Soil Classification
Criteria for Assigning Group Symbols and Group Names Using Laboratory Testy
Group
Group Name a
Symbol
Coarse -Grained
Soils more than
Gravels more than
50% of coarse
Clean Gravels Less
than 5% finest
Cu > 4 and 1 < Cc <3'
GW
Well -graded gravel'
50% retained on
fraction retained on
No. 200 sieve
No. 4 sieve
Cu < 4 and/or 1 > Cc > 3E
GP
Poorly graded gravel`
Gravels with Fines
more than 12% fines°
fines classifyas ML or NIH
GM
Silty gravel,G,H
Fines classify as CL or CH
GC
Clayey gravel`0"
Sands 50% or more
Clean Sands Less
Cu > 6 and 1 < Cc < 3E
SW
Well -graded sand'
of coarse fraction
than 5% finese
passes No. 4 sieve
Cu < 6 and/or 1 > Cc > 3E
SP
Poorly graded sand'
Sands with Fines
Fines classify as ML or MH
SM
Silty sand°M•'
more than 12% fines°
Fines Classify as CL or CH
SC
Clayey sand"'
Fine -Grained Soils
Silts and Clays
inorganic
PI > 7 and plots on or above "A line'
CL
Lean clay".L."
50% or more
Liquid limit less
passes the
than 50
PI < 4 or plots below "A" line'
ML
Silt".`"
No. 200 sieve
organic
Liquid limit - oven dried
Organic clay"La•v
< 0.75
OL
Liquid limit - not dried
Organic silt"•� o
Silts and Clays
inorganic
PI plots on or above "A" line
CH
Fat clay"-L'a
Liquid limit 50
or more
PI lots below "A" line
MH
Elastic Silt".L"
organic
Liquid limit - oven dried
Organic clay'LL'a.P
< 0.75
OH
Liquid limit - not dried .
Organic silt"'La'-°
Highly organic soils Primarily organic matter, dark in color, and organic odor
ABased on the material passing the 3-in.
(75-mm) sieve
_
.zCu=Daa/D,g Cc - fD101
'If field sample contained cobbles or
D_0 x DGd
boulders, or both, add "with cobbles or
boulders, or both" to group name-
cGravels with 5 to 12% fines require dual
'If soil contains > 15% sand, add "with
symbols:
sand" to group name.
GW-GIM well -graded gravel with silt
'if fines classify as CL-ML, use dual symbol
GW-GC well -graded gravel with clay
GC -GM, or SC-SM.
GP-GIM poorly graded gravel with silt
"If fines are organic, add "with organic fines"
GP -GC poorly graded gravel with clay
to group name.
°Sands with 5 to 12% fines require dual
'If soil contains > 15% gravel, add "with
symbols:
gravel" to group name.
SW-SM well -graded sand with silt
'If Atterberg limits plot in shaded area, soil is
SW -SC well -graded sand with clay
a CL-ML, silty clay.
SP-SM poorly graded sand with silt
SP-SC poorly graded sand with clay
a
10
7
a
°
PT Peat
"If soil contains 15 to 29% plus No. 200, add
"with sand" or "with gravel", whichever is
predominant.
Llf soil contains > 30% plus No. 200
predominantly sand, add "sandy" to group
name.
"If soil contains > 30% plus No. 200,
predominantly gravel, add "gravelly" to group
name.
"PI > 4 and plots on or above "A" line.
°PI < 4 or plots below "A" line.
'PI plots on or above "A" line.
'PI plots below "A" line.
For classification of fine-grained soils
and Iln►grained fraction of coarse-
I /i
grained soils
Equation if 'A" - Tine
I
Hgn<ontal at Pt . a to LL " 255.
men Pl " 0.73 ILL 20)
,J /' \IT,�Z11
j Eouanon of •U" - lino
Vertical at LL " 16 To PI . 7, /
man PI . 0.91Ll el
G
MHoftOHl
�I
r CL ML
IMLoaOIL
r I I I
I
0 10 16 20 30 40 5o 60 70 6o 90 100 110
LIQUID LIMIT (LL)
a ' f,--; elC a>�yf7 0 a -, C Y
DRILLING AND EXPLORATION
DRILLING & SAMPLING SYMBOLS:
SS : Split Spoon - 13." I.D., 2" O.D., unless otherwise noted PS : Piston Sample
ST : Thin -Walled Tube - 2" O.D., unless otherwise noted WS : Wash Sample
R : Ring Barrel Sampler - 2.42" I.D., 3" O.D. unless otherwise noted.
PA : Power Auger FT : Fish Tail Bit
HA : Hand Auger RB : Rock Bit
DB : Diamond Bit = 4", N, B BS : Bulk Sample
AS : Auger Sample PM : Pressure Meter
HS : Hollow Stem Auger DC : Dutch Cone
WB : Wash Bore
Standard "N" Penetration: Blows per foot of a 140 pound hammer falling 30 inches on a 2-inch O.D. split spoon, except where
noted.
WATER LEVEL MEASUREMENT SYMBOLS
WL Water Level WS : While Sampling
WCI : Wet Cave in WD : While Drilling
DCI : Dry Cave in BCR : Before Casing Removal
AS : After Boring ACR : After Casting Removal
Water levels indicated on the boring logs are the levels measured in the borings at the time indicated. In pervious soils, the
indicated levels may reflect the location of groundwater. In low permeability soils, the accurate determination of groundwater
levels is not possible with only short term observations.
DESCRIPTIVE SOIL CLASSIFICATION
Soil Classification is based on the Unified Soil Classification
system and the ASTM Designations D-2487 and 0-2488.
Coarse Grained Soils have more than 50% of their dry
weight retained on a #200 sieve; they are described as:
boulders, cobbles, gravel or sand. Fine Grained Soils have
less than 50% of their dry weight retained on a #200 sieve;
they are described as: clays, if they are plastic, and silts if
they are slightly plastic or non -plastic. Major constituents
may be added as modifiers and minor constituents may be
added according to the relative proportions based on grain
size. In addition to gradation, coarse grained soils are
defined on the basis of their relative in -place density and
fine grained soils on the basis of their consistency.
Example: Lean clay with sand, trace gravel, stiff (CL); silty
sand, trace gravel, medium dense ISM).
CONSISTENCY OF FINE-GRAINED SOILS
Unconfined Compressive
Strength, Qu, psf Consistency
<
500
Very Soft
500 -
1,000
Soft
1,001 -
2,000
Medium
2,001 -
4,000
Stiff
4,001 -
8,000
Very Stiff
8,001 -
16,000
Very Hard
RELATIVE DENSITY OF COARSE -GRAINED SOILS:
N-Blows/ft
Relative Density
0-3
Very Loose
4-9
Loose
10-29
Medium Dense
30-49
Dense
50-80
Very Dense
80 +
Extremely Dense
PHYSICAL PROPERTIES OF BEDROCK
DEGREE OF WEATHERING
Slight
Slight decomposition of parent material on
joints. May be color change.
Moderate
Some decomposition and color change
throughout.
High
Rock highly decomposed, may be extremely
broken.
HARDNESS AND DEGREE OF CEMENTATION:
Limestone and Dolomite:
Hard
Difficult to scratch with knife.
Moderately
Can be scratched easily with knife,
Hard
Cannot be scratched with fingernail.
Soft
Can be scratched with fingernail.
Shale, Siltstone and Claystone:
Hard
Can be scratched easily with knife, cannot
be scratched with fingernail.
Moderately
Can be scratched with fingernail.
Hard
Soft
Can be easily dented but not molded with
fingers.
Sandstone and Conglomerate:
Well
Capable of scratching a knife blade.
Cemented
Cemented Can be scratched with knife
Poorly Can be broken apart easily with fingers
Cemented
AAMCO TRANSMISSION CENTER
3737 SOUTH MASON
PROJECT NO: 1942035 FORT COLLINS, COLORADO DATE: MAY 1994
LOG OF TEST PIT TP-2
SHEET 1 of 1
RIG TYPE: CASE 550
#.<#s;:::>:;_.«>:}:z4{s„?:a..>•4.::.x;<.z.. ,,.,, . z«<x,>:.<:<'
:,..1:::;.:<t,».>..:..s a::..:::.v;i<> kx;;s,.>lo.:::.<.,,:,,..:;:
WATER
DEPTH
ELEV
FOREMAN: RLD
START DATE
4/28/94
WHILE DRILLING
NONE
AUGER TYPE: 4" CFA
FINISH DATE
4/28/94
AFTER DRILLING
NONE
SPT HAMMER: MANUAL
SURFACE ELEV
24 HOUR
N/A
SOIL DESCRIPTION
D
N
QU
MC
DO
a,-UMrrs
-zoo
SWELL
LL
PI
PRESSURE
%SOOPSF
TYPE
IFEEn
(SLOWSIM
RSF,
1%1
IPCFI
l%i
LIGHT BROWN SANDY LEAN CLAY (CL),
moist, medium stiff, Fill
LIGHT BROWN SANDY LEAN CLAY (CL),
moist, medium stiff
Calcareous deposits, Fill
LIGHT BROWN SANDY LEAN CLAY
(CL), moist, medium stiff,
5
(Possible Fill)
LIGHT BROWN SANDY LEAN CLAY (CL),
moist, medium stiff
_ _
Calcareous De osits
10
15
20
25
"uE UE "E 47d1„�..,,..y ............_..._
AAMCO TRANSMISSION CENTER
3737 SOUTH MASON
PROJECT NO: 1942035 FORT COLLINS, COLORADO DATE: MAY 1994
LOG OF TEST PIT TP-1
SHEET 1 OF 1
RIG TYPE: CASE 550
,�;..:;eti::<::• ::>>.:..;,,..::.< nEx•):.:...:
v.,;;;<zz:��::ax�::>'s«>>k�;>?;_>:`:.:a;s�pA!iy4.iS::C�vv,}3ti:s�n:
START DATE
4/28/94
WATER
WHILE DRILLING
DEPTH
NONE
ELEV
FOREMAN: RLD
AUGER TYPE: 4" CFA
FINISH DATE
4/28194
AFTER DRILLING
NONE
SPT HAMMER: MANUAL
SURFACE ELEV
24 HOUR
N/A
SOIL DESCRIPTION
D
N
QU
MC
DD
A -LIMBS
•200
SWELL
LL
PI
PRESSURE
%5W PSF
TYPE
IFEETI
ISLOWSIFTI
OsFI
1%I
(PUF)
1%1
LIGHT BROWN SILTY LEAN CLAY (CL),
_
moist, medium stiff
Concrete & Asphalt Cobbles ,Fill
_
LIGHT BROWN SANDY LEAN CLAY (CL),
moist, medium stiff
Calcareous Deposits, (Fill)
5
LIGHT BROWN SANDY LEAN CLAY (CL),
moist, medium stiff
Calcareous Deposits
(Possible Fill)
LIGHT BROWN SANDY LEAN CLAY (CL),
moist, medium stiff
_ _
Calcareous de osits
10
BOTTOM OF TEST PIT 7' 5".
15
20
25
art
nnlneennn
onsu tams
AAMCO TRANSMISSION CENTER
3737 SOUTH MASON
PROJECT NO: 1942035 FORT COLLINS, COLORADO DATE: APRIL 1994
LOG OF BORING B-2
SHEET 1 OF 1
RIG TYPE: DIETRICH D-50
<.:»...;i;ii`;a;;:F.v..;iu:>v".tkc:�c`:3^a<:`.".'ctcia'.iov
<:>i>�:.�:�:,:;ia�:i::>.:.s��:�aEfi�:�;sz><:s;:;tx;.•izE.';;.:t»a<>.>.a�,s>.
t\.2`:2$:
WATER
DEPTH
ELEV
FOREMAN: SCK
START DATE
4/28/94
WHILE DRILLING
9 feet
AUGER TYPE: 4" CFA
FINISH DATE
4/28/94
AFTER DRILLING
9 feet
SPT HAMMER: MANUAL
SURFACE ELEV
24 HOUR
N/A
SOIL DESCRIPTION
TYPE
D
(FEETI
N
I MLMS
QU
inn
MC
M
DD
(KF)
A-UMITS
-200
M
SWELL
LL
%
FH Wum
%5M MF
BROWN GRAVELLY SANDY CLAY (CL),
moist, medium stiff, SS
Fill
SS
SS
_
5
16
17.3
20
14.0
33
15
62.4
10
16
15.1
MOTTLED GRAY BROWN ORANGE
SANDY CLAY (CL), moist, medium stiff SS
(RESIDUAL)
21
20.9
SS
ORANGE BROWN GRAY SANDSTONE
slightly hard, plastic, highly weathered
Grades to Brown
SS
26
22.2
_ _
15
25/2"
19.6
BOTTOM OF BORING 14' 2".
20
ac
AAMCO TRANSMISSION CENTER
3737 SOUTH MASON
PROJECT NO: 1942035 FORT COLLINS, COLORADO DATE: APRIL 1994
LOG OF BORING B-1
SHEET 1 OF 1
RIG TYPE: DIETRICH D-50
cK3f#g^€i i` >? < :t Xt'E�?: i `>.1:??
WATER
DEPTH
ELEV
FOREMAN: SCK
START DATE
4/28/94
WHILE DRILLING
10 feet
AUGER TYPE: 4" CFA
FINISH DATE
4/28/94
AFTER DRILLING
10 feet
SPT HAMMER: MANUAL
SURFACE ELEV
24 HOUR
N/A
SOIL DESCRIPTION
TYPE
D
IFEETI
N
OLO SM)
OU
inn
MC
M
DO
jMF1
A -LINKS
200
1%1
SWELL
LL
N
PMESSUPE
%SOO PSF
6" TOP SOIL & VEGETATION
BROWN SANDY CLAY (CL),
moist, medium stiff SS
Fill
_
5
14
13.5
37
16
71.4
<500
NONE
LIGHT BROWN SANDY CLAY (CL),
moist, medium stiff SS
Fill
18
10.6
BROWN GRAVELLY SANDY CLAY (CL),
moist, medium stiff SS
Fill
_
10
18
15.0
MOTTLED ORANGE BROWN
GRAVELLY SANDY CLAY (CL),
moist, medium stiff RESIDUAL
SS
11
25.9
SS
ORANGE BROWN SANDSTONE
slightly hard, plastic, highly weathered
SS
16
28.0
_
_
15
25/3"
20.1
BOTTOM OF BORING 14' 3".
20
25
6 -Z
PRo�s� I�uswsraCi-�pA
tt IO
r7P- 1
Lo—r
lz l
r
;
0
d
BORING LOCATION DIAGRAM
LOT #10 - 3737 SOUTH MASON
Ll
0
n
C
NOT TO SCALE
FORT COLLINS, COLORADO
APRIL 1994
Earth Engineering Consultants, Inc.
Proposed AAMCO Transmission Center
Project No. 1942035
Page 8
GENERAL COMMENTS
The analysis and recommendations presented in this report are based upon the data obtained
from the soil borings performed at the indicated locations and from any other information
discussed in this report. This report does not reflect any variations which may occur between
borings or across the site. The nature and extent of such variations may not become evident
until construction. If variations appear evident, it will be necessary to re-evaluate the
recommendations of this report.
It is recommended that the geotechnical engineer be retained to review the plans and
specifications so that comments can be made regarding the interpretation and implementation of
our geotechnical recommendations in the design and specifications. It is further recommended
that the geotechnical engineer be retained for testing and observations during earthwork and
foundation construction phases to help determine that the design requirements are fulfilled.
This report has been prepared for the exclusive use of Cottier Construction for specific
application to the project discussed and has been prepared in accordance with generally accepted
geotechnical engineering practices. No warranty, express or implied, is made. In the event that
any changes in the nature, design or location of the project as outlined in this report are planned,
the conclusions and recommendations contained in this report are planned, the conclusions and
recommendations contained in this report shall not be considered valid unless the changes are
reviewed and the conclusions of this report modified or verified in writing by the geotechnical
engineer.
Earth Engineering Consultants, Inc.
Proposed AAMCO Transmission Center
Project No. 1942035
Page 7
Fill materials required to develop the floor slab or pavement subgrades should consist of
approved, low volume change materials, free from organic matter and debris. Normally, soils
with a liquid limit of 40 or less and plasticity index of 18 or less could be ,used as low volume
change materials. Those soils should be placed in loose lifts not to exceed 9 inches thick,
adjusted moisture content as recommended for the scarified soils and compacted to at least 95 %
of the materials standard Proctor maximum dry density.
After completion of the subgrades, care should be taken to avoid disturbing the in -place
materials. Materials which are loosened or disturbed by the construction activities should be
removed and replaced or, if possible, reworked in place prior to placement of floor slabs and
pavements.
OTHER CONSIDERATIONS
Positive drainage should be developed away from the proposed building and across and away
from the pavement edges. Water allowed to pond on or adjacent to the pavements could result
in wetting of the pavement subgrades and premature failure of the pavement section. Water
allowed to pond on or adjacent to the structure could result in wetting and softening of the
bearing soils and excessive settlement of the building.
Care should be taken in completing excavations required for installation of site utilities. Side
slopes on the excavations should be developed to provide stable excavations. Based on the
materials observed at the boring locations, we estimate slopes no steeper than 2 horizontal to 1
vertical would be relatively stable for short term construction activities in shallow excavations.
Longer term excavations or deep excavations should be evaluated on an individual basis.
Earth Engineering Consultants, Inc.
Proposed AAMCO Transmission Center
Project No. 1942035
Page 6
Care should be taken during construction to avoid disturbing the anticipated foundation bearing
materials. Materials which are loosened or disturbed by the construction activities or materials
which are dry and desiccated or wet and softened and should be removed from the foundation
excavations prior to placement of the reinforcing steel and foundation concrete.
Supporting the footing foundations on the in -place fill materials represents a risk of post -
construction settlement caused by unacceptable materials which are not discovered during the
building construction. With the close observation and testing recommended above and based on
results of the test pit and field borings, we expect the risk of unacceptable performance to be
small. We estimate the long term settlement of footing foundations designed and constructed as
recommended above would be less than 3/4 inch. Design of a relatively stiff footing could help
reduce the potential for differential settlement.
FLOOR SLAB AND PAVEMENT SUBGRADE
Based on the materials observed at the test pit and boring locations, we expect the floor slabs
and pavements could also be supported on the in -place fill soils. The same cautions as
enumerated for the footings regards to possible zones of loose or unacceptable materials would
apply to the floor slab and pavement areas. To help locate any near surface soft and/or loose
materials, we recommend the building and pavement areas be proofrolled with heavy
construction equipment. Proofing should consist of several mutually perpendicular passes over
the exposed subgrades using heavy construction equipment, such as a fully loaded tandem axle
dump truck weighing not less than 40,000 pounds. Materials which appear to be loose or soft
upon proofrolling should be removed or reworked in place prior to placement of additional fill,
floor slabs or pavements.
After proofrolling, we recommend the exposed subgrades be scarified to a minimum depth of
9 inches, adjusted in moisture content and compacted to at least 95% of the materials maximum
dry density as determined in accordance with ASTM Specification D-698, the standard Proctor
procedure. The moisture content of the cohesive site soils should generally be adjusted to be
within the range of ±2% of standard Proctor optimum moisture.
's�
Earth Engineering Consultants, Inc.
Proposed AAMCO Transmission Center
Project No. 1942035
Page 5
or construction of a post -tensioned slab -on -grade structure. We would be pleased to provide
more detailed alternative recommendations at your request.
FOOTING FOUNDATIONS
Based on the materials observed at the test pit and boring locations, we expect that footing
foundations could be supported on the in -place fill soils. As an alternative, the footings could
be extended through the near surface fill soils to bear the natural, stiff to very stiff sandy clay.
For design of footing foundation bearing on either the near surface fill materials or underlying
cohesive soils, we recommend using a net allowable total load soil bearing pressure not to
exceed 1500 psf. The net bearing pressure refers to the pressure at foundation bearing level in
excess of the minimum surrounding overburden pressure. Total load implies full dead and live
loads.
Exterior foundations and foundations in unheated areas should be located a minimum of 30
inches below adjacent exterior grade to provide frost protection. We recommend formed
continuous footings have a minimum width of 16 inches and isolated column foundations have
a minimum width of 30 inches. Because of the need to closely observe and test the in -place
bearing materials at the time of construction, we recommend trenched foundations (grade beam
foundations) not be utilized.
To further evaluate the foundation support soils, we recommend the anticipated bearing materials
(both native and fill soils) be closely observed and tested at the time of construction. As a
minimum, hand auger borings should .be completed at regular intervals along continuous footing
lines and at each column location. Those hand auger borings should extend to a depth equal to
at least one footing width below the anticipated bearing level. If objectionable materials are
encountered, it may be necessary to extend the footings to bear below the objectionable material
or those materials should be removed and replaced with properly placed and compacted fill.
Recommendations can be provided at the time of construction if overexcavation and backfill
procedures become necessary.
Earth Engineering Consultants, Inc.
Proposed AAMCO Transmission Center
Project No. 1942035
Page 4
WATER LEVEL OBSERVATIONS
Observations were made while drilling and after completion of the borings to detect the presence
and level of free water. Water was observed at depths of approximately 9 to 10 feet in the two
test borings. Based on those field observations, we expect the depth to the hydrostatic
groundwater table was near that approximate depth at the time of drilling. Groundwater is
commonly encountered as perched water above less permeable weathered bedrock. The location
and amount of groundwater and/or perched water can vary over time depending on variations
in hydrologic conditions and other conditions not apparent at the time of this report.
ANALYSIS AND RECOMMENDATIONS
GENERAL
The near surface materials encountered at the project site consist of low plasticity cohesive fill
soils which were reportedly placed without moisture and density control. Based on the testing
and field observations completed as a part of this exploration, the fill soils appear to be relatively
uniform and consistent without apparent voids or pockets of debris. Those materials also appear
to be relatively compact.
Recommendations are provided in this report for support of the structure using conventional
footing foundations supported on the in -place fill materials. Placement of footings of the fill
soils involves a risk of unacceptable performance subsequent to construction from undiscovered
voids or deleterious materials within the fill remaining left in place beneath the structure. Close
observation and testing during construction will reduce the risk of unacceptable post -construction
performance. Alternate recommendations are also provided for support of the footing
foundations on the in -place natural soils which were encountered beneath the fill materials. This
procedure could be used to reduce the risk of settlement of the building structure although a risk
would still remain in the floor slab and pavement areas. Recommendations for alternative
preparation procedures can be provided if it is desired to further reduce or eliminate the risk of
poor performance from the in -place fill materials. Those alternatives could include a deep
foundation system, removal and replacement of all fill materials beneath the construction areas,
Earth Engineering Consultants, Inc.
Proposed AAMCO Transmission Center
Project No. 1942035
Page 3
on visual and tactual observation of disturbed samples and auger cuttings. Coring and/or
petrographic analysis may reveal other rock types.
SITE AND SUBSURFACE CONDITIONS
The AAMCO Transmission Center will be located at 3737 South Mason Street in Fort Collins,
Colorado. Four to five feet of fill has reportedly been placed on the lot over the past 10 years.
The fill was placed without moisture -density control and was reportedly placed in thin lifts over
a period of time. Site drainage is presently slightly towards the west with maximum difference
in ground surface elevations across the site on the order of 2 feet.
An EEC field geologist was on site during excavation of the test pits and completion of the field
borings. The EEC field geologist maintained a record of the materials encountered based on
visual and tactual observation of disturbed samples and auger cuttings. Final boring logs
included with this report may contain modifications to those field logs based on the results of
laboratory testing and laboratory engineering evaluation. Based on results of the field borings
and laboratory testing, subsurface conditions can be generalized as follows.
Approximately 4 to 7 feet of fill material was encountered at the surface at the test locations.
Those fill materials consisted of sandy clay with varying amounts of gravel. The fill material
appeared to be relatively uniform and large voids or deposits of debris were not observed in the
borings or test pits. The fill soils were underlain by brown and light brown sandy clay. The
cohesive materials contained occasional calcareous deposits and varying deposits of gravel.
Those soils extended to the bottom of the test pits, at depths of approximately 7 1/2 feet. The
cohesive soils extended to depths of approximately 10 to 12 feet in the test borings. The cohesive
soils were underlain by brown and gray highly weathered sandstone at those locations. The
sandstone was poorly cemented and could be drilled using the standard auger drilling equipment.
The stratification boundaries shown on the boring logs represent the approximate locations of
changes in soil and rock types; in -situ, the transition materials may be gradual and indistinct.
Earth Engineering Consultants, Inc.
Proposed AAMCO Transmission Center
Project No. 1942035
Page 2
locations should be considered accurate only to the degree implied by the methods used to make
those field measurements.
The borings were performed with a truck mounted, rotary type drill rig equipped with a
hydraulic head employed in drilling and sampling operations. The boreholes were advanced
using 4-inch nominal diameter continuous flight augers and samples of the subsurface materials
encountered in the borings were obtained using split barrel sampling procedures. In the split
barrel sampling procedure, a standard 2-inch OD split barrel sampling spoon is driven into the
ground by means of a 140 pound hammer falling a distance of 30 inches. The number of blows
required to advance the split barrel sampler is recorded and is used to estimate the in -site relative
density of cohesionless soils and, to a lesser degree of accuracy, the consistency of cohesive
materials. All samples obtained in the field were sealed and returned to the laboratory for
further examination, classification and testing.
Two test pits were excavated to depths of approximately 8 feet using a rubber tired backhoe.
The test pit excavations were logged in the field by EEC personnel and disturbed samples of the
materials encountered were obtained from the excavated materials. Those samples were also
returned to laboratory for further examination, classification and testing.
The laboratory testing for this project included moisture content tests on each of the recovered
samples. In addition, a calibrated hand penetrometer was used to approximate the unconfined
strength of selected samples. Atterberg limits and washed sieve analysis tests were also
performed on selected samples. A swell consolidation test was performed on one selected
sample to evaluate the potential for the site material to change volume with variation in moisture
content. Results of the outline tests are shown on the attached boring logs.
As a part of the testing program, all samples were examined in the laboratory by an engineer
and classified in accordance with the attached General Notes and the Unified Soil Classification
System, based on the soil's texture and plasticity. The estimated group symbol for the Unified
Soil Classification System is shown on the boring logs and a brief description of that
classification system is included with this report. The classification of the bedrock was based
SUBSURFACE EXPLORATION REPORT
PROPOSED AAMCO TRANSMISSION CENTER
FORT COLLINS, COLORADO
EEC Project No. 1942035
INTRODUCTION
The subsurface exploration for the proposed AAMCO Transmission Center at 3737 South Mason
in Fort Collins, Colorado has been completed. Two (2) soil borings extending to depths of
approximately 15 feet below present site grades were advanced in the proposed building area to
develop information on existing subsurface conditions. In addition, two (2) test pits were
excavated to depths of approximately 8 feet to further evaluate the composition and consistency
of the near surface fill soils. Individual boring/test pit logs and a diagram indicating the
approximate test locations are included with this report.
We understand the proposed AAMCO Transmission Center will be a single story, slab -on -grade
masonry building. Foundation loads for this structure will be light with continuous wall loads
less than 3 kips per lineal foot and column loads less than 30 kips. Grade changes of less than
2 feet are expected to develop the final site grades. Paved drive and parking areas will be
constructed as a part of this development. We expect those pavements to be used predominantly
by automobiles and light trucks and the traffic volume will be relatively light.
The purpose of this report is the describe the subsurface conditions encountered in the borings,
analyze and evaluate the test data and provide geotechnical recommendations concerning design
and construction of the foundations and support of floor slabs and pavements.
EXPLORATION AND TEST PROCEDURES
The boring and test pit locations were selected in the field by Earth Engineering Consultants,
Inc. (EEC) personnel. The field locations were determined by pacing and estimating angles
from the references indicated on the attached boring location diagram. The boring/test pit
i
Earth Engineering Consultants, Inc.
-Cottier Construction
May 13, 1994
Page 2
We appreciate the opportunity to be of service to you on this project. If you have any questions
concerning the enclosed report, or if we can be of further service to you in any other way,
please do not hesitate to contact us.
Very truly yours,
Earth Engineering Consultants, Inc.
Lester L. Litton, P.E.
Colorado No. 23957
Reviewed by:
Curtiss L. Palin, P.E.
Colorado No. 27315
I DI
EARTH ENGINEERING
CONSULTANTS, INC.
May 13, 1994
Cottier Construction
P.O. Box 1051
Fort Collins, CO 80522
Attn: Mr. Pete Cottier
RE: Subsurface Exploration Report
Proposed AAMCO Transmission Center
3737 South Mason
Fort Collins, Colorado
EEC Project No. 1942035
Mr. Cottier:
Enclosed with this letter are the results of the Subsurface Exploration you requested for the
referenced project. In summary, the subsurface materials encountered in the test borings
completed at this site consisted of low plasticity cohesive soils with occasional sand or gravel
zones underlain by highly weathered sandstone bedrock. The top 4 to 7 feet of the overburden
soils appeared to be fill material.
Based on the results of our field and laboratory testing, it is our opinion the proposed lightly
loaded structure could be supported on conventional footing foundations bearing directly on the
in -place fill materials. Some risk would be involved in supporting footing foundations on the
in -place fill soils which were reportedly placed without moisture or density control. However,
with close observation and testing of those materials during construction, we expect the risk of
unacceptable performance would be small. Alternate foundation types could be considered to
reduce or eliminate the risk of settlement from the in -place fill soils. Geotechnical
recommendations concerning design and construction of foundations and support of floor slabs
and pavements are presented in the text of the attached report.
2600 Canton Ct, Suite A Fort Collins, CO 80525
(303) 224-1522 FAX 224-4564
SUBSURFACE EXPLORATION
PROPOSED AAMCO TRANSMISSION CENTER
FORT COLLINS, COLORADO
EEC PROJECT 1942035
I P)
EARTH ENGINEERING
CONSULTANTS, INC.