Loading...
HomeMy WebLinkAboutAAMCO TRANSMISSION PUD, LOT 10, CREGER PLAZA 2ND REPLAT - PRELIMINARY / FINAL - 32-94 - CORRESPONDENCE - STAFF'S PROJECT COMMENTS17. Storm drainage concerns will be forwarded to you under separate cover. Generally, the Stormwater Utility staff has concerns about drainage flows being directed to the Railroad, unless you have written permission from them. Staff believes this permission may be very difficult to obtain and recommends that all flows be directed to the street. There is a detention and maximum release rate requirement in this drainage basin. 18. Please describe provisions you have for the protection of water quality of drainage flows off this site. Given the proposed use, staff recommends that drainage be detained and flow over/through a grassy, graveled area to provide some cleansing prior to release into the City system. 19. Fire hydrants in the vicinity should be shown on the site plan. Please contact Mike Pretz at the Poudre Fire Authority to find out whether an additional hydrant is needed on this property. �v 20. Transportation is still reviewing the traffic study. They have some concern that the potential left turn bay on Mason street would squeeze out the bike lane. When. I hear more information, I will pass it on to you. This concludes staff comments at this time. In order to stay on schedule for the July 25, 1994 Planning and Zoning Board hearing, please note the following deadlines: Plan revisions are due July 8th (3 sets of plans and written documentation responding to the above concerns), PMT1s (one PMT of each plan sheet), colored renderings, and 8 prints are due July 18th. Final mylars and other documents are due as soon as possible following the hearing. Please be aware that the development agreement and utility plans must be signed prior to the Planning and Zoning Board Hearing, for all Final PUD's. If not, a condition will be placed on the project giving you 30 days to finalize the plans and agreement, after which time, you must submit a request for an extension, to the Planning and Zoning Board. If you have any questions about these comments or would like to schedule a time to meet to discuss them, please contact me at 221- 6750. Sincerely,� Kirsten Whetstone, AICP Project Planner cc Kerrie Ashbeck, Engineering Department Messner Engineering Associates the emergency lane on Lot 9? Do you have easements and will a road base lane be provided back to Mason Street? If there are no easements at this time, easements will have to be dedicated by separate document. 8. Please indicate, on the site plan, the zoning and land uses east of this property. Also indicate any driveways, curb cuts, streets, etc. along Mason Street within 100' of the property. 9. Is the vicinity map to scale? 10. If the vehicle storage area is for parking and driving of vehicles, or outdoor storage of vehicles, it is required to be paved. If it is an outdoor storage area for materials or parts it can be a gravel material, but there must be landscaped materials provided along the north and south boundaries for screening purposes. 11. The north elevation of the building should be 'broken -up' with additional landscape material, especially verticle type foundation plantings of trees and shrubs, ie junipers or english ivy or other vines. This would soften the mass of the building. Staff also recommends adding relief in the architecture with accent trim, block or stone details, a colored strip of a different type of block, etc. 12. Please add another Hackberry street tree to the Mason Street frontage. What is SC on the landscape plan? Please add landscape materials to the north and south side of the storage area. The fence should be moved 5' inside the south property line to allow sufficient room for plantings. Staff also suggests addition of 3 or 4 Pinyon Pines along the south property boundary. 13. Parking along Mason Street should be buffered with berms and/ or evergreen plant materials. 14. Please combine the utility, grading, and drainage plans into one set of drawings as outlined in the Development Manual. 15. Please provide a 4' wide sidewalk along Mason Street, detached a minimum of 4 1/2 feet from back of curb. City oversizing fund can reimburse for this since a 4' attached walk exists. It is important to separate vehicles and pedestrians along arterial right-of-way. 16. Please include more detail on the architectural elevations, such as building materials and colors. What is the maximum height of the building? Please indicate this on the site plan and architecturals. Please specify the color of the garage doors, building trim, and architectural details. City of Fort Collins Community-Planri-_.g and Environmental Services Planning Department June 29, 1994 Pete Cottier Cottier Construction, Inc. PO Box 1051 Fort Collins, CO 80522 Dear Mr. Cottier, City Staff has reviewed your submittal for the AAMCO Transmission Shop, Lot 10 Creger Plaza 2nd Replat PUD- preliminary and final, and offers the following written comments: 1. Review of these plans should not be construed as a commitment that telephone facilities sufficient to serve this project are presently available. US West will provide telephone service in accordance with the rates and tariffs on file with the Colorado Utilities Commission. 2. The owner is responsible for provision of all conduit, ditch, and street crossings for telephone facilities within the project, and the owner provides terminal room space and power for the main terminal at one building, generally in a janitor's closet or utility room. The owner's vendor provides all facilities beyond the main terminal. Contact the US WEST engineer for conduit specifications for the main telephone entrance cable. 3. Any relocation of existing telephone facilities required by these plans will be paid for by the developer. 4. According to Public Service, the gas line location marked on the plans is not correct. The line changes location twice along the lot frontage. 5. Please file a hazardous materials impact analysis with Poudre Fire Authority, if one is needed. Please contact Ron Gonzales at 221-6570. 6. Buildings greater than 5,000 sf in size must be provided with an automatic fire sprinkler system, or be divided into smaller areas with approved fire rated construction. Please contact Sharon Getz at the Building Department (221-6760) for details. 7. The emergency access lane needs to be a hard, all weather surface. Please describe the type of gates that are proposed. Please communicate this information to the Fire Authority, as they will need access through these gates. What happens to 281 North College Avenue • P.O. Bo\ 580 • Fort Collins, CO 80522-0580 • (303) 221-6750