HomeMy WebLinkAboutCOTTONWOOD RIDGE SUBDIVISION - PRELIMINARY - 31-94 - MINUTES/NOTES - CORRESPONDENCE-NEIGHBORHOOD MEETING6
_ 1'
M 1>�
Z........... = ... _ - _
0
�r
a r\
a ♦` + a i_/'' ��-/� , f 1 1 �AEiIQ�'Y --_� LEGENDAV
♦ I
KI
w. ♦i ' 11, \ I I we ` `♦u. i I I I'ry I
4 /
m 60 120 240
l�eel_ 4
Iww _ I •.�iO4a I �I
\1''• \ ���:` —"a= `` ��_ - -i /� 1j I 1 \ \\ `�\'` MVIM tY UYWY
ids;\♦ `♦�� • I 111 ♦ \ u. i M {
1 \ \ ♦\ `a ♦ �♦ I!, wi m ♦ w. 1 COYYONWM AD(P
�\ ♦♦ � \♦ \ l / 7 \ \\ 3llON15IRd UYOJf
a `�� \ `, \\� '� I i ♦ \ MAY 11994
\/ ,y \` ♦ ♦♦ ♦ -J /, i * I � - u \\% i � COfTOA7QOD rerDci
\ \ \ � \ ♦ III I I~ \ \\ I i r-a na. SEWER "WATER R-MI
Er Msms
nw.
"1
a
a
�
M_
— I�
{�L• j �YOaI
1 �Ir
1
NMY
t ���
��•
i k I�e
0' I. Oa ,
�
j � j �
�1 O
`Ir....
I I
I
f
• i
I I I
I ' I
It
\
'�� ��
Z`I
..a mac•
11 I 1 •�
1
0 60 120 240
- urs
1 NMY _
f
r
I QAPSDON FiLS
1 I o
\ \♦ �`- va � 1 In: I . velaans as m��mlu. «e
♦ I Mill*WY LAYOUT
r. wn ♦ w • \I .wr' 1 COTTONWOOD PDCE
al w II
O O \ \ O 3, 9 UYOIJT
MAY 6
� MAY S B1
`.
CDTT POM�
\ ��� fa I r• s ar COfTO" DR 4'rE
GRAOKi MD ORAl�IYiE RIJJ
ET USIMS
tit • � (' AA aceoa aammvsww
nu
COTTONWOOD RIDGE
GENERAL LOCATION IMP
SUBDIVISION
MAY 1994
ET DESIGNS
3941 RCP -35
STEULR>T FRIG& CO 804F
W�c mm
DRAWING INDEX
SI-EET 1 OF 4 PLAT
SHEET 2 OF 4 GRADING ADN DRAINAGE PLAN
SHEET 3 OF 4 WATER AND SEWER PLAN
SHEET 4 OF 4 DRY UTILITY PLAN
PINNlG CPAWFLS
SSE DATE MY 3 91
CQT %+M RAGE 5LETIY®n
NEIGHBORHOOD INFORMATION MEETING
for
Project:
Meeting Locatioi
Attendees: Please sign this sheet. The information will be used to
update the project mailing list and confirm attendance at neighborhood
meetings. Contact the Planning Department (221-6750) if you `vish to
receive minutes of this meeting.
Did You Receive iCorrect
Written Notification
of this meeting?
ddress.
Name Address Zip
Yes
No
Yes
No
4 �1 7 0005-2
fl o is J- O d Pn r s-,3 A p p)� 6/o s Som Li ne 5'6sz,6
�j L S�F//��pT =�'iS7 ,S��rE6z 3 ADS' a�
✓
'ei X de'e 0 S
ti
V
J
G���
✓
LSC���
Cottonwood Ridge
Neighborhood Information Meeting
Page 3
14. Comment: I am fairly certain that the Applewood Board would want our irrigation
ditch put into a pipe through this property.
15. Question:
Answer:
16. Question:
Answer:
17. Question:
Answer:
18. Question:
Answer:
19. Comment:
Do you have any idea about how much your lots will sell for?
No, we do not know yet.
Will you be doing this in phases?
Yes, we probably will be doing this development in three phases.
Do you know how big your homes will be?
We will not be building the homes, so I can't speak to that tonight.
Do you know the time frame you are projecting for development?
Hopefully, we can be through the review process and be under
construction sometime this fall (1994).
We are all going to miss the horses on this property.
Cottonwood Ridge
Neighborhood Information Meeting
Page 2
5. Comment: The water on this property now drains from this property and flows along
the west side of Shields Street. There are concerns about the effects this
drainage water will have on our irrigation ditch (Applewood).
6. Comment: The City or the County should have some responsibility for the
stormwater along the west side of South Shields Street.
7. Question: Could you speak to the covenants that you are planning for this
development?
0
Answer: We will have covenants, but they are not developed yet.
Question: What do you have in mind for the Applewood Ditch? How do you plan
to handle the ditch with your development?
Answer: We have not yet resolved this question. Chelsea Ridge put this ditch in
a pipe.
Question: What is your opinion as to how we should handle it?
(developer)
Answer: I worry about the ditch being piped and clogging up on us. The
(citizen) culvert at Shields Street is a problem: We just need to keep the
debris out of the ditch/pipe. An open ditch would be easier for us to keep
clean.
10.
Question:
Answer:
11.
Comment:
12.
Comment:
13.
Comment:
Will you be the primary developer & contact? [A: Yes.] Will you have
control over the siting of homes & preservation of trees?
Yes, it is possible to deal with the siting in our architectural controls.
The areas around the Trilby Lateral are of significant concern due to the
stands of trees and terrain.
Ridge Board supports this larger lot proposal and the subdivision concept
vs. a P.U.D.
This plan is good if you can do it.
Date:
Comm- 'ty Planning and Environmental
Planning L)epartment
rvices
Neighborhood Information Meeting Minutes
for
COTTONWOOD RIDGE
May 5, 1994
Applicant: Eric Thayer
31741 RCR #35
Steamboat Springs, CO 80487
City Planner: Steve Olt
The applicant, Eric Thayer, has expressed an interest in developing a single family residential
project on a vacant parcel of land, approximately 34 acres in size, located south of West
Harmony Road on the west side of South Shields Street.
The purpose of this meeting was to introduce Mr. Thayer to the affected property owners and
other potentially affected interests in attendance and enable them to: ask questions, express
concerns or voice support for the development proposal. The following questions, concerns,
comments and responses were expressed at the meeting:
1. Question: Will the ditches be left open or will they be covered?
Answer: That is yet to be decided
2. Question: The area next to the lots at the southwest corner of the property is to be
open space?
Answer: Yes, that is the plan. There is a sensitive area that will probably be
identified by the Natural Resources Department.
3. Question: Where will the bike path go?
Answer: It will be located along the alignment of the PV&LC canal and connect to
the proposed alignment in Westbury to the north..
4. Question: How wide of an easement does the PV&LC canal have?
Answer: We think it is about 50 feet wide in the Westbury PUD and it is probably
the same on this property.
281 North College Avenue • P.O. Box 580 Fort Collins, CO 80522-0580 • (303),221-6750
FAX (303) 221-6378 TDD (303) 224-6002