HomeMy WebLinkAboutAAMCO TRANSMISSION PUD, LOT 10, CREGER PLAZA 2ND REPLAT - PRELIMINARY / FINAL - 32-94 - SUBMITTAL DOCUMENTS - ROUND 1 - DRAINAGE REPORTEngineering Associates June 3, 1994 Project No. PLA-140-94 Mr. Glen D. Schlueter Stormwater Utility City of Fort Collins 235 Mathews P. O. Box 580 Fort Collins, Colorado 80522 - 0580 Re: Lot 10 Creger Plaza - 2nd Replat, Fort Collins, Colorado Dear Mr. Schlueter, The subject project's estimated erosion control security amount has been determined to be the minimum amount required by the City of Fort Collins. Therefore, the amount of $1,000.00 should be included for the erosion control guarantee along with any other surety requirements that are to be a part of the City's "Developer's Agreement." If you should have any questions or desire additional information, please feel free to contact this office. Respectfully Submitted, MESSNER Engineering Associates Dennis R. Messner, P.E. DRM/mkm cc: Mr. Pete Cottier, Cottier Construction, Inc. Civil and Environmental Engineering Consultants 150 E. 29th Street, Suite 225 Loveland, Colorado 80538 Telephone: (303) 663-2221 STORMWATER DETENTION SUMMARY SITE DRAINS TO MAIL CREEK BASIN GROSS SITE AREA = 31,737 SQ.FT. = 0.73 ACRES ± NET SITE AREA EXCLUDING SOUTH MASON STREET R-O-W = 28,724 SQ.FT. = 0.66 ACRES ± HISTORIC "C" = 0.20 DEVELOPED "C" = 0.71 CRITERIA BASED DETENTION VOLUME = 4,358 cu.ft. PLAN DETENTION VOLUME = 4,738 cu.ft. MAXIMUM DEPTH OF DETAINED WATER = 1.2 ft. PEAK DISCHARGE, Q = 0.33±c.f.s. CONSTRUCTION SEQUENCE PROJECT: 1,or 10 gar Plaza Sacnnd Replat STANDARD FORM C SEQUENCE FOR 19 94 ONLY COMPLETED BY: Dennis Messner DATE: June 3, 1994 Indicate by use of a bar line or symbols when erosion control measures will be installed. Major modifications to an approved schedule may require submitting a new schedule for approval by the City Engineer. YEAR 1994 MONTH Aug.1 Septl Oct.I Nov.I Dec.I OVERLOT GRADING ax WIND EROSION CONTROL Soil Roughening Perimeter Barrier NOT APPLICABLE Additional Barriers Vegetative Methods Soil Sealant Other RAINFALL EROSION CONTROL STRUCTURAL: Sediment Trap/Basin Inlet Filters XXXX}CXXXXX Straw Barriers Silt Fence Barriers XXXXXXXXXXXXXXXXXXXX Sand Bags Bare Soil Preparation Contour Furrows Terracing Asphalt/Concrete Paving DX Other (Foundation) XXXXXXXXXXXXXXXXX VEGETATIVE: Permanent Seed Planting Mulching/Sealant Temporary Seed Planting Sod Installation XXX Nettinge/Mate/Blankets Other STRUCTURES: INSTALLED BY VEGETATION/MULCHING CONTRACTOR DATE SUBMITTED MAINTAINED BY APPROVED BY CITY OF FORT COLLINS ON MARCH 1991 8-16 DESIGN CRITERIA EFFECTIVENESS CALCULATIONS PROJECT: —Lot .10 Creger Plaza Second Replat STANDARD FORM B COMPLETED BY: Dennis Messner, Messner Engr. Assoc. DATE: June 3, 1994 Erosion Control C-Factor P-Factor Method Value Value Comment Bare Soil 1.00 1.00 Graded Lot Building Foundation 0.01 1.00 Silt Fence 1.00 0.50 Inlet filter 1.00 0.80 MAJOR PS SUB AREA BASIN (t) BASIN (Ac) CALCULATIONS 79.5 0.66 Bare Soil = 0.54 ac. Building = 0.12 ac. Wtd. "C" - Factor = [(0.54 x 1.00) + (0.12 x 0.01) =0.82 Wtd. "P" - Factor = 1.Oxl.Ox0.5x0.8 = 0.40 Eff. _ [1 - (0.82 x 0.40)] x 100 = 67.2 > 79.5 OK MARCH 1991 B-15 DESIGN CRITERIA RAINFALL PERFORMANCE STANDARD EVALUATION PROJECT: Lot 10 Creger Plaza second Replat STANDARD FORM A COMPLETED BY: Dennis Messner, Messner Engr. Assoc. DATE: June 3, 1994 DEVELOPED ERODIBILITY Asb Lsb Ssb Lb Sb PS SUBBA§IN ZONE (ac) (ft) ($) (feet) M M Moderate 0.66 150 2.25 79.5 MARCH 1991 8-14 DESIGN CRITERIA Client: Cottier Construction, Inc. By: DRM DETERMINE ORIFICE SIZE Orifice Equation, Q = CA42gh A=Q+N2gh At East Area #2 Q = 0.23 c.f.s. h = 37.0 - 33.9 = 3.1 C = 0.65 Project No. PLA-140-94 June 3, 1994 A=0.23-i-[0.65x4(2x32.2x3.1)]= 0.025sq. ft. A=w*2 w=CIA w = A.025 = 0.16 ft. = 1.9 inches Therefore, Use T' x 2' as Maximum Orifice Opening At West Area #1 Q = 0.10 h=35.9-35.0=0.9 A=0.10-[0.65x�(2x32.2x0.9)] =0.02 A = 40.02 w = 0.14 ft. = 1.7 inches Therefore, Use 1-31T' x 1-3/Vas Maximum Orifice Opening Page 7 Client: Cottier Construction, Inc. By: DRM Proj. No.: PLA-140-94 Date: June 3, 1994 DETENTION VOLUME CHECK OF PROPOSED DETENTION IN PARKING LOT (EASTERN AREA #2) Elevation Area (S .Ft.) Avg. Area (S .Ft.) Elevation Diff. (Ft.) Volume (Cu.Ft.) Sum of Volume (Cu.Ft.) (Outlet) 35.80 25 275 0.2 55 55 36.00 525 1,205 0.25 301 356 36.25 1,885 2,460 0.25 615 971 36.50 3,035 4,088 0.25 1,022 1,993 36.75 5,140 6,113 0.25 1,528 3,521 37.00 7,085 3,521 = 3,533 Therefore, sufficient volume is available in the ponded parking lot area at a depth of 1.2 feet with High Water Elevation @ 37.0 DETENTION VOLUME CHECK OF PROPOSED DETENTION IN PARKING LOT (WESTERN AREA #1) Elevation Area (S .Ft.) Avg. Area (S .Ft.) Elevation Dif. . (Ft.) Volume (Cu.Ft.) Sum of Volume (Cu.Ft.) (Outlet) 35.00 25 275 0.5 138 138 35.50 525 1,205 0.25 301 439 35.75 1,885 2,460 0.15 369 808 35.90 3,035 4,088 0.1 409 1,217 36 5,140 808 = 825 Therefore, sufficient volume is available in the ponded storage area at a depth of 0.9 feet with High Water Elevation ® 35.9 Page 6 Client: Cottier Construction, Inc. By: DRM Proj. No.: PLA-140-94 Date: June 3, 1994 DETENTION VOLUME DETERMINATION FOR "RATIONAL METHOD" Detention Volume determination for the Western portion of the site. Time (min.) Q100 Prop. (c.f.s.) Vol. ® Q100 (cu.ft.) Q dis. ® 2 Yr. (c.f.s.) Vol. dis. (cu.ft.) Vol. Diff. (cu.ft.) 10 0.91 544 0.10 60 484 15 0.75 675 0.10 90 585 20 0.65 780 0.10 120 660 25 0.58 863 0.10 150 713 30 0.52 934 0.10 180 754 40 0.44 1,050 0.10 240 810 50 0.38 1,125 0.10 300 825 60 0.33 1,170 0.10 360 810 70 0.29 1,208 0.1 420 788 80 0.26 1,230 0.1 480 750 90 0.23 1,249 0.1 540 709 100 0.21 1,275 0.1 600 675 110 0.19 1,279 0.1 660 619 120 0.18 1,305 1 0.1 1 720 585 Q = CIACf QRelease = 0.5 x Area = 0.5 x 0.20 = At Q100 Proposed = 0.50 x I x 0.20 x 1.25 = 0.10 c.f.s. 0.13 x I Therefore, a minimum of 825 cu. ft. of Detention Storage Volume is desired for the Western portion of the site that is to discharge to the existing open swale along the BN Railroad. Page 5 Client: Cottier Construction, Inc. By: DRM Proj. No.: PLA-140-94 Date: June 3, 1994 DETENTION VOLUME DETERMINATION FOR "RATIONAL METHOD" Detention Volume determination for the Eastern portion of the site. Time (min.) Q100 Prop. (c.f.s.) Vol. ® Q100 (cu.ft.) Q dis. ® 2 Yr. (c.f.s.) Vol. dis. (cu.ft.) Vol. Diff. (cu.ft.) 10 3.38 2,026 0.23 138 1,888 15 2.79 2,515 0.23 207 2,308 2D 2.42 2,906 0.23 276 2,630 25 1 2.14 3,214 0.23 345 2,869 30 1.93 3,479 0.23 414 3,065 40 1.63 3,912 0.23 552 3,360 50 1.40 4,192 0.23 690 3,502 60 1.21 4,359 0.23 828 3,531 70 1.07 4,499 0.23 966 3,533 80 0.95 4,583 0.23 1,104 3,479 90 0.86 4,653 0.23 1,242 3,411 100 0.79 4,751 0.23 1,380 3,371 110 0.72 4,765 0.23 1,518 3,247 120 0.68 4,862 0.23 1,656 3,206 Q = CIACf QRelease = 0.5 x Area = 0.5 x 0.46 = At Q100 Proposed = 0.81 x I x 0.46 x 1.25 = 0.23 c.f.s. 0.47 x I Therefore, a minimum of 3,533 cu. ft. of Detention Storage Volume is desired for the Eastern portion of the site that is to discharge to the existing storm drain. Page 4 Client: Cottier Construction, Inc. By. DRM Project No. PLA-140-94 June 3, 1994 RUN-OFF FROM SITE AT PROPOSED CONDITIONS WITHOUT DETENTION Consider that the Time of Concentration to remain as the undeveloped Tc. USE 10 minutes as Time of Concentration 12 @ 10 min. = 2.50 inJhr. Iioo @ 10 min. = 7.25 in./hr. Western Area #1 Q2 = 0.50 x 2.50 x 0.20 x 1.00 = 0.25 c.£s. Qioo = 0.50 x 7.25 x 0.20 x 1.25 = 0.91 c.fs. Eastern Area #2 Q2 = 0.81 x 2.50 x 0.46 x 1.00 = 0.93 c.£s. Qioo = 0.81 x 7.25 x 0.46 x 1.25 = 3.38 c.£s. Determine Release Rate ,Q, at 0.50 c.f.s./acre: Qrelease = 0.50 x 0.66 = 0.33 c.f.s. = Maximum rate of Total of flow released. Western Area #1 - Q released = 0.20 x 0.50 = 0.10 c.f.s. Eastern Area #2 - Q released = 0.46 x 0.50 = 0.23 c.fs. The estimated detention storage volumes based for the two detention areas are indicated on the following pages. Page 3 Client: Cottier Construction, Inc. By: DRM RUN-OFF FROM SITE AT EXISTING CONDITIONS: Run-off, Q = C x I x A x Cf Cf at 2 year Storm = 1.0 Project No. PLA-140-94 June 3, 1994 Cf at 100 Year Storm = 1.25 The Western Area contains approximately 0.36 acres plus a 0.13 acre contribution from the BN Railroad Offsite Area @ Q2 = 0.20 x 2.50 x 0.13 x 1.00 = 0.07 c.Es. Railroad Qioo=0.20x7.25x0.13x1.25=0.24c.fs. Onsite Area "A" Q2 = 0.20 x 2.50 x 0.36 x 1.00 = 0.18 c.fs. Qioo = 0.20 x 7.25 x 0.36 x 1.25=0.65c.fs. The Eastern Area contains approximately 0.30 acres Onsite Area'B" Q2 = 0.20 x 2.50 x 0.30 x 1.00 = 0.15 c.fs. Qioo = 0.20 x 7.25 x 0.30 x 1.25 = 0.54 c.fs. PROPOSED DEVELOPMENT - RUN-OFF COEFFICIENT The proposed grading plan is designed to direct run-off to two (2) separate points of concentration. The Western Area #1 is to concentrate at a small outlet pipe with an orifice control plate that is to be located in the middle of the storage area on the west side of the building. The Eastern Area #2 is to concentrate at an inlet that is to be located approximately 50 feet west of the Southeast corner of the parking lot. The flow out of the inlet will be restrcted by an orifice plate. #1 - West "C"avg: Lawns and Landscaped Areas = 0 sq.ft+ Roofs, Decks, Patios, etc. = 0 sq.ft.± Streets, Drives, and Parking = 0 sq.ft+ Gravel Drive and Parking = 8,720 sq.ft.± Unimproved and Open Area = 0 sq.ft.± Railroad Right -of -Way = 0 sq.ft.± Total Area = 8,720 sq.ft.± "C"avg = 0.50 #2 - East "C"avg: Lawns and Landscaped Areas = 3,850 sq.ft.± Roofs, Decks, Patios, etc. = 5,060 sq.ft.± Streets, Drives, and Parking = 11,094 sq.ft.± Gravel Drive and Parking = 0 sq.ft.± Unimproved and Open Area = 0 sq.ft.± Railroad Right -of -Way = 0 sq.ft.± Total Area = 20,004 sq.ft.± 'IC7I 8Vg = ((3,850 x 0.20) + (0 x 0.50) + (5,060 x 0.95) + (11,094 x 0.95)) + 20,004 = 0.81 Page 2 Client: Cottier Construction, Inc. Project No. PIA-140-94 By: DRM June 3, 1994 Calculations for Drainage Investigation for Lot 10 of Creger Plaza - 2nd Replat located in the NEV4 of Section 35, Township 7 North, Range 69 West of the 6th P.M., City of Fort Collins, Larimer County, Colorado Total On -Site and Off -Site Areas = 0.843 ± acres (including South Mason Street right-of-way and BN Railroad Right-of-way) The proposed development of the site is to consist of the construction of a commercial structure together with the associated parking and access drives. The net area of the site after deduction of the existing South Mason Street r-o-w and the railroad r-o-w Net Site Area = 28,724 sq.ft. = 0.659 ± acres 9 COKKVZ 113 V V Ilk,_ H 101a QKKIJ Rational "C" Factor = 0.20 for Lawns and Landscaped Areas = 0.95 for Roofs, Decks, Patios, etc. " = 0.95 for Asphalt and Concrete Streets, Drives, and Parking = 0.50 for Gravel Drive and Parking = 0.20 for Unimproved and Open Areas " = 0.20 for Railroad Right -of -Way "C"avg (Undeveloped) All area considered to be "Unimproved" "C" avg = 0.20 TIME -OF -CONCENTRATION EXISTING CONDITIONS• Time of Concentration overland from grade break point onsite to Railroad swale: Time of Concentration across undeveloped area Considered as : Toverland = 1.8 (1.1 - C) AIL + S^1/3 ®5=2.8% L=90ft. C=0.20 T = 1.8 ( 1.1 - 0.20) �90 + 2.8A /3 = 10.9 min. Tswale = L(ft.) + [Vel. (ft./sec.) x 60 minJsec.] per Fig. 3-2 ® S = 1.5% & L = 110 ft. Vel. = 1.3 ftJsec. T = 110 + [1.3 x 60 ] = 1.4 min. Therefore, Tc = 10.9 + 1.4 = 12.3 min. USE 10 minutes as Time of Concentration 12 @ 10 min. = 2.50 inJhr. Iioo @ 10 min. = 7.25 in./hr. Page 1 K A I M Is n3imum 11TE seat &IN No Text CONCLUSIONS AND RECOMMENDATIONS 1. The proposed development will retain the "historic" drainage patterns. 2. The site is located in the MAIL CREEK BASIN. The site is not located within a defined floodway or flood plain. 3. All development is to be performed in accordance with City of Fort Collins criteria. A request for a variance to the City's policies is requested for the detention of adjacent street flows due to physical impracticallity. 4. Onsite detention of stormwater is required by the City of Fort Collins. The volume of run-off to be detained is estimated to be 4,358 cu. ft. The detention volume has been determined based upon the calculated volume of run-off from a 100 Year Storm with the site considered at the proposed conditions being released at a controlled rate of 0.33 c.f.s. The release rate of 0.33 c.f.s. has been based upon discharging the detained flow at a maximum rate of 0.50 c.f.s. per acre of developed site. 5. The City of Fort Collins Standards for temporary erosion control measures are to be incorporated with the construction activities. E PROPOSED DEVELOPME The proposed development of the site is to consist of constructing a commmercial structure to be located on the eastern third of the site. The structure is to contain a total building "foot -print" of 5,060 square feet. A paved parking area is to be provided for 16 vehicles and will be located between the structure and South Mason Street. Access to the site is to be provided through a shared driveway to be located at the northeast corner of the site. The proposed site plan indicates that the western portion of the site is to be used for the storage of vehicles and to provide an emergency access. The western area is to be gravel surfaced. The current City policies require that the difference between the historic rate of run-off and the developed rate of run-off be detained onsite. The release rate is to be no greater than the 2 Year Storm historic rate. According to the City's Stormwater Utility staff the site has previously been included in a Special Improvement District that established a peak rate of discharge of 0.5 c.f.s. per acre as the controlling factor in determining the size of detention facilities onsite. The City's policies normally require that the street flows adjacent to the site be incorporated with the onsite detention requirements. This policy works when the street construction and onsite detention are developed in conjunction. In this instance it is not physically feasible to combine the two flows since the street flow would have to enter the site at its low point. Consideration is being given to the flow from the adjacent railroad right-of-way which will reduce the the overall discharge to the area streets. EROSION CQNTROL MEASURE Erosion control considerations have been made based upon the short term, activities occuring during construction and the long term, measures considered through the life of the facility. The long term measures incorporated to eliminate erosion are the proposed methods and materials to be used to provide a surface treatments for the structure and associated driveways, parking areas, walkways and the landscaped open areas. The landscape materials and plantings in the open areas will provide a combination of living and inert ground covers to deter erosion. The recommended short term erosion control method to be incorporated into the construction activities is the placement of a "Sediment Trap" and "Silt Fence" in order to control and contain mud and debris onsite. The proposed construction site is exempt from providing wind erosion measures since its area is less than one acre. The schedule for construction activities is anticipated to be: August 15 - August 30, perform site grading and access related construction; September 1 - January 1, structure construction; November 1 - November 20, construct new parking and drives, and install landscaping and signage. 2 SCOPE The following report represents the results of a drainage investigation for a proposed "AAMCO" transmission repair shop to be located on a parcel of land situated in the Northeast Quarter of Section 35, Township 7 North, Range 69 West of the 6th P.M., Larimer County, Colorado. The site description is: Lot 10 of Creger Plaza Second Replat in the City of Fort Collins. The investigation was performed for the project contractor, Cottier Construction, Inc. The purpose of this investigation is to determine the effects of the proposed development on the area's existing drainage conditions and to determine the improvements, if any, and the appropriate sizing for proposed improvements so that it may be incorporated with the construction of the project. The conclusions and recommendations presented in this report are based upon the proposed site development plan; proposed site development construction plans; on -site observations; and the available topographic information. The analysis was performed in accordance with the City of Fort Collins "Storm Drainage Design Criteria and Construction Standards" manual. SITE DESCRIPTION The site is rectangular and contains approximately 0.73 acres, including the adjacent South Mason Street right-of-way. The site's East-West dimension, including the westerly half of the Mason Street right-of-way, is approximately 320 feet and its North -South dimension is 100 feet. The site abuts the easterly right-of-way of the Burlington Northern Railroad and the westerly right-of-way of South Mason Street. The site is located on the drainage basin boundary between the FOOTHILLS BASIN and the MAIL CREEK BASIN. Surface run-off from the site will flow southerly along South Mason Street and therefore the site is considered to be in the MAIL CREEK BASIN. EXISTING CONDITIONS The site is presently vacant. The ground surface has been roughly graded and native vegetation is sparse to moderate across the site. The site has been used to dispose of excess excavated material from the nearby construction sites. Due to the dumping of material on the site, a ridge has been created in the middle of the lot. Run-off on the west side of the ridge flows toward the southwest to a drainage course that is situated along the Burlington Northern Railroad. The run-off that is generated on the east side of the ridge flows toward the southeast and into a depression located at the west side of South Mason Street. The "historic" direction that the site slopes is from Northwest to Southeast. The slopes range in rates varying from 0.5% to 5%. The site does receive a minor amount of run-off from the property to the North. The run-off from the north will be retained on the adjacent site after the development of the site has been completed. The run-off generated on the adjacent railroad right-of-way flows southerly along the railroad right-of-way. The existing curb and gutter along the west side of Mason Street is constructed with a grade break located at the center of the common driveway for Lots 10 and 11. The flow in the gutter to the north of this point is northerly toward Horsetooth Road. The flow in the gutter to the south of this point is southerly toward an existing storm drain inlet.The run-off which is directed southerly along the curb and gutter ultimately flows into the Mail Creek Basin outfall system. 1 TABLE OF CONTENT'S Letter of Transmittal i Table of Contents Scope 1 Site Description 1 Existing Conditions 1 Proposed Development 2 Erosion Control Measures 2 Conclusions and Recommendations 3 Vicinity Map Existing Conditions Exhibit Proposed Conditions Exhibit Calculations Drainage Summary n Project No. PLA-140-94 June 3, 1994 Mr. Pete Cottier Cottier Construction, Inc. P. O. Box 1051 Fort Collins, Colorado 80522 Dear Mr. Cottier, The enclosed report represents the results of the drainage investigation for the proposed "AAMCO Transmission" facility to be located on Lot 10 of the Creger Plaza - 2nd Replat in the City of Fort Collins, Larimer County, Colorado. This investigation was based upon the proposed site development plan; proposed site grading plan; on -site observations; and available topographic information. The investigation was performed in accordance with the criteria established in the City of Fort Collins "Storm Drainage Design Criteria and Construction Specification Standards" manual. We sincerely appreciate the opportunity to be of service to you. If you should have any questions, please feel free to contact this office. Respectfully Submitted, O�C,� "t_� Dennis R. Messner, P.E. MESSNER Engineering Associates DRM/mkm Enclosures J4ne 31 Civil and Environmental Engineering Consultants 150 E. 29th Street, Suite 225 Loveland, Colorado 80538 Telephone: (303) 663-2221 DRAINAGE IIWESTIGATION o A PROPOSED'AAMCO' TRANSMLSSION SHOP TO BE LOCATED ON LOT 10, CREGER PLAZA SECOND REPLAT FORT COLLINS, COLORADO Prepared for Cottier Construction, Inc. P. O. Box 1051 Fort Collins, Colorado 50522 June 1994 Project No. PIA-140-94 luotiplMNAMIN MESSNER Engineering Associates 150 East 29th Street, Suite 225 Loveland, Colorado 80538 Telephone: (303) 663-2221 Civil and Environmental Engineering Consultants