Lindenmeier
Place, and a third at the "low spot" along Lemay Avenue. These
structures will direct flow into the existing 12" CMP and will be
allowed to discharge into the Linden Lake. One area inlet will
also be constructed that will serve as a junction for all of the
aforementioned structures. Preliminary indications are that the
12" CMP may .require an increase in size too handle the 100 yr
direct runoffs.
Storm Drainage Report'
Lindenmeier Estates
Page 2
HYDROLOGY
The site is unique in that most of the 6.95 ac do not flow
offsite nor does offsite flow move onto this project area. There
exist topographic features that function as effective hydraulic
breaks. To the East is Lemay Avenue, which will not allow flows
to cross the proposed center line elevations. Though flows from
150 ft North of the site and approximately the same distance
South will be directed toward the newly constructed storm
drainage collection system. South and West are two existing
ditches that again do not allow flows on to or off the project
area. The ditches will remain as the exist today following the
construction of this development. North, is the irrigation canal
operated by the Larimer and Weld Irrigation Company, again a
substantial hydraulic barrier.
Based on this information the isolation of this drainage
area is evident. Historically, a large portion of the project
area discharge into Lindenmeier Lake on the East Side of Lemay,
during minor and major events rates of 3.8 cfs and 12.2 cfs
respectively can be expected. These rate were established using
the Rational Method, with a runoff coefficient "C"= 0.25 as shown
in the Storm Drainage Design Criteria and Construction Standards
(SDDCCS) for RLP zoning. The SDDCCS is the basis of all design
through out this preliminary report.
6
PRELIMINARY STORM DRAINAGE REPORT
FOR
LINDENMEIER ESTATES
GENERAL
The proposed residential development is in the Northeast
quadrant of Fort Collins (the City), Colorado, in Section 36,
Township 8 North, Range 68 West of the 6th P.M. This is
approximately 1/4 mile North of the North Lemay Avenue (Lemay),
East Willox intersection, on the West side of Lemay. Currently,
the site is zoned RLP and has not undergone any development
activity. A dense grass and weed covered knoll describes the 6.95
ac existing site conditions, with slopes ranging from 2 to 5
percent.
North of the site is the Larimer and Weld Irrigation Company
Canal and the Puebla Vista Estates Subdivision. West is a single
family residence and a proposed regional detention facility for
the City. South is the Greenbriar Estates Subdivision, while East
is Linden Lake Estates on the opposite side of Lemay. Proposed
are 12 residential lots yielding densities of less than 2 units
per acre. The site does not reside in any major drainage basin,
but is isolated hydrologically to a large degree. Details of this
isolation will be provided later in this report.
r
Preliminary Storm Drainage Report
for
Lindenmeier Estates
March 1994
STEwArg;LAiSSocwTES
Consultin3 En3ineers and Surveyors
103 South lle-Qditum •SdA"I
Tort Cottins, Coloaado 80521
3031482-9331