Loading...
HomeMy WebLinkAboutCOTTONWOOD RIDGE SUBDIVISION - PRELIMINARY - 31-94 - SUBMITTAL DOCUMENTS - ROUND 1 - GEOTECHNICAL (SOILS) REPORTLOG OF BORING No. 4 Page 1 of 1 CLIENT ARCHITECT/ENGINEER Nona and Sandy Thayer d PROJECT SITE Shields Street South of Harmony Roa Fort Collins, Colorado .-. Cottonwood SAMPLES Ridge TESTS (D O H O l~i W CD J W � z W DESCRIPTION > z\ LLL9 \ H = N W � tN H 0 zz WHJ 2 F- N m W O 3 N O W WHO- 0- 0- U E O- U F- O H >- LL U O: LL F- Z \ Q W N >- W O- J O M U Z F- (A F- H J x o m z F- Winm >= O0. Z)ina. ¢-i-i 5088.0 .. 1 T^"V^TT SnR7 s CL 1 SS 12" 8 39.4 48/20/28 7.5 15.0 t EAN CLAY WITH SAND Brown, moist, stiff CANDY LEAN CLAY Red, moist, medium stiff rT AYEY SAND WITH GRAVEL Red, dry, medium dense WEATHERED CLAYSTONE/SILTSTONE Olive, moist, moderately hard BOTTOM OF BORING 5086.0 PA CL 2 SS 12" 7 15.0 5 PA 5080.5 3 ST 12.4 SC 4 SS 12" 22 4.7 PA 10 Sn77 n _ 5073.q 15 5 "1 23 THE STRATIFICATION LINES REPRESENT THE APPROXIMATE BOUNDARY LINES BETWEEN SOIL AND ROCK TYPES: IN -SITU, THE TRANSITION MAY BE GRADUAL. WATER LEVEL OBSERVATIONS Empire Laboratories Incorporated Division of Terracon BORING STARTED 4-28-94 BORING COMPLETED 4-28-94 µL g None W.D. = None A.B. RIG CME-55 FDREMAx DL wI IWL APPROVED LRS JOB N 20945089 Checked 11 Days A.B. LOG OF BORING No. 3 Page 1 of 1 CLIENT ARCHITECT/ENGINEER Nona and Sandy Thayer SITE Shields Street South of Harmony Road PROJECT Fort Collins, Colorado Cottonwood Ridge SAMPLES TESTS o 0 0 " o J � cn H� c H DESCRIPTION >>- to x z\ z WO = 2 W � I. N H Zz JN a t- fA m W O 3 Cn ow J fA a U E a U FO H >-t_ UMLL WWI_ � 5094.0 O Z H 52 Wm S On. �tAa Naa FILL - LEAN CLAY WITH SAND CL 1 SS 12" 13 14.3 1.0 Brown, moist 5093.0 PA SANDY LEAN CLAY 85 CL 2 ST 1 12" 15.3 109 2270 Red, moist, stiff to soft, 3 SS 12" 3 14.8 with sand lenses 5 PA 4 SS 12" 22 7.2 PA 10 5 SS 12" 12 17.6 15.0 5079.0 15 BOTTOM OF BORING THE STRATIFICATION LINES REPRESENT THE APPROXIMATE BOUNDARY LINES BETWEEN SOIL AND ROCK TYPES: IN -SITU, THE TRANSITION MAY BE GRADUAL. WATER LEVEL OBSERVATIONS Empire Laboratories Incorporated BORING STARTED 4-28-94 WL g None W.D. = None A.B. BORING COMPLETED 4-28-94 RIG CME-55 FOREMAN DL wL Division of Teaacon W Checked 14 Days A.B. APPROVED LRS JOB # 20945089 LOG OF BORING No. Z Page I of 1 CLIENT Nona and Sandy Thayer ARCHITECTIENGINEER sreE Shields Street South of Harmony Road PROJECT Fort Collins, Colorado Cottonwood Ridge SAMPLES TESTS .. J Y U DESCRIPTION r � Z\ W z HH M H = N W � 1 fn H O U._j U) 2 F- to on W O 3 U)O W J U)a a U E a U HO H YLL UMLL W WLL o z � W U)m E od �fn(L (no -a. LD 5085.0 ^ ^ ^ 0.5 TOPSOIL 5084.5 5sz 10 1 SS 12" 8 23.2 880 LEAN CLAY WITH SAND Brown, moist, stiff 6.5 5078.5 PA CL 2 ST 19.8 107 3250 3 SS 12" 9 20.5 PA WEATHERED SI TSTONE/CLAYSTON_E_— 5077.0 8.0 Tan/gray, moist, moderately hard)4 SS 12" 50 13.5 CLAYSTONE/SILTSTONE Gray, moist, hard 14.8 5070.2 PA .5 SS 10" 0/10" 9.8 BOTTOM OF BORING THE STRATIFICATION LINES REPRESENT THE APPROXIMATE BOUNDARY LINES BETWEEN SOIL AND ROCK TYPES: IN -SITU, THE TRANSITION MAY BE GRADUAL. WATER LEVEL OBSERVATIONS Empire Laboratories Incorporated Division of Terrecon BORING STARTED 4-28-94 BORING COMPLETED 4-28-94 WL Q None W.D. = 59611 A.B. RIG CME-55 FOREMAN DL wL ILWL APPROVED LRS JOB # 20945089 Checked 11 Days A.B. LOG OF BORING No. 1 Page 1 of 1 CLIENT ARCHITECT/ENGINEER Nona and Sandy Thayer SITE Shields Street South of Harmony Road PROJECT Fort Collins, Colorado Cottonwood Ridge SAMPLES TESTS o (D 0 o J x x H DESCRIPTION r cn x w z\ n z w H~ U-0 x o}IL n 0- U E 0- C.) ro H Uwu. 5107.0 w 0 W D o z r w W O.J mm o E WL) as z�_cn mcna. ^ " 0.5 TOPSOIL 5106.5 CL 1 SS 12" 11 9.5 1.0 LEAN (LAY WITH SAND 5106.0 Brown, moist, stiff PA SANDY LEAN CLAY 3.5 Red, dry, stiff 5103.5 CL 2 ST 12" 5.7 sc 3 SS 12" 21 2.7 5 PA CLAYEY SAND WITH GRAVEL Red, dry to moist, medium dense to dense 4 SS 11" 0/11" 1.3 PA 10 5 SS 12" 32 7.4 15.0 5092.0 15 BOTTOM OF BORING THE STRATIFICATION LINES REPRESENT THE APPROXIMATE BOUNDARY LINES BETWEEN SOIL AND ROCK TYPES: IN -SITU, THE TRANSITION MAY BE GRADUAL. WATER LEVEL OBSERVATIONS BORING STARTED 4-28-94 Empire Laboratories Incorporated Division of Terracon 4 None W.D =None A.B. BORING COMPLETED 4-28-94 rL RIG CME-55 FOREMAN DL Checked 11 Days A.B. APPROVED LRS JOB a 20945089 No Text Terracon Nona and Sandy Thayer ELI Project No. 20945089 • Excavation and Trench Construction: Excavations into the on -site soils will encounter caving soils and possibly groundwater, depending upon the final depth of excavation. The individual contractor(s) should be made responsible for designing and constructing stable, temporary excavations as required to maintain stability of both the excavation sides and bottom. All excavations should be sloped or shored in the interest of safety following local, and federal regulations, including current OSHA excavation and trench safety standards. PRELIMINARY GENERAL COMMENTS It should be noted that this was a preliminary investigation and the bearing capacities recommended in this report are based upon preliminary tests. Due to variations in soil conditions encountered at the site, it is recommended that additional test borings be made prior to construction. Samples obtained from the borings should be tested in the laboratory to provide a basis for evaluating subsurface conditions. The analyses and recommendations in this report are based in part upon data obtained from the field exploration. The nature and extent of variations beyond the location of test borings may not become evident until construction. If variations then appear evident, it may be necessary to reevaluate the recommendations of this report. Our professional services were performed using that degree of care and skill ordinarily exercised, under similar circumstances, by reputable geotechnical engineers practicing in this or similar localities. No warranty, express or implied, is made. We prepared the report as an aid in design of the proposed project. This report is not a bidding document. Any contractor reviewing this report must draw his own conclusions regarding site conditions and specific construction techniques to be used on this project. This report is for the exclusive purpose of providing geotechnical engineering and/or testing information and recommendations. The scope of services for this project does not include, either specifically or by implication, any environmental assessment of the site or identification of contaminated or hazardous materials or conditions. If the owner is concerned about the potential for such contamination, other studies should be undertaken. 11 Terracon Nona and Sandy Thayer ELI Project No. 20945089 • Placement and Compaction: 1. Place and compact fill in horizontal lifts, using equipment and procedures that will produce recommended moisture contents and densities throughout the lift. 2. Uncompacted fill lifts should not exceed 10 inches loose thickness. 3. No fill should be placed over frozen ground. 4. Materials should be compacted to the following: Material On -site soils or approved imported fill: Minimum Percent Compaction (ASTM D698) Beneath foundations ............................ yo 95 Beneath slabs ................................ 95 Beneath pavement ............................. 95 Utility trenches beneath construction ................ 90 Utility trenches in open areas ...................... Miscellaneous backfill................................ 90 5. If a well defined maximum density curve cannot be generated by impact compaction in the laboratory for any fill type, engineered fill should be compacted to a minimum of 80 percent relative density as determined by ASTM D4253, D4254. 6. On -site clay soils around or beneath foundations should be compacted within a moisture range of optimum to 2 percent above optimum. Sand soils around or beneath foundations should be compacted within a moisture content range of 3 percent below to 3 percent above optimum. • Compliance: Performance of slabs -on -grade, foundations and pavement elements supported on compacted fills or prepared subgrade depends upon compliance with "Earthwork" recommendations. To assess compliance, observation and testing should be performed under the direction of the geotechnical engineer. 10 Terracon Nona and Sandy Thayer ELI Project No. 20945089 • Excavation: 1. It is anticipated that excavations into the on -site soils can be accomplished with conventional earth -moving equipment. 2. Excavations penetrating the claystone-siltstone bedrock may require the use of specialized heavy-duty equipment. • Slab Subgrade Preparation: 1 . Where existing clay soils will support upper level floor slabs, the soils should be scarified, moisture -conditioned and compacted to a minimum depth of 6 inches. 2. A minimum 4-inch layer of clean -graded gravel should be placed beneath upper level slabs. 3. A minimum 8-inch layer of free -draining gravel should be placed beneath basement floor slabs in conjunction with the underslab drainage system. • Fill Materials: 1. Clean on -site soils or approved imported materials may be used as fill material for the following: • general site grading • exterior slab areas • foundation areas • pavement areas • interior floor slab areas • foundation backfill 2. On -site bedrock materials are not recommended for use beneath structural areas of the site or as backfill. Should bedrock materials be used for general site grading, placement in fills at non-structural locations on the site is recommended. 3. Select granular materials should be used as backfill behind retaining walls. 4. Frozen soils should not be used as fill or backfill. �7 Terracon Nona and Sandy Thayer ELI Project No. 20945089 Earthwork: • General Considerations: The conclusions contained in this report for the proposed construction are contingent upon compliance with recommendations presented in this section. • Site Clearing: 1 . Strip and remove existing vegetation and other deleterious materials from proposed building and pavement areas. 2. If unexpected fills or underground facilities are encountered during site clearing, such features should be removed and the excavation thoroughly cleaned prior to backf ill placement and/or construction. All excavations should be observed by the geotechnical engineer prior to backfill placement. 3. Stripped materials consisting of vegetation and organic materials should be wasted from the site or used to revegetate exposed slopes after completion of grading operations. 4. Drainage blankets, consisting of free -draining gravel enclosed in filter fabric, should be placed in any natural drainage beneath fill sections which exceed 12 feet in height. Drainage blankets should be led to a positive gravity discharge. 5. Sloping areas steeper than 2:1 (horizontal:vertical) should be benched to reduce the potential for slippage between existing slopes and fills. Benches should be level and wide enough to accommodate compaction and earth moving equipment. 6. The site should be initially graded to create a relatively level surface to receive fill and to provide for a relatively uniform thickness of fill beneath proposed building structures. 7. All exposed areas which will receive fill, once properly cleared and benched where necessary, should be scarified to a minimum depth of 6 inches, conditioned to near optimum moisture content, and compacted. L Terracon Nona and Sandy Thayer ELI Project No. 20945089 Foundations and masonry walls should be reinforced as necessary to reduce the potential for distress caused by differential foundation movement. The use of joints at openings or other discontinuities in masonry walls is recommended. Foundation excavations should be observed by the geotechnical engineer. If the soil conditions encountered differ significantly from those presented in this report, supplemental recommendations will be required. Basement Construction: Groundwater was encountered in the northeast portion of the site at a depth of 5'/2 feet below the surface. It is our understanding a toe drain along the east side of the canal and/or an area drain are to be constructed to permanently lower the existing groundwater level. In our opinion, basement construction is feasible provided the excavation extends no deeper than 2 to 3 feet above the groundwater level and/or bedrock surface. Complete underslab dewatering systems are recommended for basements constructed east of the canal. In our opinion, full depth basement construction is feasible west of the canal. It is recommended that the groundwater level in the west portion of the site be monitored for a sufficient period of time to better determine the need for complete underslab dewatering systems in this area. Floor Slab Design and Construction Within 3 Feet of Bedrock: The development of substantial swelling pressures within the claystone-siltstone bedrock near approximate slab subgrade elevation could result in differential movement of floor slab -on -grade if the potentially expansive bedrock increases in moisture content. Use of structural floor systems, structurally supported independent of the subgrade, is a positive means of eliminating the potentially detrimental effects of floor movement. It is our opinion that with certain precautions and knowing that some risk is involved, a floating floor slab may be a reasonable alternative. If the owner is willing to assume the risk of future slab movement and related structural damage, the subgrade soils should be prepared as outlined in the "Earthwork" section of this report. Floor Slab Design and Construction On At Least 3 Feet of Non -Expansive Soils: Where non - expansive, or low -swelling soils will be supporting the floor slabs, some differential movement of a slab -on -grade floor system is possible should the subgrade soils increase in moisture content. Such movements are considered within general tolerance for normal slab -on -grade construction. To reduce any potential slab movements, the subgrade soils should be prepared as outlined in the "Earthwork" section of this report. 7 Nona and Sandy Thayer Terracon ELI Project No. 20945089 Foundation Systems - Northeast Portion of Site: Provided that the existing water table in the northeast portion of the site is permanently lowered, it is our opinion full depth basement construction is feasible in this area. Due to the presence of shallow and potentially expansive claystone-siltstone bedrock in the northeast portion of the site, a grade beam and drilled pier foundation system is recommended for support of any residences with slabs placed within 2 to 3 feet of the bedrock surface. Straight shaft piers, drilled a minimum of 5 feet into the firm bedrock, with a minimum shaft length of 12 feet are recommended. For axial compression loads, piers may be design for a maximum end -bearing pressure between 12,000 and 15,000 pounds per square foot (psf), and skin friction between 1,200 and 1,500 psf for the portion of the pier in firm bedrock. Required pier penetration should be balanced against potential uplift forces due to expansion of the subsoils and bedrock on the site. For design purposes, the range of uplift force on each pier can be determined on the basis of the following equation: Up = [15to201xD Where: up = the uplift force in kips, and D = the pier diameter in feet Uplift forces on piers should be resisted by a combination of dead -load and pier penetration below a depth of 5 feet and in the bearing strata. Drilling to design depths should be possible with conventional single flight power augers. Shafts will probably remain open without stabilizing measures. However, pier concrete should be placed immediately after completion of drilling and cleaning. Due to potential sloughing and raveling, foundation concrete quantities may exceed calculated geometric volumes. Pier concrete with slump in the range of 5 to 7 inches is recommended. Foundation Systems - West and Southeast Portions of the Site: Due to the presence of low - swelling soils on the west and southeast portions of the site, spread footing foundations bearing upon undisturbed subsoils at least 2 to 3 feet above bedrock are recommended for support of the proposed residences in these areas. The footings may be designed for a maximum bearing pressure between 1,000 and 2,000 psf. Existing fill on the site should not be used for support of foundations without removal and recompaction. Exterior footings should be placed a minimum of 30 inches below finished grade for frost protection. Finished grade is the lowest adjacent grade for perimeter footings. The design bearing capacities apply to dead loads plus design live load conditions. A Terracon Nona and Sandy Thayer ELI Project No. 20945089 CONCLUSIONS AND RECOMMENDATIONS Site Development Considerations: In our opinion, the proposed construction is feasible at the site. High groundwater and potentially expansive bedrock will require particular attention in the design and construction of the development. Because of variations in the engineering properties of the on -site soils and bedrock, foundation bearing levels, structural loads, and possible final grades, the following foundation systems were evaluated for use on the site: • grade beams and straight shaft piers drilled into bedrock; and • spread footings bearing on undisturbed soils. Design criteria for alternate foundation systems is subsequently outlined. Use of the alternative foundation systems outlined in this report should be determined for individual residential structures on the basis of supplemental geotechnical exploration of each lot prior to construction. Slab -on -grade construction, for basement or garage areas, is considered acceptable for use when subgrade soils consist of the on -site clays or sands with gravel, provided that design and construction recommendations are followed. Given the expansive potential of the claystone- siltstone bedrock, consideration should be given to the use of structural floor systems in basement areas where the bedrock will be encountered. Evaluation of expansion tests conducted on individual lots during supplemental geotechnical exploration is recommended to assess the need for structural floor systems. Due to the potential for seepage to occur along the east side of the canal and the potential for a perched water table to form on the bedrock surface, complete underslab dewatering systems are recommended for any basements constructed east of the canal. The need for complete underslab dewatering systems for basements constructed west of the canal should be determined after the groundwater level has been monitored for a sufficient period of time in this area. Consideration should be given to (1) constructing a toe drain along the east side of the canal and/or (2) constructing an area drain below the proposed streets of the development. The area drain should be properly designed and approved by the City of Fort Collins. 5 4 Nona and Sandy Thayer ELI Project No. 20945089 Terracon • Claystone/Siltstone Bedrock: The bedrock stratum was encountered in borings 2 and 4 at ` depths of 6 Y2 and 11 feet below the surface, respectively. The upper 1 Yz to 4 feet of bedrock encountered is highly weathered. However, the underlying bedrock encountered in boring 2 is hard. Field and Laboratory Test Results: Field test results indicate that the clay soils vary from soft to stiff in consistency. The underlying granular soils vary from medium dense to dense. The weathered and unweathered bedrock are moderately hard and hard; respectively. The soils at anticipated foundation bearing depths have low to moderate load bearing capabilities and the bedrock at anticipated foundation bearing depth has moderate load bearing capability. Preliminary laboratory test results indicate that the clay soil has low expansive potential and the claystone-siltstone bedrock has moderate to high expansive potential. Groundwater Conditions: Groundwater was not encountered in any test boring at the time of the field exploration; however, when checked 11 days after drilling, groundwater was measured at a depth of 5 Yz feet in test boring 2. These observations represent only current groundwater conditions, and may not be indicative of other times, or at other locations. Groundwater levels can be expected to fluctuate with varying seasonal and weather conditions and the flows in the Trilby Lateral and Pleasant Valley and Lake Canal. Zones of perched and/or trapped groundwater may also occur at times in the subsurface soils overlying bedrock, on top of the bedrock surface or within permeable fractures in the bedrock materials. The location and amount of perched water is dependent upon several factors, including hydrologic conditions, type of site development, irrigation demands on or adjacent to the site, fluctuations in water features, and seasonal and weather conditions. Fluctuations in groundwater levels can best be determined by implementation of a groundwater monitoring plan. PVC pipe was installed in each test boring at the time of drilling. Groundwater levels should be measured periodically in the test borings over a sufficient period of time. The possibility of groundwater fluctuations should be considered when developing design and construction plans for the project. 4 Nona and Sandy Thayer ELI Project No. 20945089 SITE CONDITIONS Terracon The site consists of approximately 34 acres of a land on the west side of South Shields Street approximately Y< to Yz-mile south of Harmony Road, south of Fort Collins, Colorado. The majority of the area is vegetated with low, dense grass. An existing residence with horse corrals is located . in the southwest portion of the site. The Pleasant Valley and Lake Canal, which was dry at the time of our investigation, runs generally north -south across the west -central portion of the site. The Trilby Lateral extends eastward from the center of the west property line and connects into the Pleasant Valley and Lake Canal in the west -central portion of the site. The area generally slopes to the east and exhibits fair surface drainage in this direction. The property is bordered by fields to the north and south, Shields Street to the east and The Ridge subdivision to the west. SUBSURFACE CONDITIONS Soil and Bedrock Conditions: As presented on the boring logs, the subsurface materials were encountered in order of increasing depth as follows: • Topsoil and Fill: A Yz-foot layer of silty topsoil was encountered at the surface of borings 1, 2 and 4. A 1-foot layer of fill was encountered at the surface of boring 3. The fill consists of lean clay with sand. The topsoil and the upper Y2-foot of the fill have been penetrated by root growth and organic matter. • Lean Clay with Sand: A layer of brown clay was encountered below the topsoil in borings 1, 2 and 4 and extends to depths of 1 to 6'/z feet below the surface. This brown clay contains moderate quantities of sand and is moist in its in -situ condition. • Sandy Lean Clay: A layer of red clay was encountered at depths of 1 to 2 feet below the surface in borings 1, 3 and 4 and extends to depths of 3Y2 to at least 15 feet below the surface which was the depth explored. The red clay contains substantial quantities of sand and is dry to moist in its in -situ condition. • Clayey Sand with Gravel: A granular stratum was encountered below the red clay layer in borings 1 and 4 and extends to a depth of 11 feet below the surface or to the depth explored. The granular stratum is dry to moist in its in -situ condition. 3 Terracon Nona and Sandy Thayer ELI Project No. 20945089 Field Exploration: A total of four test borings were drilled on April 28, 1994 to a depth of approximately 15 feet at the locations shown on the Site Plan, Figure 1. The borings were drilled in areas of proposed residential construction. All borings were advanced with a truck -mounted drilling rig, utilizing 4-inch diameter solid stem auger. The location of borings were positioned in the field by pacing from fence corners. The accuracy of boring locations should only be assumed to the level implied by the method used to determine the locations. Continuous lithologic logs of each boring were recorded by the engineering geologist during the drilling operations. At selected intervals, samples of the subsurface materials were taken by means of pushing thin -walled Shelby tubes, or by driving split -spoon barrel samplers. Penetration resistance measurements were taken with each sampling with the split -spoon by driving the sampler with a 140-pound hammer falling 30 inches. When properly interpreted, the penetration resistance is a useful index to the consistency, relative density or hardness of the materials encountered. Groundwater conditions were evaluated in each boring at the time of site exploration and 11 or 14 days after drilling. Laboratory Testing: All samples retrieved during the field exploration were returned to the laboratory for evaluation by the project geotechnical engineer, and were classified in accordance with the Unified Soil Classification System described in Appendix C. Samples of bedrock were classified in accordance with the general notes for Bedrock Classification. At that time, the field descriptions were confirmed or modified as necessary, final boring logs prepared, and an applicable laboratory testing program was formulated to determine engineering properties of the subsurface materials. Boring Logs for the project are presented in Appendix A. Selected soil and bedrock samples were tested for the following engineering properties: • Water content • Expansion • Dry density • Plasticity • Compressive strength The significance and purpose of each laboratory test is described in Appendix C. Laboratory test results are presented in Appendix B, and were used for the geotechnical engineering analyses, and the development of preliminary foundation and earthwork recommendations. All laboratory tests were performed in general accordance with the applicable ASTM, local or other accepted standards. 2 PRELIMINARY GEOTECHNICAL ENGINEERING REPORT Terracon COTTONWOOD RIDGE SHIELDS STREET SOUTH OF HARMONY ROAD LARIMER COUNTY, SOUTH OF FORT COLLINS, COLORADO ELI PROJECT NO. 20945089 MAY 11, 1994 INTRODUCTION This report contains the results of our preliminary geotechnical engineering exploration for the proposed project to be located on the west side of Shields Street approximately %a to '/z-mile south of Harmony Road, south of Fort Collins, Colorado. The site is located in the East '/2 of the Northeast '/4 of Section 3, Township 6 North, Range 69 West of the 6th Principal Meridian. The purpose of these services is to provide information and preliminary geotechnical engineering recommendations relative to: • subsurface soil and bedrock conditions • groundwater conditions • foundation design and construction • basement construction • floor slab design and construction • earthwork • drainage The conclusions and recommendations contained in this report are based upon the results of field and laboratory testing, engineering analyses, and experience with similar soil and structural conditions. PROPOSED CONSTRUCTION It is our understanding the proposed project is a single-family residential development on 34 acres of land. Although final site grading plans were not available prior to preparation of this report, ground floor levels are anticipated to be at or near existing site grades. ' SITE EXPLORATION The scope of the services performed for this project included site reconnaissance by an engineering geologist, a subsurface exploration program, laboratory testing and engineering analyses. Nona and Sandy Thayer ELI Project No. 20945089 TABLE OF CONTENTS (Cont'd) Terracon APPENDIX A Site Plan .............................................. Figure No. 1 Logs of Borings .......................................... Al thru A4 APPENDIX B Summary of Test Results ......................................... B1 APPENDIX C: GENERAL NOTES Drilling & Exploration ............................................ C1 Unified Soil Classification ......................................... C2 Bedrock Classification, Sedimentary Bedrock ............................ C3 Laboratory Testing, Significance and Purpose ........................... C4 Report Terminology ............................................. C5 Terracon Nona and Sandy Thayer ELI Project No. 20945089 TABLE OF CONTENTS Page No. Letter of Transmittal................................................... i INTRODUCTION..................................................... 1 PROPOSED CONSTRUCTION ........................................... 1 SITE EXPLORATION .................................................. 1 Field Exploration ...................... 2 Laboratory Testing .............................................. 2 SITECONDITIONS ................................................... 3 SUBSURFACE CONDITIONS ............................................ 3 Soil and Bedrock Conditions ....................................... 3 Field and Laboratory Test Results .................................... 4 Groundwater Conditions .......................................... 4 CONCLUSIONS AND RECOMMENDATIONS ................................. 5 Site Development Considerations .................................... 5 Foundation Systems - Northeast Portion of Site .......................... 6 Foundation Systems - West and Southeast Portions of the Site ............... 6 Basement Construction ........................................... 7 Floor Slab Design and Construction Within 3 Feet of Bedrock ................ 7 Floor Slab Design and Construction On At Least 3 Feet of Non -Expansive Soils .... 7 Earthwork.................................................... 8 General Considerations ...................................... 8 Site Clearing .............................................. 8 Excavation ................... 9 Slab Subgrade Preparation .................................... 9 Fill Materials ............................................. 9 Placement and Compaction .................................. 10 Compliance ............................................. 10 Excavation and Trench Construction ............................ 11 PRELIMINARY GENERAL COMMENTS .................................... 11 Nona and Sandy Thayer Terracon ELI Project No. 20945089 We recommend any residences placed within 2 feet of the bedrock stratum in the northeast portion of the site be supported on a grade beam and straight shaft pier foundation system. This would likely entail permanently lowering the water table in this area. Given the expansive potential of near surface bedrock which may support slabs in this area, consideration should be given to the use of structural floor systems if no movement can be tolerated. Other preliminary design and construction details, based upon geotechnical conditions, are presented in the report. We have appreciated being of service to you in the preliminary geotechnical engineering phase of _ this project, and are prepared to assist you during the final geotechnical, design and construction phases as well. If you have any questions concerning this report or any of our testing, inspection, design and consulting services, please do not hesitate to contact us. Sincerely, `\`������@�? EMPIRE LABORATORIES, INC. N 'N, : P,SCHO� A Division of The Terracon Companies, Inc. = co 23702 ° L R. Schoenfeld, P.E. "%�``�•°°••••°°^•' Geotechnical Engineer / 0''%A F����"`�`' Reviewed by: l�-� ,�s�lrla C. c Chester C. Smith, P.E. Division Manager ' 4808 '0 Nr' LRS/CCS/dmf �'•` r> ®vim Copies to: Nona and Sandy Thayer (4) \�- l CCU' m May 11, 1994 Empire Laboratories, Inc. A Division of The Terracon Companies, Inc. Nona and Sandy Thayer �. c/o Eric Thayer 31741 RCR 35 Steamboat Springs, CO 80487 Re: Preliminary Geotechnical Engineering Report, Cottonwood Ridge Shields Street South of Harmony Road Larimer County, South of Fort Collins, Colorado _ ELI Project No. 20945089 P.O. Box 503 - 301 No. Howes Fort Collins, Colorado 80522 (303)484-0359 FAX No. (303) 484-0454 Chester C. Smith, P.E. Neil R. Sherrod, C.P.G. Empire Laboratories, Inc. (ELI) has completed a preliminary geotechnical engineering exploration for the proposed project to be located on the west side of Shields Street approximately 'A to '/2- mile south of Harmony Road, south of Fort Collins, Colorado. This study was performed in general accordance with our proposal number D2094141 dated April 18, 1994. The results of our preliminary engineering study, including the boring location diagram, laboratory test results, test boring records, and the preliminary geotechnical recommendations needed to aid _ in the design and construction of foundations and other earth connected phases of this project are attached. The subsurface exploration indicated conditions which are typical of soils commonly found in the _ Fort Collins area. The subsurface soils at the site generally consisted of lean clay with sand, sandy lean clay and clayey sand with gravel overlying claystone-siltstone bedrock. The information obtained by the results of field exploration and laboratory testing completed for this - study indicates that clay soil at the site has low expansive potential and bedrock at the site has _ moderate to high expansive potential. The soils at anticipated foundation bearing depths have low to moderate load bearing capabilities. The bedrock at anticipated foundation bearing depth has moderate bearing capability. Based on the preliminary geotechnical engineering analyses, subsurface exploration and laboratory test results, we recommend that the proposed residences in the majority of the site be supported _ on spread footing foundation systems. Slab -on -grade may be utilized for the corresponding interior - floor systems provided that care is taken in the placement and compaction of the subgrade soil. Offices of The Terracon Companies, Inc. Geotechnical, Environmental and Materials Engineers `- Arizona: Tucson 0 Colorado: Colorado Springs, Denver, Ft. Collins, Greeley, Longmont ■ Idaho: Boise ■ Illinois: Bloomington, Chicago, Rock Island ■ Iowa: Cedar Falls, Cedar Rapids, Davenport, Des Moines, Storm Lake ■ Kansas: Lenexa, Topeka, _ Wichita ■ Minnesota: St. Paul ■ Missouri: Kansas City ■ Nebraska: Lincoln, Omaha ■ Nevada: Las Vegas ■ Oklahoma: Oklahoma City, Tulsa ■ Texas: Dallas, Fort Worth ■ Utah: Salt Lake City ■ Wyoming: Cheyenne m QUALITY ENGINEERING SINCE 1965 PRELIMINARY GEOTECHNICAL ENGINEERING REPORT COTTONWOOD RIDGE SHIELDS STREET SOUTH OF HARMONY ROAD LARIMER COUNTY, SOUTH OF FORT COLLINS, COLORADO ELI PROJECT NO. 20945089 Prepared for. NONA AND SANDY THAYER C/O ERIC THAYER 31741 RCR 35 STEAMBOAT SPRINGS, COLORADO 80487 Empire Laboratories, Inc. A Division of the Terracon Companies, Inc. PRELIMINARY GEOTECHNICAL ENGINEERING REPORT COTTONWOOD RIDGE SHIELDS STREET SOUTH OF HARMONY ROAD LARIMER COUNTY, SOUTH OF FORT COLLINS, COLORADO ELI PROJECT NO. 20945089 A Division of The Terracon Companies, Inc.