HomeMy WebLinkAboutVALUE PLASTICS PUD, TIMBERLINE PLAZA (LOTS 3 - 5) - PRELIMINARY / FINAL - 26-94 - CORRESPONDENCE - STAFF'S PROJECT COMMENTS- The plan needs to be made more readable, and easier to understand, you may want to consider providing a seperate grading plan, to make the drainage plan less congested. - Please detail the confluence of the outlet pipe and the swale, will rip -rap protection be provided?- - Please show all storm drainage facilities on the overall utility plan, include size type and reference appropriate detail sheet. Please use different symbols for storm, water or sewer lines. - Please provide for an emergency overflow spillway for the detention pond. - If you have any questions or concerns regarding this review, feel free to contact the stormwater utility for clairification. Fort Collins PROJECT COMMENT SHEET 5 April 1994 PROJECT: DEPARTMENT: �'l�Z,lL. TIMBERLINE PLAZA PUD, Lots VALUE PLASTICS PLANNER: Kirsten Whetstone Please respond to this project by Friday, April 15,1994 ❑ No Problems ❑/Problems or concerns (see below) - Please provide a detailed profile of the pond drain pipe, including the hydraulic grade line. - Please add a drainage summary table to the gradingand drainage plan. Include the basin areas, composite runoff coefficients, and respective discharges. - The maintenance responsibility note #12 should appear on the grading and drainage plan as well. - Please include an end section detail with the drainage and erosion control details. - Easements need to be dedicated for the swales and the detention facility. (over, please). Date: I d- Signature: CHECK IF YOU WISH TO RECEIVE ❑ PLAT COPIES OF REVISIONS: 13 SITE ❑ LANDSCAPE O UTILITY ENVIRONMENTAL- SERVICES 281 NORTH COLLEGE P.O.BOX 580 FORT COLLINS, COLORADO 30522-0580 (303)221-6750 PLANNING DEPARTMENT streetscape. is. Please show some height dimensions on the elevations. Please label typical glass areas? 19. The plat will be approved by the Planning and Zoning Board and signed by the Secretary of the Planning and Zoning Board, not the Director of Planning. The title of the plat should include the initials PUD or Planned Unit Development. 20. Staff believes that the circulation system in the area of the garages is awkward. It may be that the interim curb lines are confusing to some. 21. The title of the PUD should be as an amended preliminary and final PUD. The Planning Objectives should state what is being amended from the approved preliminary and should address the proposed future expansion areas, to the north, west and south of.the main building. This concludes staff comments at this time. In order to stay on schedule for the May 23, 1994 Planning and Zoning Board hearing, please note the following deadlines: Plan revisions are due May 6th by 8:30 am for Final Review (3 sets of plans and written documentation responding to the above concerns), PMT's (one PMT of each plan sheet), colored renderings, and 8 prints are due May 16th. Final mylars and other documents are due as soon as possible following the hearing. Please be aware that the development agreement and utility plans must be signed prior to the Planning and Zoning Board Hearing, for all PUD's. If not, a condition will be placed on the project giving you 30 days to finalise the plans and agreement,. after which time, you must submit a request for an extension, to the Planning and Zoning Board. If you have any questions about these comments or would like to schedule a time to meet to discuss them, please contact me at 221- 6750. sincerely, Kirsten Whetstone, AICP Project Planner cc Kerrie Ashbeck, Engineering Department Maurice Lutkin (Water Waste and Land) r 6. According to the Poudre Fire Authority, if a building is greater than 5,000 sf, then an automatic fire sprinkler system must be installed. As an alternative, you may be able to divide the building up into areas that are less than 5,000 sf. Please contact Mike Pretz at the Fire Authority (221-6579) for more information. 7. The site shall be accessible to persons with disabilities in accordance with UBC Section .3103 and UBC Appendix Section 3106. Provide designated and marked accessible routes between the building and the public way and accessible parking and building. Provide parking and signs per Appendix Section 3107. 8. Storage or use of hazardous materials must be in compliance with the Fire Code and Chapter 9 of the 1991 UBC asadoptedby the City of Fort Collins. A list of such materials with quantities and classifications should be submitted for review at the time of building permit application. 9. Allowable floor area of the building must comply with Section 505 of the UBC. 10. Staff requests additional bicycle parking, for employees, be provided for in a convenient, safe, and protected area. 11. You will be responsible for re -striping the Vermont and Timberline intersections as per the traffic study recommendations. 12. The Eastbrook driveway should align with the opposite curb cut. Please contact Tom Vosburg at the Transportation Division (221-6608) if you have problems or questions with this. 13. On the plat, the monumentation used/found/set must be described. 14. Natural Resources has concerns about noise, air pollution, and odor problems. Please respond to these concerns. 15. Please include a fence detail on the site plan. 16. Foundation plantings should be provided on the north side of the garages. Would it be possible to provide low foundation plantings along the glassy north side of the building? 17. Staff requests that all Timberline Road landscaping, especially street trees, be planted at the time of development of this phase. Staff also requests that additional landscaping, including evergreen trees, be provided along Timberline Road and Eastbrook Drive (see redlined plan). Additional trees and shrubs should be added to the parking lot landscaping. A berm along Eastbrook Drive would enhance that Commi y Planning and Environmental rvices Planning Department April 28, 1994 Linda Ripley Ripley Associates 3555 Stanford Road, Suite 105 Fort Collins, CO 80525 Dear Ms. Ripley, City Staff has reviewed your submittal for Value Plastics PUD- Preliminary and Final, and offers the following written comments: 1. Review of these plans should not be construed as a commitment that telephone facilities sufficient to serve this project are presently available. US West will provide telephone service in accordance with the rates and tariffs on file with the Colorado Utilities commission. 2. The owner is responsible for provision of all conduit, ditch, and street crossings for telephone facilities within the project, and the owner provides terminal room space and power for the main terminal at one building, generally in a janitor's closet or utility room. The owner's vendor provides all facilities beyond the main terminal. Contact the US WEST engineer, Susan Peterson, for conduit specifications for the main telephone entrance cable.. 3. Any relocation of existing telephone facilities required by these plans will be paid for by the developer. The telephone pedestals shown on the utility plans connect a conduit structure to be used for this site and the adjacent fire station. US WEST will consent to vacate the existing utility easements after this conduit structure has been replaced with a new one at a mutually agreed upon location. 4. Please see attached comment sheet for Stormwater Utility comments. These comments are new, and were not part of the first set of comments sent to you. 5. Water and Wastewater redlined the plat and utility plans. These redlines were forwarded to your engineer. They also have requested a note on the landscape plan that a minimum of 10' of distance be maintained between trees and water meters/pit/curb stops/etc. This distance shall be 4' for shrubs. 281 North College Avenue • P.O. Box 580 • Fort Collins, CO 80522-0580 • (303) 221-6750