Loading...
HomeMy WebLinkAboutVALUE PLASTICS PUD, TIMBERLINE PLAZA (LOTS 3 - 5) - PRELIMINARY / FINAL - 26-94 - CORRESPONDENCE - RESPONSE TO STAFF REVIEW COMMENTSRipley Associates Response to Staff Comments Value Plastics PUD Page2 11. We understand the owner is responsible for re -striping the Vermont and Timberline intersections. 12. It is my understanding that after further discussion between Steve Steinbicker, Tom Vosborg and/or Mike Herzig that the City will allow the driveways to remain as shown, given the need for semi -trucks to access the site. Please let us know immediately if this is not the case. 13. Maurice Lutkin is correcting the plat. 14. The new facility will be very similar to the existing facility in that it will not create noise pollution, air pollution or create odor problems. Natural Resources is welcome to tour the existing facility to see and smell for themselves. They may contact Kent or Gloria Sampson to arrange for a tour. 15. Fence details have been included on the site plan. 16. Foundation plantings have been provided on the north side of the garage. 17. Street trees have been provided all along the Timberline Road frontage. 18. Height dimensions have been provided on the elevation drawing. 19. Maurice Lutkin has change the title block on the plat. 20. The site plan in this area was purposely designed to allow for extra room to maneuver large trucks on the site. 21. The title of the PUD has been changed to reflect the "Amended" status. If you have any questions regarding the revisions or these comments, please call. Sincerely, RIPLEY ASSOCIATES 60 Z Z1, t, Linda Ripley Principal xc: Steve Steinbicker, The Neenan Company Maurice Lutkin, Water, Waste and Land, Inc. May 5, 1994 Ms. Kirsten Whetstone Project Planner Planning Department 281 North College Avenue Fort Collins, CO 80524 Re: Response to staff comments - Dear Kirsten: Value Plastics Amended Preliminary/Final P.U.D. We have reviewed staff comments dated April 28, 1994, and have the following comments: 1. We understand US West will provide telephone service in accordance with the rules of the Colorado Utilities Commission. 2. We understand .that the developer is responsible for provision of all conduit, street crossings, and ditch crossings for telephone facilities within the project and that the owner provides terminal room space and power for the main terminal at one building. The owner's vendor provides all facilities beyond the main terminal. 3. Telephone utility easements will be coordinated. 4,5. Maurice Lutkin of Water, Waste and Land Inc. will be providing responses to stormwater, water, wastewater and engineering comments. 6. The building will be equipped with a fire sprinkler system. 7. It is our intention to comply with accessibility requirements. Please let us know if we are not in compliance. 8. Storage or use of hazard materials will be in compliance with the City Code and Chapter 9 of the 1991 UBC. 9. The project Architect, Steve Steinbicker, understands that the allowable floor area of the building must comply with Section 505 of the UBC. 10. Twelve bicycle parking spaces have been provided at a location that is most convenient to the employee entrance.