Loading...
HomeMy WebLinkAboutWESTFIELD PARK (STOCKBRIDGE) PUD - FINAL - 27-94A - MINUTES/NOTES - CORRESPONDENCE-NEIGHBORHOOD MEETINGThe Westfield Park P. U.D. Homewner's Association is responsible for the fence until the individual lot owner moves in and assumes responsibility. 9. Will the site's natural drainage be maintained (West to East)? Yes_ The proposed site drainage flows west to east and would not cause additional Bows into Imperial Estates. 10. Will Crescent Drive be used for construction traffic? No_ 11. Will the canal still carry water and be used as it is today? Yes_ 12. When will construction begin? Construction is most likely to begin this fall. 13. How much drainage will flow through pedestrian connection at Imperial Drive? This area will carry the some storm flows that currently exist along imperial Drive. 14. Will a 6' ht fence continue along the west edge of the boundary of the proposed park? The park is currently in the design phase, but most likely the solid screen fence will stop when - proposed development ends and will not continue along the park's west boundary. 15. When will all three phases be completed? When will HOA exist and take control? Completion time of a project this size is entirely dependent on the absorption rate of the current and future housing market The developer estimates a rate of 36 houses per year to be average at this time. The HOA 411 usually develop as several homeowners move into the neighborhood, generally alter the first 20 housed am built and occupied. 16. Will the ponds hold standing water? The detention pond is designed to hold storm flows and release them slowly at a controlled rate. So although it is not designed to permanently hol dstanding water, the pond will contain water during release periods following a major storm. 17. What is the average lot size? The smallest lots are approximately 505rf i ' (12 acre), larger lots along the west boundary are approximately 1/3 acre In size. 18. Are all lots single family? Yes. 19. Why has it taken so long between Preliminary and Final submittals? The timing has been dependent upon when utilities would be installed nearby. Most utilities are being extended through Mountain Ridge, where utilities are just now being completed 19. Why did the developer not include the parcel to the east (recently for sale) with this plan? The developer did attempt to purchase this property, but another buyer was successful. 20. Is there a signal planned at Seneca Street and Horsetooth Road? Traffic signals are warranted by a number of factors, and traffic patterns even after this development is in place does not warrant a signal at this location. (Iesigii 1 4wo- - - ^Y 1. 558£9ZZOL6 'ON XU ONI ONIN33IION3 VMV 5£:OI ini L6-9I-83A tliYw'°"' s47w w MEETING MINUTES date: date of meeting: location of meeting: meeting number. project: distribution: subject: February 17, 1997 February 12. 1997 Webber Jr. High 1 Westfield Park P.U.D_ Leo Schuster, fax 66 299 Steve Olt, fax 224-61 1 Brian Shear, fax 282-0311 Don Frederick, fax 669-3725 Final PUD Plan Neighborhood Meeting bha design, Inc. A neighborhood meeting for the Westfield Park IP.U_D, was held on February 12, 1997. The following is a list of questions or comments that were made qv neighbors attending the meeting. 1. A concem was expressed regarding the potential for traffic problems at the intersection of Horsetooth and Shellds with the addition of more houses in this area. It was explained that a traffic report was prepared as a part of the approved Preliminary PUD submittal which would have addressed this issue. Also, this intersection is slated for improvements in the near future. 2. When will Seneca Street go through? Seneca will be completed through to connect to the existing alignment to the south prior to the I beginning of the second development phase. 3. How wide will Horsetooth Road be? This development is required to improve Horsetooth Road along it Montage to City standards, four lanes in width. ` 4. Please continue use of 6' ht. screen fence along entire west edge including 'outparr4. 5. How will plantings of trees along west boundary be enforced? Who can we call if plants die and are not replaced? Will the City enforce this plan? ' Several questions were asked regarding the enforcement of the plantings a�long the west boundary of the development The plantings and 6' ht fence in this area have been shown on the plan to h�lp with Me transition issues along this west edge. The plants on these lots will be installed by the buil er or the owner of the residence in accordance with this plan. The fence and plantings as shown on the plan will be included as a part of the Covenants for the community. Enforcement will be the responsibility of the developer until a Homeowners Association is in place and has taken over this responsibility. Since this Site and Landscape Plan is a document recorded with the City, the City will enforce the plantings shown on this plan including those along the west boundary. 6. Will the 6' ht fence along the west boundarry be built with each lot or with each phase? i The fence will be bur7t with each phase.. 7. Will fence be finished on both sides? Will it be solid? Shadowbox? There was a great deal of discussion regarding the design of the privacy, fence, with several opinions of how it should be designed. Although the fence has been shown as a solid screen fence, the developer was open to the discussion of a shadowbox or tightly -spaced picket fence design. Since many of the adjacent property owners were present at the meeting, we look names of those who were interested and plan to sketch 2-3 altiemative fence designs for these individuals to decide upon by majority vote. 8. Who is responsible for the maintenance of the perimeter fence? Z0/10'd 558£9ZZOL6 'ON IVd, ONI ONIMENION3 V60V 6£:Oi 3ni L6-91-83A