Loading...
HomeMy WebLinkAboutVALUE PLASTICS PUD, TIMBERLINE PLAZA (LOTS 3 - 5) - PRELIMINARY / FINAL - 26-94 - CORRESPONDENCE -16. Sidewalks will be required around the perimeter of the site. Any damaged curb, gutter, and walk should be repaired or replaced as part of the project. 17. The property should be replatted to dedicate new utility and access easements, vacate unnecessary easements, and establish lot lines. The plat should be submitted with the PUD to be reviewed simultaneously. 18. Staff recommends that setbacks to the building and parking area along Timberline Road be comparable to the setback approved for the fire station and the existing setbacks at NCR. Parking areas adjacent to streets should be bermed and well landscaped to provide screening and buffering for headlights. 19. A preliminary landscape plan should be part of the submittal. Street trees, foundation plantings, parking lot landscaping, and perimeter berms and landscaping should be addressed. Staff would be particularly concerned about landscape treatment of the backs of buildings, ie the "future offices" and the "molding production cells" section of the expansion/new building. 20. If you do not plan to develop the entire site at one time, you will be required to submit a preliminary plan of the entire site and final plans for phases to be constructed. 21. Preliminary submittal should also include architectural elevations showing approximate building design, materials, colors, scale, heights, roof type, and other architectural details. 6. If you anticipate increasing the size of your water service from the existing 111, you will have to'dig up the old service and abandon it at the main. 7. There are existing utilities, including water and sewer, in the area of the proposed new construction which will have to be relocated. Water and sewer require a 30' utility easement, all lines must be kept a minimum of 15' from buildings. Water can be looped through the property; the important criteria is that you meet fire flow requirements. 8. If you plan to install automatic fire sprinkler systems, there are some building code incentives which may apply. For more information, please contact Sharon Getz at the Building Department (221-6760) or Warren Jones at Poudre Fire Authority (221-6570). 9. A fire hydrant will have to be located on site, please coordinate the location with Warren Jones. 10. The property is located in the Foothills basin. Stormwater development fees are $5501.00 per acre, subject to the amount of impervious surface and on -site detention provided. 11. The ditch along Timberline has limited capacity to carry storm water flows because of over topping of Vermont Drive. You may have to double detain on site to accommodate flows off the property, given the limited capacity and relatively flat fall of the site. 12. A standard submittal of grading and drainage plans, drainage report, and erosion control plans for the construction phase will be required. 13. Street oversizing fees for the proposed use are $5252.00 per acre, pro -rated for the area of new development. 14. Engineering has concerns about the. access on Danfield Court for the new building. scenario. The off -set drives on the north and south sides of Danfield Court create conflicting turning:,; movements. The entrance to "future offices" should eithex;'line up with the entrance to' NCR, splitting the entra€iic& with the existing Value Plastics site, or, the new entrance; should be moved to the east, so as not to overlap with _the entrance to NCR and so as not to create conflicts with the Timberline/Danfield intersection. 15. A traffic study will have to be submitted for the expansion and new construction. The study should detail additional traffic impacts on the surrounding street system. The traffic study should address the entrance drive situation as mentioned above. The traffic study should also look at how the entrances on Eastbrook Drive function. CONCEPTUAL REVIEW STAFF COMMENTS MEETING DATE: April 5, 1993 ITEM: Value Plastics Expansion of existing building or construction of a new building at the northwest corner of Timberline Drive and Danfield Court. APPLICANT: Steve Steinbicker c/o The Neenan Company 2290 E. Prospect Road Fort Collins, CO 80524 LAND USE DATA: This is a proposal for 1) a 24,000 sq. ft. addition to the existing 18,600 sq. ft. Value Plastics building or 2) construction of a new 45,000 sq. ft. building for Value Plastics plus additional buildings for leased office space, parking and landscaping. The existing building is located at the northeast corner. of Danfield Court and Eastbrook Drive, the expansion would primarily occur on the north and east sides of the building. The proposed new building would be located north and. east of the existing building, at the northwest corner of Timberline Dr. and Danfield Ct, just -south of the proposed Fire Station #10. COMMENTS: 1. Light and Power development charges would apply to the new portion of the addition or to the new construction. Development charges are based on street frontage and square footage of the lot or addition area. 2. Please fill out a commercial loading form (C-1) and turn it in to Light and Power. 3: If yow have to relocate the existing transformer, please coorci-biate the new location with Light and Power prior to cons coon. ,� ,,` 4. The property is located in the RH-High Density Residential, Zoning District. The existing Value Plastics was processed as a PUD and therefore the expansion would be an amendment to the final PUD. The new construction would have to be processed as a PUD as well. The proposed land use is compatible with existing land uses in the area and with the general location. 5. You will be required to complete and submit two point charts, one for Industrial Uses and one for the All Development Criteria (see attached). , Commi.-aty Planning and Environmental services Planning Department City of Fort Collins April 6, 1993 Mr. Steve Steinbicker c/o The Neenan Company 2290 E. Prospect Road Fort Collins, CO 80524 Dear Steve: For your information, attached is a copy of the Staff's comments concerning Value Plastics Expansion, presented before the Conceptual Review Team on April 5, 1993. The comments are offered informally by Staff to assist you in preparing the detailed components of the project application. Modifications and additions to these comments may be made at the time of formal review of this project. If you should have any questions regarding these comments or the next steps in the review process, please feel free to call me at 221-6750. Sincerely, Kirsten Whetstone Project Planner KW/gjt Attachments cc: Tom Peterson, Planning Director Kerrie Ashbeck, Civil Engineer Transportation Department Project -Planner File Z 281 North College Avenue • P.O. Box 580 • Fort Collins, CO 80522-0580 • (303) 221-6750