HomeMy WebLinkAboutVALUE PLASTICS PUD, TIMBERLINE PLAZA (LOTS 3 - 5) - PRELIMINARY / FINAL - 26-94 - REPORTS - RECOMMENDATION/REPORT W/ATTACHMENTSn \oZ 1■ i\
Lv
v
ANBOED PHE.MNNAPY & FINAL
ELEVATIONS
VALUE
PLASTICS
m eOUTN ELEVATION 14
C
R�1p-0�
A
x�m
av
VALUE PLASTICS rim
INDUSTRIAL
USES
POINT CHART F
For All Critera
Applicable criteria Only
Criterion
Is The
Criterion
Applicable
Yes No
u m Iv
Circle
The
Correct
Score
Yes W r No
Multiplier
Points
Earned
1x11
Maximum
Applicable
Points
a. "Noxth" Fort Collins
X
X
2
0
1
—
2
b. Industrial center
X
X
2
0
3
(o
b
c. On arterial street
4
X
210
1
2
2,
d. Energy conservation
X
1,210
3
---
b
e. Historic preservation
1
2
0
2
—
f.
1
2
0
g.
112,01
h.
1
2101
i.
1
2
0
j.
1
2
0
k.
1
2
0
I. 1
1
1
2101
' VW — Very Well Done
Totals V !J
V vl
Percentage Earned of Maximum Applicable Points VNI =VI1
w
VALUE PLASTICS PUD
Activity A: ALL DEVELOPMENT CRITERIA
ALL CRITERIA
APPLICABLE CRITERIA ONLY
CRITERION
s a,e cntenon
appiica ?
wia ft critenon
be sari w?
If no, please explain
Ii f II
Yes
No
Al. COMMUNITY -WIDE CRITERIA
1.1 Solar Orientation
1.2 Ccmprehensive Plan
1.3 Wildlife Habitat,
1.4 Mineral Deposit
1.5 Ecologically Sensitive Areas
reserved
reserved
1.6 Lands of Agricultural Imoortance
1.7 Energy Conservation
1.8 Air Qualitv
1.9 Water Qualitv
1 10 Sewace and Wastes
A 2. NEIGHBORHOOD COMPATIBILITY CRITERIA
2.1 Vehicular. Pedestrian. Bike Transoortation
2.2 Building Placement and Orientation
2.3 Natural Features
2.4 Vehicular Circulation and Parkin
2.5 Emergency Access
2.6 Pedestrian Circulation
2.7 Architecture
)4
'\/.
INK
1
2.8 Building Height and Views
2.9 Shading
2.10 Solar Access
X
2.11 Historic Rescurces
2.12 Setbacks
X
2.13 Landscape
2.14 Sions
2.15 Site Lighting
2.16 Noise and Vibration
2.17 Glare or Heat
2.18 Hazardous Materials
A 3. ENGINEERING CRITERIA
3.1 Utility Capacity
X
3.2 Design Standards
3.3 Water Hazards
3.4 Geologic Hazards
Ripley Associates
Planning Objectives - value Plastics PUD
Page 2
C. The proposed development would provide employment opportunities within
walking distance of existing residential development.
The proposed Value Plastics facility promises to be not only an attractive addition to the
community, but an innovative example of energy conservation as well. Thank you for
your consideration and we look forward to working with you throughout the development
review process.
Sincerely,
RIPLEY ASSOCIATES
PAC7
l�
Linda Ripley
Principal
April 4, 1994
Planning and Zoning Board
c/o Ms. Kirsten Whetstone
Project Planner
281 North College
Fort Collins, CO 80524
RE: Project Overview and Planning Objectives
VALUE PLASTICS Preliminary/Final P.U.D. Submittal
Dear Planning and Zoning Board Members:
Value Plastics is a manufacturing facility specializing in extruded plastic products used
mainly in the medical field. The existing facility located north of Danfield Court and east
of Eastbrook Drive, was built approximately nine years ago. Since that time, the
company has become an industry leader in the manufacture of extruded plastic parts and
is now planning a major expansion. This proposal is for a new facility that would be
located adjacent to the existing Value Plastics building.
The owners are applying the same formula for success to the design and construction of
their new building as they have to their manufacturing business. Research, innovation
and attention to detail are key. During the design process, the owners, working with The
Neenan Company, are exploring innovative ways to save energy, reduce operating costs,
and create a pleasant work environment for their employees. The owners, The Neenan
Company, City Light and Power and the Western Area Power Administration are
collaborating on this project to create a new Value Plastics facility that is significantly
more energy efficient than current practice dictates. The City's Light and Power
Division plans to document the design process and outcomes as a case study to be used
in discussion with other customers. The intent is to demonstrate how buildings can be
more energy efficient and cost effective. The same desire for quality and efficiency has
also shaped the proposed landscape plan which conserves water through appropriate plant
material selection and other xeriscape practices.
Approximately fifty people will be employed at the new facility, expected to be
completed by the spring of 1995. Since the project is situated within an existing
business/industrial park area, the project team is not aware of any land use conflicts. The
building and grounds are attractively designed to project a positive image for Value
Plastics and also to be an attractive addition to the neighborhood.
City Land Use Policies achieved by this proposed development include the following:
a. The proposed development is located where existing utility infrastructure can
service the proposed land uses.
b. The City's existing transportation network can service this site without
expansion.
RIPLEY ASSOCIATES
Landscape Architecture
Urban Design
Planning
I17 East Mountain Avcnue
sultc 200A
Fort Qtllins, Colorado 80524
PHONE (303) 224.5828
FAX (303) 484-2443
EA5TWOOK DRNE
Tm=c C ROAD
PLANT usT
self«nrlc xRa
cRIYw1 NW
slzE
au.xm.
fpY f. u.t.0 . W..eas
eab G..n be
Ym,CaY
P'
P' ec':
Cie 9ep5an�ILunl.ln
Y
.mums
KWIo.
i wi'�sEl
prcl, c
-t- R b
Evatnn
1-1/$ I-1A
[.1.
w �Yluz yp. Retl�.n�
R.Clml G.Dopple
1-1/e' c.l.
P
Gu�.erua l
91 w.v
.ualr�u Pm. Grvv.
B�
R
P�nua �9
9w lv
C51 Lo.nuv utl[ev
JM JunlMyeu�e. �ilo1M.�
I.ml�PuuW�tl
peps. IRenn��p B�.N
11 Jun[ex
5 9 1.
5
5 9 I
IP
IE
]P
Jwl . 'Lvl� un'
Gup Jun{pw
`.e.
5 9u1�
5
JKKG
JMt mla'W9Ma�
1yl.ele'
m.p 1. •
Wryw Juplpru
59e1.
PI
v
vlv Jun{pp..
Illy
9 9u1.
5]
Polul�llo 1eu11cwu'Go1C+G
SPN bewrnun O�Iwue coyaalen
4p1ElG9P Pot n(Illo
YMr.upclH�R11.1Generry
59p1
A
•p • . n `due
91 v. p G
� P.I.
S Syyew multi'
pulnyefol �a engleee..n�
.Co.pl9e .y
[e9e1_n I.y
Igol.
1 9v1.
I]'
♦
PLANT LEGENDµ
® —.
Fm -- e.
Foe] .m.ma..e.
.m:L er
.LLreR 9e
AMENDED PRELIMINARY/FINAL
PUD
LANDSCAPE PLAN
LAN05GAPE NOTE5
1 Y {YR _IerM Ni eut ..uMpetxe e. Ve of Xprmy_.
[MN) .v pb we Y. Y neea mY u b!v eY pn9wp x +nr.o-ne.
]. uM'-ePylf✓p o-Y. Spm on � La N9' Ps asu N 10 ro-w v,«IK
♦ m!s J.Ise vl JO Wlee,n W.e[ beu N. aMo-i Sp4 .�V Y e.et�ee
♦ Mp L M WtmC Ru Ve LttY wuW WIv. Our o-v pyR.ep m UtY
.qe-oY-.eY rva
VALUE
PLASTICS
m`ums PUD,
re9:
i T 5
4. x ® 3
xocrc. Mo-IA. D
LA. nmNAiioNA� nuLm uue ornccs �hI
naTetoox oms
x4. acnoa
DECORATIVE METAL rENcr nao:-u
CMANLINK FENCE DETAIL
VICINITY MAPLAND USE STATISTICS
EMIR �F
vow
s m
vn �,
u _ -
�•. :'..
LEGAL DESCRIPTION
-' `
STAIEVQR M WMERSNV. SYBNNISbN
OWNERSHIP CERTIFICATE
tR w REm a .R 4w
w
Y(6fNVm fl1ls /6 aOt[ ones
IRMVRt St®n 1R YW[ >r[ I1u. .b GO.Omm x c v-i+
r r
u'ii x
YO LdMnf .O Rt Y[.IIO.dt Y S.O.[OR1f s nGll.
.MPPf f0 Y0 .1Y
� s .ter �. =�w Y w� N
rz
PLANNING + ZONING CERTIFICATE
SITE LEGEND
u.xorm m M nN..rc uc vonc eo.m a w rnt > rm
taut cow.vo ov na — a. > n...
(. mxm >e m axw
0 noroem an-ane �
�A.�r w w.xra r+ar;a:a
.R ..vrwr
PROJECT NOTES
s ""OO•""ioi0
srno..o ..axc wrs
w
w
� ~ W
.� 11aKMW.Id Mf tll1-oR Wwv.[
. pn ..'•�r�x
w M' ISL-NMfLO 'Ts GR-M LY'n..[
AMENDED PRELIMINARY/FINAL PUD
SITE PLAN
n+ecx vr+.erc�
VALUE
PLASTICS
�-= P U D
�p n i iw.,
KAM
�vOn
CO[ L1NDALF F,• 'V
&04F COVRSE . .
0
IP R F
LUUT
0
IMMUNE ESNIM
SITE
r
o"MIi arsE
REI
40
ITEM. TIMBERLINE PLAZA PUD-Final North
Value Plastics
NUMBER: 26-94
Value Plastics PUD at Timberline Plaza - Preliminary and Final,
#26-94
May 23, 1994 P & Z Meeting
Page 5
monthly meeting, apply to the Board for an extension of time.
The Board shall not grant any such extension of time unless it
shall first find that there exists with respect to said
planned unit development final plan certain specific unique
and extraordinary circumstances which require the granting of
the extension in order to prevent exceptional and unique
hardship upon the owner or developer of such property and
provided that such extension can be granted without
substantial detriment to the public good.
If the staff and the developer disagree over the provisions to
be included in the development agreement, the developer may
present such dispute to the Board for resolution if such
presentation is made at the next succeeding or second
succeeding monthly meeting of the Board. The Board may table
any such decision, until both the staff and the developer have
had reasonable time to present sufficient information to the
Board to enable it to make its decision. (If the Board elects
to table the decision, it shall also extend the term of this
condition until the date such decision is made).
If this condition is not met within the time established
herein (or as extended, as applicable), then the final
approval of this planned unit development shall become null
and void and of no effect. The date of final approval for
this planned unit development shall be deemed to be the date
that the condition is met, for purposes of determining the
vesting of rights. For purposes of calculating the running of
time for the filing of an appeal pursuant to Chapter 2,
Article II, Division 3, of the City Code, the 11final decisions$
of the Board shall be deemed to have been made at the time of
this conditional approval; however, in the event that the
dispute is presented to the Board for resolution regarding
provisions to be included in the development agreement, the
running of time for the filing of an appeal of such 11final
decisionts shall be counted from the date of the Board's
decision resolving such dispute.
Value Plastics PUD at Timberline Plaza - Preliminary and Final,
#26-94
May 23, 1994 P & Z Meeting
Page 4
5. Transportation
Access to the site is from Eastbrook Drive and Vermont Drive. No
direct access is taken off of Timberline Drive, an arterial street.
Transportation staff has reviewed the proposed plans and site
access study and agrees with the conclusions that key intersections
will operate at acceptable levels, except for minor street left
turns during the afternoon peak, with the addition of traffic from
this PUD.
With completion of the Fort Collins High School, Pinecone
Apartments, and other residential development on the east side of
Timberline Road a traffic signal at the Vermont/Timberline
intersection will likely be warranted. The traffic study indicates
that when the signal is constructed, the Timberline/Danfield
intersection is expected to be limited to right-in/right-out/left
in, in order to operate acceptably. In the long range future, the
traffic study indicates that all key intersections operate
acceptably. Therefore, this proposal is feasible from a
Transportation standpoint.
RECOMMENDATION
In reviewing the Value Plastics PUD staff makes the following
findings of fact:
1. The proposed PUD is in substantial conformance with the
approved Timberline Plaza Master Plan.
2. The proposed PUD meets requirements and criteria of the
Industrial Uses and All Development Point Charts of the LDGS.
3. The proposed land use, architecture, and site design are
compatible with the surrounding land uses and buildings.
Therefore, staff recommends approval of Value Plastics PUD at
Timberline Plaza, Preliminary and Final #26-94 with the following
condition:
1. The Planning and Zoning Board approves this planned unit
development final plan upon the condition that the development
agreement, final utility plans, and final P.U.D., plans for
the planned unit development be negotiated between the
developer and City staff and executed by the developer prior
to the second monthly meeting (July 25, 1994) of the Planning
and Zoning Board following the meeting at which this planned
unit development final plan was conditionally approved; or, if
not so executed, that the developer, at said subsequent
Value Plastics PUD at Timberline Plaza - Preliminary and Final,
#26-94
May 23, 1994 P & Z Meeting
Page 3
The use is considered compatible with the surrounding land uses,
which include light industrial, industrial, office, fire station,
apartments, and a high school.
3. Design
The building is proposed to be one story with a maximum height of
301. Construction materials include a combination of masonry and
metal siding in earth tones with white accents and insulated
glazing in pre -finished aluminum frames. The building has been
designed to save energy, reduce operating costs, and create a
pleasant work environment for the employees.
The proposed landscape plan is designed to conserve water through
appropriate plant material selection and other xeriscape practices.
Street trees are included along the entire Timberline frontage,
including the frontage for phase 2. A mixture of deciduous and
coniferous trees and shrubs are provided throughout the site.
Foundation plantings around the building soften the building facade
and anchor it to the ground.
A perimeter security fence is provided around the site. Along
Timberline Road, Eastbrook Drive, and the south border, the fence
is proposed to be decorative metal fence with brick columns.
Between the fire station and existing office building, the fence is
proposed to be chain link. The owners are not certain that the
fence will be necessary, but have requested that it be shown as an
option on the plans in the event that it should become necessary.
Staff recommends that the chain link fence be a dark color, either
vinyl clad, painted, or anodized.
Parking is adequate for the approximate 50 employees. Future
parking expansions can be accommodated on site, and have been shown
for final approval, if necessary.
All signage must be in compliance with the City of Fort Collins
sign code.
All mechanical equipment and trash enclosures will be screened from
pubic view.
4. Neighborhood Compatibility
No neighborhood meeting was held for this request. The proposed
land use is considered compatible with surrounding land uses.
Staff has worked with the applicant to ensure that the site design
and architectural character are compatible with the surrounding
neighborhood of offices and industrial uses.
Value Plastics PUD at Timberline Plaza - Preliminary and Final,
#26-94
May 23, 1994 P & Z Meeting
Page 2
COMMENTS:
1. Background
The surrounding zoning and land uses are as follows:
N: R-H; existing office buildings and Fire Station #10,
S: I-P; NCR and Platte River Power Authority and
R-H; Value Plastics,
E: R-P; New Fort Collins High School and
b-p; Pinecone Apartments PUD,
W: R-H; existing office buildings.
This property was annexed into the City as part of the Greenwalt
Tenth Annexation in 1977. Timberline Master Plan and a preliminary
PUD were approved in 1984 on a portion of this site for industrial
and office uses. The property was subdivided with the Timberline
Plaza PUD subdivision in 1985.
A 25,000 sf, two story, light manufacturing/office building exists
on Lot 1. Construction of Fire Station #10 has begun on a portion
of Lot 3, which was replatted as the Fire Station #10 Minor
Subdivision. The existing Value Plastics building was approved
with the Value Plastics PUD in 1984.
There is one remaining Pad site at the southeast corner of this
PUD. This current proposal for the new Value Plastics building,
includes a request for preliminary approval of this remaining Pad
site for 12,000 square feet of office and manufacturing production.
Typically, industrial uses are processed administratively as an I-
P, Planned Industrial, or I-L, Limited Industrial, Site Plan
Review. In this case, the underlying zoning is R-H, which permits
industrial uses only when reviewed and approved as a PUD.
2. Land Use
The proposed land use of 45,000 square feet of light industrial,
manufacturing and office space is in substantial conformance with
the approved Timberline Plaza Master Plan. The proposal scores 50%
on the Industrial Uses Point Chart of the LDGS, which meets the
minimum criteria of 50%. Points are earned for being part of an
industrial center and for being located on an arterial street.
The proposal also meets all applicable criteria of the All
Development Point Chart of the LDGS, including the neighborhood
compatibility criteria.
ITEM NO. 13
MEETING DATE 5/ 23/ 94
STAFF Kirsten Whetstone
PLANNING AND ZONING BOARD
STAFF REPORT
PROJECT: Value Plastics PUD at Timberline Plaza,
Preliminary and Final, #26-94
APPLICANT: Linda Ripley
Ripley Associates
117 E. Mountain Ave.
Fort Collins, CO 80524
OWNER: Sampson Partnership
3350 Eastbrook
Fort Collins, CO 80525
PROJECT DESCRIPTION:
This is a request for a preliminary and final PUD for a 45,000 sf
manufacturing facility and office on 5.75 acres, located at the
northwest corner of Timberline Drive and Danfield Court, and zoned
RH, High Density Residential.
RECOMMENDATION: Approval with condition
EXECUTIVE SUMMARY:
The applicant proposes a 45,000 sf plastic products manufacturing
facility known as Value Plastics, with office and wholesale
storage, on a 5.75 acre site. The site is lots 3, 4, and 5 of the
Timberline Plaza PUD, designated for industrial and office uses.
Value Plastics is currently located in a smaller building adjacent
to this site. The proposed use, architectural character, and
design are compatible with the surrounding area. The PUD meets
requirements of the Industrial Uses Point Chart and all applicable
criteria of the All Development Point Chart, of the Land
Development Guidance System LDGS .
COMMUNITY PLANNING AND ENVIRONMENTAL SERVICES 281 N. College Ave. P.O. Box 580 Fort Collins, CO 80522-0580 (303) 221-6750
PLANNING DEPARTMENT