HomeMy WebLinkAboutLINDENMEIER ESTATES PUD - PRELIMINARY - 24-94 - CORRESPONDENCE - RESPONSE TO STAFF REVIEW COMMENTS10. We have redesigned entrance to provide a 36' wide access to Lemay
Avenue.
11. We have net with the Natural Resources Department (Bob Wilkinson) and
the City Arborist (Tim Buchanan) and physically inspected the site. We
have concluded that the rear portions of lots 3 - 5 and a portion of lot 2
should be maintained in a natural manner, similar to its existing character.
We did an inventory of existing vegetation, developed a list of potential
additional materials that might be added, and identified materials that
should be eliminated. We will provide a Landscape Plan for the area with
our Final PUD Submission.
12. It is the intent of our Development to appear similar to the single Family
projects adjacent to ours on the north and east. To accomplish this each
home will have the ability to have up to 800 square feet with an additional
kitchen designated for use by a related individual or individuals. We would
also like to allow more flexibility in design of the individula residences, while
creating the desired minimum density of 3 units per acre the City desires.
Each lot shall be considered as a duplex, providing an overall density at
3.45 DU/AC while maintaining the asthenic impact of a single family
residential neighborhood. The architectural character will be dictated by the
architectural control committee of Lindenmeier Estates.
13. We have provided a 60' wide access to the O'Halloran Property from our
Northern most cul-de-sac.
14. Ok.
I hope this letter and the meeting we had earlier answers all the questions we
currently have and we can proceed with our Preliminary PUD hearing in May.
;Si,nc
Edward G. Zdenek
ZTI Group/Development
C. We acknowledge an easement adjacent of a ditch and will add it to
our final plans.
d. We do not acknowledge that the home owners have no access to
the ditch maintenance road (see item 1b above)
e. We agree not to dump grass clippings, etc. into the ditch
f. We will not agree to fence the north property line (see item lb
above)
g. We agree to delineate ditch easement on the final plat.
h. We acknowledge the potential seepage problem above the ditch.
2. We agree to the same restrictions that apply to the O'Halloran property.
3. We will provide appropriate easements to US West on the Final Plat.
4. a. No, Lemay Avenue will be a 68' right-of-way
b. See Landscape Notes
C. We have changed Preliminary Plat.
d. We have provided a 25' easement adjacent to the Lemay Avenue
right-of-way.
5. We will provide 10 Utility easements at the rear of all lots on our Final Plat.
6. Elco water will be in the new 25 easement.
7. Ok.
Do-•
9. Ok.
May 5, 1994
unuur Mr. Steve Olt
ARCHITECTURE Project Planner
City of Fort Collins
Planning Department
281 North College Ave.
Fort Collins, CO 80522-0580
Dear Steve,
I am responding to your letter of April 25, 1994 regarding the Lindenmeier Estates
PUD- Preliminary.
1. 1 have reviewed the letter from Mr. Dow regarding the Larimer and Weld
Irrigation Canal and have resolved their concerns as follows:
a. We acknowledge the potential ground water seepage problems.
b. We acknowledge the right to the ditch company to use the
maintenance road on the south side of the ditch. We further
expressed our interest in pursuing the development of the
maintenance road into a combined maintenance and bicycle trail that
would be improved and maintained by the City of Fort Collins. I also
noted that I felt there might be a possibility that the City would
provide liability insurance coverage that would be in the best interest
or both parties. Mr. Dow suggested that we pursue the possibilities
with both the City and his board. I have contacted Mike Powers,
Leslie Bryson, and Randy Balok, with the City Parks and Recreation
and they seem to have an interest I have also contacted Dr. William
O'Halloran, our next door neighbor who has also expressed interest.
I would suggest that we all have a meeting, formulate and
acceptable approach and make a joint presentation to the Board of
Directors of the Ditch Company.
1220 South College
Suite 200
Fort Collins, CO 80524
303-493-2393