Loading...
HomeMy WebLinkAboutSTOCKBRIDGE P.U.D. - PRELIMINARY - 27-94 - SUBMITTAL DOCUMENTS - ROUND 1 - DRAINAGE REPORT..... .... . 4 Scale I In feet I VW 500 0 Uw 11* 7= Legend: major drainageway pipe only . . .. ...... .. channel only existing detention area detention area TablePaee 61 drainage n concentration points eIleble 51 FOOTHILLS BASIN I BASIN G I Storm Drainage Improvements West End Figure 8 RESOURCE CONSULTANTS, INC. - Ft. Collins, Colorado 28 Legend: FOOTHILLS BASIN l BASIN G 1 drainage divides open channel with Existing Drainage Patterns direction of flow I West End with di 1 Scale ( in feet ) ewers and drains with direction of flow 1000 Soo 0 1200 general direction of flow Figure 3 ofsurfacedrainage tr pending areas,7= detention ponds, etc. RESOURCE CONSULTANTS, INC. • Ft. Collins, Colorado drainage concentration points I see Table 3 1 R 5. SHIELDS STKEET A-v pLEA9✓WT VALLZY AND L^V-e C,-N MOUNTNINKIDfsB SITE Exlwll, , KG Dc 6 6 g L �F S ENS^ �er LE6wp 9 LKdfs 58c(g1 lat/SIOM wNtccour16e EXHI!!IT 2 JOO No. OW -log 8-99 Table 8 Cost Estimates for Drainage Improvements to Eliminate Existing Drainage Problems for Foothills Basin Storm sewer south of Channel improvements New Mercer Canal and Drake Road west of between Lochwood Drive Larimer County No. 2 Canal Item Union Pacific Railroad and Lemay Avenue drainageway crossings Construction cost $26,000 $207,000 $175,000 Contingencies 20% 5,200 41,400 35,000 Engineering 10%1/ 3,100 24,800 21,000 1/ Legal and administrative 8% 2,500 19,900 17,000 2/ Maintenance 3% 1,100 8,800 7,500 Total cost $37,900 $301,900 $255,500 Annual net benefits 9,800 11,900 1,900 Annual total costa/ 2,700 21,500 18,200 i r Benefit -cost ratio 0 3.63 0.55 0.10 Total contributing acreage Developed 222 ac. 890 ac. 232 ac. Total 244 ac. 1,168 ac. 499 ac. Cost/acre Currently developed area $166/ac. $339/ac. $1,101/ac. Total drainage area $151/ac. $258/ac. $512/ac. 1/Percentage base on construction and contingencies costs. /Percentage for life of project based on total construction cost. 3/Assumes a 50-year project life and a 6-7/8 percent discount rate. Table 7 Unit Costs Used for Cost Estimates of Drainage Improvementsl/ Item Unit Excavation and backfill CY Concrete (reinforced) CY Concrete (flatwork) CY Reinforced concrete pipe T & G Class II 18" LF 24" LF 30" LF 36" LF 48" LF Manholes 6' deep 4' diameter Ea 5' diameter Ea 6' diameter Ea Riprap and filter material CY Pavement patching SY Culvert boring 36" LF 48" LF Seeding and mulching SF Right-of-way costs Undeveloped land SF Developed land SF 1/Based on March 1980 prices. S Cost 3.00 250.00 150.00 22.00 29.00 45.00 62.00 98.00 840.00 1,020.00 1,240.00 30.00 98.00 140.00 0.10 0.50 2.00 -39- RESOURCE CONSULTANTS INC Railroad track indicated that a detention pond in this area would not be feasible. Therefore a major storm sewer is proposed under the Colorado & Southern Railroad and under the Larimer County No. 2 Canal. Several alternatives were analyzed before recommending this solution including development of a major detention facility in this area. The size of the detention facility would have required the purchase of approximately 15 acres of land along with reconstruction of approximately 1,500 feet of the New Mercer Canal. With that expenditure the peak flows would have been reduced to only about 25 percent. Therefore it is recommended that the drainageway improvements proposed be constructed and that detention facilities be constructed upstream of this area in order to minimize the peak flows through these drainage facilities. Three major detention areas are proposed west of Shields Streetas shown in Fig. 10; two of these would capture drainage waters from existing developments west of Shields Street and south of Horsetooth Road (Ponds 17, 18, and 19, Fig. 8). The largest facility would be immediately above the Pleasant Valley & Lake Canal (Pond 19, Fig. 8). This would capture drainage waters from the Imperial Estates area and release them under the Pleasant Valley & Lake Canal in a 24-inch storm sewer. A second detention facility would be constructed at the corner of Shields Street and Horse - tooth Road within the current development. This detention facility would release waters into a 30-inch storm sewer along the west side of Shields Street. An additional detention facility is proposed for the currently undeveloped parcel immediately north of Horsetooth Road west of Shields Street and this would then release into the 30-inch storm sewer on Shields Street. This storm sewer would then cross Shields Street into the major drainage channel that is proposed north of Horsetooth Road. Since many drainage improvements are proposed for the Foothills Basin, the costs were analyzed in order to develop drainage basin fees for future developments within the basin. -37- RESOURCE CON ULTAI`17 INC Table 6 On -Site Detention Requirements for Foothills Basin Pondl� Location Maximum storage (ac.ft.) Maximum outflow (cfs) 1 Intersection of County Rd. 9 and 10.8 85 Drake Rd. 2 Pond on south drainage outfall 8.9 33 3 It 1t 11 5.5 24 4 n It to n n 6.1 24 5 Pond east of Timberline Rd. in Sec. 29 2.1 24 6 11 1t 11 11 11 II II It 1.4 11 7 It to It IT it it it it 4.6 44 8 to if It it to it it it 1.6 24 9 Pond north of Drake Rd. 2.9 11 10 if It to is it 3.7 24 11 ,t if It it IT 5.0 24 12 Pond south of Larimer Co. No. 2 Canal 1.3 24 in Sec. 36 13 Pond at corner of Horsetooth Rd. and 2.7 2 College Ave. 14 Pond west of College Ave. south of 1.15 4 Larimer Co. No. 2 Canal 15 Pond on undeveloped tract in Sec. 26 6.1 11 16 if n it to to 0.8 4 17 Pond in Sec. 27 3.5 11 18 Pond at corner of Shields St. and 7.2 11 Horsetooth Rd. 19 Pond west of Pleasant Valley 5 Lake Canal 14.0 23 1/Exact locations are shown on Figures 9 and 10. -36- RESOURCE CON ULTMTS INC carry this peak flow of storm water during the short time in'which it would occur assuming no drainage enters the canal upstream of the basin. Another area of existing drainage problems is immediately west of College Avenue between Harvard Street and Swallow Road. This study pro- poses the development of an 18-inch storm sewer from the low area along the frontage road of College Avenue to the 54-inch storm sewer near College Avenue north of Foothills Parkway. This would still allow some ponding during major storms but would eliminate ponding during storms of less than 10-year frequency. Proposed development west of College Avenue immediately south of the Larimer County No. 2 Canal plans to construct a detention pond with a 12-inch storm -sewer outfall into the 54-inch storm sewer north of Foot- hills Parkway. The detention requirements for this pond are shown in Table 6 (pond #14). Another area of potential ponding occurs north of Foothills Parkway from Stanford Road to McClelland Drive (between Points L and P, Fig. 8). No drainage channel exists in this area and the analysis indicates the capacity of the existing storm sewer would be exceeded during major storms. Since the area of flooding is entirely in parking lot areas, only minor damage would occur during these major storms. One area of par- ticular concern is the area immediately west of College Avenue. This low area long the frontage road could pond water 3 feet deep before overtopping College Avenue. Therefore it is recommended that buildings constructed in this area be built above the area of potential flooding as shown in the preliminary plans (see appendix of this report). Reach 4 Proposed improvements to Reach 4 of this drainage basin include con- struction of major drainage outfall facilities from Meadow Lark Avenue to McClelland Drive. Also, detention facilities and storm -sewer facilities west of Shields Street are recommended. Since there is potential for overtopping the New Mercer Canal, facilities are proposed that would transport storm water under it. The analysis of storm -water detention facilities immediately west of the Colorado & Southern -35- 1 RESOURCE CONSULTANTS INC Pointy Table 5 (Cont'd) Computed Peak Flows at Various Points Within the Foothills Basin with Improvements (Fully Developed Conditions) Peak Location 2-yr 10-yr Flows (cfs) 25-yr 50-yr 100-yr R Shields St. storm sewer 45 46 46 46 46 S Storm sewer under Pleasant 23 23 23 23 23 Valley & Lake Canal 1/Exact location is shown on Figures 7 and g, -30- RESOURCE CONSULTANTS IIIC Table 5 Computed Peak Flows at Various Points Within the Foothills Basin with Improvements (Fully Developed Conditions) Peak Flows (cfs) Pointl/ Location 2-yr 10-yr 25-yr 50-yr 100-vr A Major drainage outfall at 200 410 510 610 710 Poudre River B Major drainage channel 92 120 140 150 170 north of Horsetooth Rd. C Major drainage channel 180 340 420 530 630 west of County Rd. 9 D North tributary 1/4 mile 56 65 66 69 73 south of Drake Rd. E South tributary storm sewer 49 49 49 49 49 1/4 mi. north of Horsetooth Rd. F Meadows East pond at 4 4 4 4 11 Timberline Rd. G Storm sewer at Drake Rd. 28 30 32 36 39 and Timberline Rd. H Major drainageway at 120 260 310 380 430 Timberline Rd. I Major drainageway at Union 120 260 320 390 440 Pacific Railroad J Warren Lake drainageway 26 72 100 120 160 at Horsetooth Rd. K Major drainageway at 129 190 230 270 307 Lemay Ave. L Major drainageway at 190 350 430 510 580 Stanford Rd. M Warren Lake drainageway 73 160 190 230 270 at Horsetooth Rd. N Horsetooth Rd. storm sewer 7 20 31 38 47 0 Larimer Co. No. 2 Canal 19 46 61 76 90 storm -welter flow at Warren Lake P Culvert under Colorado & 100 110 110 120 130 Southern Railroad and Larimer Co. No. 2 Canal Q Culvert under New Mercer 76 84 85 86 87 Canal Cont'd -29- RESOURCE CON ULTNNTS INC Table 3 Computed Peak Flows at Various Points Within the Foothills Basin (Existing Conditions) Peak Flows (cfs) Pointy Location 2-yr 10-yr 25-yr 50-yr 100 yr A Fossil Creek Reservoir 24 230 330 420 520 Inlet Ditch at County Rd. 9 crossing 2/ B Intersection of Drake 4 56 100 140 180 Rd. and County Rd. 9 C Major drainageway at 20 190 270 340 410 Fossil Creek Reservoir Inlet Ditch D North tributary drainage- 4 18 34 45 57 way at Timberline Rd. E Major drainageway at 22 180 240 280 330 Timberline Rd. F Drake Rd. at Union 13 19 48 50 62 Pacific Railroad G Major drainageway at 23 180 240 280 330 Union Pacific Railroad H Intersection of Horsetooth 25 75 110 140 160 Rd. and Lemay Ave. I. Major drainagway at Lemay 82 160 200 230 280 Avenue J. Major drainageway at 120 260 330 390 450 Stanford Rd. K. Warren Lake drainageway 28 120 170 220 270 at Horsetooth Rd. L. Major drainageway at 5 110 140 180 220 Larimer County No. 2 Canal M. Major drainageway at 28 100 140 170 210 New Mercer Canal N. Major drainageway at 5 70 100 140 180 Shields St. 0. Major drainageway at 19 78 110 140 170 Pleasant Valley & Lake Canal l/The The exact locations of these points are indicated on Figures 2 and 3. flows for Fossil Creek Reservoir Inlet Ditch are storm -water flows only and do.not include normal ditch diversions. -14- Table 2 Impervious Area for Various Land Uses Land Use Zoning Z Impervious Parks, Green Belts and Farmland _ 02 1/ Low Density Residential RL, RP 5 RLP 40Z Medium Density Residential RM 6 RMP 50% High Density Residential, RE 60% Mobile Homes MM 50% Industrial IP h IL 70% Business 6 Commercial BP, BG & HB 90X 1/ Parking Lots, Roads and Farmsteads considered separately. -13- Table 1 Design Storms for Foothills Basin Time Period Rainfall Intensities (inches/hr.) Ending (min.) 2yr 10yr 25yr 50yr 100 y r 5 0.12 0.48 0.48 0.60 0.60 10 0.36 0.60 0.72 0.84 0.96 15 0.48 0.72 0.96 1.08 1.44 20 0.60 0.96 1.32 1.68 1.68 25 0.84 2.16 2.28 2.40 3.00 30 1.80 3.12 3.72 4.44 5.04 35 3.24 5.64• 6.84 7.92 9.00 40 1.08 2.28 2.88 3.24 3.72 45 0.84 1.12 1.56 2.04 2.16 50 0.48 0.84 1.08 1.44 1.56 55 0.36 0.72 0.84 0.96 1.20 60 0.36 0.60 0.72 0.72 0.84 65 0.36 0.60 0.72 0.72 0.60 70 0.24 0.48 0.48 0.48 0.48 75 0.24 0.36 0.36 0.36 0.36 80 0.24 0.24 0.36 0.36 0.36 85 0.24 0.24 0.36 0.24 0.24 90 0.12 0.12 0.36 0.24 0.24 95 0.12 0.12 0.24 0.24 •0.24 100 0.12 0.12 0.12 0.24 0.24 105 0.12 0.12 0.12 0.24 0.24 110 0.12 0.12 0.12 0.12 0.24 115 0.12 0.12 0.12 0.12 0.12 120 0.12 0.12 0.12 0.12 0.12 -12- VI A �►, ��_ J �111 ?� �i • 911 M� • � O r III.• . . • I II I '� I la.. Scale I In feet I 1000 500 O 1200 7= Legend: drainage divides open channel with direction of flow stormsewers and drains with directon of flow general direction of flow of surface drainage ®pending areas, detention ponds, etc. Odrainage concentration points Isee Table 3 1 FOOTHILLS BASIN I BASIN G I Existing Drainage Patterns West End 1 Figure 3 RESOURCE CONSULTANTS, INC. • Ft. Collins, Colorado J}S R� VIS�D )^DR STocK.BR+pGc P IP 6 L. . I n, c l STo�K6i'IIJGE PUc✓ �l- o� ��v��M �I%. 2 S�L�cT �jVFaRM/FT�o�t/ ��piyJ boo r t+ i � Us ,c> r4 si �I .S�Tv p y .mot 5 s j„f- •",.��5 �,�% ._ �- -7z . , h �. t 5 91,5 9-T -.5 4 - �L - 44' >to , L4-, 2 1 -.- ) I I Q 10-711 -2,77 44-1 C-"O S'z 1066 Z 506- Z No Text I �✓ -- ; , �- ('. (�1 J :�... _ 1. ' - L� �.1 _Lz, 24 L, / �) a r, � I. -A - Li .5 33 50 113 3" :50 0-2- \AJ1 Q -1� 0 4.3 3 5L G Tcc- It 5- fc7L f v 3. 5- �z �s z, zoo rr 4 Z05 Itz 1 -�15 Z� Q 71 Z. !71 55-6 of ... ---------- - 1,5 r2o' 115 Je 0 f� p�YGkf /r)Q-�� �o itC C�-�aG� ryes 570O 57 ,)7a l31GDJ �25'0x5= �Z�b 3.5 IS t5 I.7 It �,z L 7-7 Z 51- lzf 72IJ 21�) 7 Coo S- 7'. S-rocK 5R IDGE PL) e D. u 4 U✓o RK St} � � T-S ,8 y L A ND l��v�LaPdl�EA/T S INITY MAP S TO C iql�l.pc,E F up In summary, reflected on the Plan (subject to drainage system the site. STOCKBRIDGE P.U.D. PRELIMINARY STORM DRAINAGE REPORT the proposed storm drainage for Stockbridge as enclosed exhibits is consistent with the Master some modification), and the resulting storm , should adequately protect life and property on STOCKBRIDGE P.U.D. PRELIMINARY STORM DRAINAGE REPORT Due to the relatively small area of the subbasins that will contribute storm runoff from within Stockbridge, the concentration of discharges in the street gutters will be somewhat minor - other than when the 100 year storm enters Stockbridge from Subbasin 0-2. At that location, flows over what the 24 inch storm sewer system will pass to Pond No. A will run in a swale over the storm sewer and - possibly - down the gutter of Highbridge Ct. Other than the effect of the Subbasin 0-2 flows, the largest flow in a gutter will be from Subbasin No. 1. There, a 2 year "minor" design discharge of 2.3 cfs is estimated, and a 100 year "major" design discharge of 8.5 cfs is estimated. The slope of the street is 0.6 percent. According to Figure 4-1 of the design manual and using the following criteria: Cross Slope of 2 %, so a Reciprocal (Z) of 50; a Roughness Coefficient (n) of 0.016 from Table 4-3; an allowable depth of flow in the gutter of 6 inches during a two year storm: and an eighty percent reduction factor, the gutter will carry about 20 cfs before exceeding City criteria for the two year, or Minor, storm. That allowable capacity is much larger (nine times the estimated 2 year storm discharge in the curb and gutter). Obviously, street flows in Stockbridge are well within City of Fort Collins criteria. Storm drainage facilities, or improvements, for the project include cross pans at the intersections where flows are concentrated, storm drain inlets and storm sewers, a limited amount of 2 foot wide concrete trickle pans, and the previously discussed regional drainage and detention facilities. When completed, landscaped, and subject to a warranty period for the improvements, the City of Fort Collins has agreed to provide for future maintenance of the integrity of the drainage capacity. It is uncertain at this time if the ponds will be owned and maintained as to landscaping by the City or a homeowners association. Figure 5-2 of the City Drainage Criteria manual shows a theoretical capacity of 1.2 cfs per foot of length within the allowable 6 inch depth and 6 inch heigth of opening for a 2 year storm. A Reduction Factor of 80 percent shows 0.96 cfs per foot actual capacity. The inlets have all been preliminarily designed to accomodate the estimated 2 year flows divided by 0.96 cfs per linear foot. STOCKBRIDGE P.U.D. PRELIMINARY STORM DRAINAGE REPORT The Time of Concentrations were determined using the equation for overland flow in the City design manual, and then by adding the time of concentrated gutter flow. The time of concentrated flow was estimated using Figure 3-2 "Estimate of Average Flow Velocity for Use with the Rational Formula" provided in the "Urban Hydrology for Small Watersheds" Technical Release No. 55, USDA, SCS January, 1975. The formula for overland flow Time of Concentration is: Tc = [1.87 (1.1 - CCf) D1/23 / S1/3 The subbasins within Stockbridge are relatively small. The maximum time of concentration for any of the sub basins in this filing is 19.6 minutes for sub basin # 1. A 10 minute minimum time of concentration was used for several of the subbasins, since the overland and concentrated times of concentration for those basins did not exceed 10 minutes. Several subbasins have times of concentration around 15 minutes. The subbasins contributing storm water runoff from off -site in Imperial Estates have significantly longer times of concentration since they have long overland flow lengths at relatively flat slopes. There is no curb and gutter in Imperial Estates, so the concentrated flows occur in roadside ditches. The concentrated flow times were calculated as though curb and gutter does exist.- someday it might. The longest time of concentration for the off -site basins is 50.6 minutes (2YR) and 47.4 (100YR) in Subbasin 0-2, which extends over 3,000 feet to Taft Hill Drive on the west side of Imperial Estates. The Time of Concentration for combined subbasins at the Design Points is determined using the longest time of concentration for any of the subbasins contributing at that point. The longest time of concentration for combined flows is 15.9 minutes during a two year storm and 14.3 minutes during a 100 year storm for on -site Subbasins 11 and 13 at Design Point II, which is the 4 foot inlet on the west side of Seneca just south of Horsetooth Road.. Rainfall intensities vary in the on -site subbasins from 1.9 to 2.5 inches per hour for a two year storm and from 5.6 to 7.2 inches per hour for the 100 year storm. The off -site Subbasin rainfall intensities vary from 1.1 to 1.9 and 3.2 to 5.6 for the same events. "C" values (Runoff Coefficients) were chosen to be reflective of the overall subdivision density - 0.5 on -site and 0.35 off -site. III. DESCRIPTION OF STREET FLOWS AND DRAINAGE IMPROVEMENTS TABLE 1 HYDROLOGIC CHARACTERISTICS STOCKBRIDGE P.U.O. 2 YEAR 100 YEAR BASIN AREA C VALUE TIME OF TIME OF DESIGNATION CONCEN- CONCEN- TRATION TRATION (ACRES) (MIN) (MIN) i 2-YR i t00-YR 9 2-YR R 100-Y DESIGN POINT (inlhr) (inlhr) (CFS) (CFS) No. 1 2.42 0.5 t9.6 17.6 1.9 5.6 2.3 8.5 No. 2 1.11 0.5 15.4 13.9 2.1 6.3 t.2 4.4 No.3 1.65 0.5 14.7 13.2 2.1 6.4 t.7 6.6 No.4 1.99 0.5 15.7 14.t 2.t 6.2 2.t 7.7 No. 5 1.4t 0.5 17.t 15.4 2.0 6.t 1.3 5.4 No.6 1.33 0.5 16.t t4.5 2.0 6.0 t.3 5.0 No.7 1.43 0.5 t7.1 15.4 2.0 6.1 1.4 5.5 No.8 1.t2 0.5 14.4 13.0 2.1 6.0 1.2 4.2 No.9 1.03 0.5 10.8 10.0 2.4 7.2 t.2 4.6 No. 10 t.03 0.5 12.4 tt.2 2.3 7.0 t.2 4.5 No. It 0.93 0.5 15.9 14.3 2.1 6.t t.0 3.5 No.12 2.13 0.5 16.1 14.5 2.t 6.1 2.2 8.1 No.13 0.25 0.5 t0.0 10.0 2.5 7.2 0.3 1.1 No. t4 t.19 0.5 10.2 10.0 2.5 7.2 1.5 5.4 No. t5 4.51 0.5 16.2 14.6 2.1 6.t 4.7 17.2 No.16 1.2t 0.5 t0.0 t0.0 2.5 7.2 1.5 5.4 No.17 t.27 0.5 10.0 10.0 2.5 7.2 t.6 5.7 No.18 0.56 0.5 10.0 10.0 2.5 7.2 0.7 2.5 No. t9 0.57 0.5 t0.5 t0.0 2.5 7.2 0.7 2.5 No.20 0.64 0.5 t0.0 t0.0 2.5 7.2 0.8 2.9 No.2t 1.61 0.5 t0.0 t0.0 2.5 7.2 2.0 7.2 No. 0-1 15.5 0.35 42.7 39.0 t.2 3.6 6.5 24.6 No. 0-2-a 2.0 0.35 19.3 t7.5 1.9 5.6 t.3 4.9 No.O-2-b 3.3 0.35 19.3 17.5 1.9 5.6 2.2 8.t No. 0-2 46.2 0.35 50.6 47.4 t.1 3.2 t9.8 72.5 COMBINED FLOWS 0-1612 17.63 0.37 19.2 17.5 1.2 3.6 12.3 27.4 I 1tE13 1.18 0.5 t5.9 14.3 2.1 6.1 1.2 4.5 II 9 d t0 2.06 0.5 12.4 it.2 2.3 7.0 2.4 9.0 1II 81 9 6 t0 3.18 0.5 14.4 13.0 2.1 6.0 3.3 11.9 IV 0-2, 9-1-abb, 60.42 0.37 50.6 47.4 1.1 3.2 24.6 89.4 V 20,415,610 NOTE; "C" VALUES ARE BASED ON 0.35 FOR THE LOW DENSITY DEVELOPMENT 1N IMPERIAL ESTATES AND 0.5 FOR THE MEDIUM DENSITY DEVELOPMENT PROPOSED IN STOCKBRIDGE STOCKBRIDGE P.U.D. PRELIMINARY STORM DRAINAGE REPORT No. A, a 15 inch RCP culvert will be installed in the sag curve of Seneca to drain into Pond No. B, a 15 inch ADS N-12 culvert from Highbridge Court to Pond No. C. and a 15 inch ADS N-12 storm sewer from the end of Bridge Court to Detention Pond No. C. A 24 inch ADS N-12 will extend downstream from Pond No. C under the Pleasant Valley ditch. This office will investigate how to either get the remainder of the 24 inch storm sewer extended downstream to Shields and Horsetooth or to make temporary release provisions that will daylight the detention ponds. Additional drainage improvements include 2 foot concrete trickle channel with additional swale capacity for larger flows in backyard areas where two percent slopes are not achievable, culvert end sections, area inlets, street gutter inlets/catch basins. and storm drain manholes. Discharge quantities were estimated for each of the subbasins using the Rational Method. The 2 year Minor storm and 100 year Major storm discharges are identified on the storm drainage chart included as Table 1 on the following page - and on the Preliminary Storm Drainage Plan, which is at Exhibit B to this report. Where storm drainage runoff from individual subbasins converge, the combined, or concentrated, flows are identified as Design Points. At those points the peak flows from the combined subbasins were estimated. Those discharges are also shown on Table One and the drainage plan. The Design Points are indicated on the chart and are located on the plan. The Hydrologic Characteristics for the subbasins in Mountain Ridge, as well as for the combined subbasins at the respective Design Point are included on the following page as Table I. STOCKBRIDGE P.U.D. PRELIMINARY STORM DRAINAGE REPORT be provided with the development. There are also two ponds to be constructed on the east side of Seneca above the irrigation ditch. The proposed Detention Ponds at the southwest corner (No. A) of Seneca and Horsetooth and at the southeast corner (No. D) detain storm runoff from Subbasins 0-1, 11, 12, 13 and 14. They contain one to one and one-half acre feet of volume each. The detention ponds (No. B and No. C) on the west and east side of Seneca Street approximately 600 feet south of Horsetooth detain storm runoff from Subbasin No.'s 0-2-a, 0-2-b, 0-2, 2, 3, 4, 5, 6, 7, 8, 9, 10, 15, 17, 18, 19 and 20. Detention storage volumes totaling 10.5 acre feet are provided in ponds B and C. The total of the provided volumes for storm water detention are close to the 14 required in the Foothills Master Storm Drainage Basin. Subbasin No.'s 1 and 16, which are mostly rear lot areas for the lots backing up to Mountain Ridge, will drain southerly. Mountain Ridge Detention facilities to the south will be sized to accomodate these very minor flows. This office is also providing the engineering services for the Mountain Ridge project. We will work with RBD Engineering to finalize the regional detention facilities to be built in and adjacent to Mountain Ridge. We anticipate also working with Resource Consultants, which did the Foothills Basin study and report for the city. If necessary, another firm such as RBD will be retained to assist in finalization of the regional detention facilities for Stockbridge. There are numerous other storm drainage improvements to be provided with the Stockbridge development. Sidewalk culverts (i.e. curb chases) will be provided where drainage Subbasin No.'s 3 and 5 contribute runoff to the west side of Seneca. A 24 inch Reinforced Concrete Pipe (RCP) culvert will extend upstream from Pond No. B under Bridgeplace Court and then as ADS N-12 plastic pipe culvert to the upper end of Subbasin No. 4 and Highbridge Court. At this location, storm runoff from Imperial Drive in Imperial Estates is contributing storm runoff to the Stockbridge site from Subbasin 0-2. The 24 inch pipe will carry the majority of the flow from Subbasin 0-2. Major 100 year storms will cause some overflow of the inlet area and cause some of the storm runoff to be carried in the street gutters and in a 2 foot concrete trickle channel and associated Swale that is to be provided in the rear lot area of Subbasin No. 5. Other storm sewer to be provided include a 15 inch RCP culvert crossing of Seneca Street between Detention Pond No.'s A and D, and a 24 inch RCP culvert crossing of Seneca between Pond No.'s B and C. Also, a 15 inch ADS N-12 culvert will be installed in the sag curve of Horsetooth Road to drain into Pond STOCKBRIDGE P.U.D. PRELIMINARY STORM DRAINAGE REPORT inch water distribution system in the Seneca Drive alignment, and future sanitary sewer service to Imperial. Estates via a sewer main to be stubbed to the Imperial Drive alignment. The detention facilities to be provided in Stockbridge will further benefit the neighborhood as a means to assist in protection of the properties downstream/easterly of Stockbridge. The storm drainage exhibits supporting this report are as follows: A. Preliminary Plat, which shows the street and lot layout - as well as information on tracts, easements, etc. B. Preliminary Storm Drainage Plan, which shows the drainage Subbasin boundaries, flow arrows, slopes, culverts, inlets, and the basic storm system in general. C. Preliminary Grading and Erosion Control Plan, which shows the Proposed contours at 2 foot intervals. Generally speaking, erosion control measures for the entire site will be designed in final form with each filing - as the final plans are processed. Improvements will include gravel filters and hay bales at storm sewer pipe inlets, re -seeding with temporary grass within developed lots, and permanent grass seeding or coding in greenbelt areas. II. Proposed Storm Drainage Plan The proposed drainage plan for the Stockbridge P.U.D. is in general compliance with the City's Master Drainage Plans. The on -site sub basin boundaries are close to those boundaries depicted on the Master Plans, except the extreme southwest portion of the site as designed flows southerly in Seneca St. to the regional detention ponds in Mountain Ridge. All of the subbasins within Stockbridge P.U.D. are identified at Exhibit B, which is the Preliminary Storm Drainage Plan. Additional grading and drainage information is provided at Exhibit C, which is the Preliminary Grading and Erosion Control Plan. Both are included with this report and were also submitted separately as a part of the preliminary plan submittal. Storm runoff from drainage basins within the site are designated as Subbasin Ws 1 through 20, and basins contributing storm runoff from off -site (Imperial Estates to the west) are designated as Subbasin Ws 0-1, 0-2-a, 0-2-b and 0-2. Storm drainage runoff from all of the subbasins on the west side of the project (i.e. west of Seneca), except Subbasin No. 1 that drains southerly, will be routed through detention ponds to STOCKBRIDGE P.U.D. PRELIMINARY STORM DRAINAGE REPORT low density (1 lot per 5 acres) residential neighborhood - Richmond Estates - to the intersection of Horsetooth Road and Shields Street. The existing irrigation ditch crosses the property from north to south approximately 1,400 feet west of Shields Street. The irrigation ditch then extends from north to south through Mountain Ridge P.U.D. and beyond to its confluence with Fossil Creek. It is discussed in detail in the above mentioned reports, but currently the ditch is a non -factor when discussing storm drainage flows on the Stockbridge site. It is presumed full of water during the 100 year, or "Major" Storm. Generally, the Stockbridge site slopes from west to east at one to two percent. Off -site storm drainage will enter the site from the west from Imperial Estates. The off -site contributing drainage basins and flows are identified on the Foothills Master Drainage Basin Report. This office used a city orthophoto to further delineate the off -site subbasins as they contribute storm drainage to Stockbridge. The on -site storm drainage system is designed to accommodate the storm water flows from off -site, as well as provide the facilities for the storm water flows originating within the Stockbridge P.U.D. The site has previously been processed for residential development through the City of Fort Collins. The previous development plan is modified in this proposal. Some improvements other than storm drainage are described as follows: A 15 inch "trunk/outfall" sanitary sewer system will be constructed in the north/south aligned Seneca Street to provide sewer service to the project, and further to extend northerly under Horsetooth Road to serve properties north and west of the site. An existing 12 inch water main system also exists in Seneca, which will provide the needed domestic water tie-ins for the project. Basin wide improvements are required for all of the City Designated Storm Drainage Basins. Certain basin storm drainage improvements are identified in each of the Drainage Basin Utility Construction Plans. Drainage Basin Fees are collected in each City designated basin to offset the anticipated cost of basin wide improvements. As stated, additional information regarding the City's Foothills Basin can also be obtained in current form at the City Storm Water Utility Department. Some of the benefits of the project include allowing a portion of Horsetooth Road to be widened, Seneca Street to be extended for 1,400 feet, the important 15 inch trunk sewer system to be installed, provide better utilization of the existing 12 STOCKBRIDGE P.U.D. PRELIMINARY STORM DRAINAGE REPORT I. GENERAL INFORMATION Stockbridge P.U.D. is a proposed residential subdivision in the City of Fort Collins, Colorado. The site is generally located on the south side of Horsetooth Road about one —quarter mile west of Shields Street in southwest Fort Collins. A general Vicinity Map is provided at the end of this report. This preliminary storm drainage report is for the entire Stockbridge property, which consists of the majority of the West 1/2 of the of the North 1/2 of the Northeast 1/4 of Section 34, T7N, R68W, Sixth Principal Meridian, Larimer County, Colorado. The Pleasant Valley and Lake Canal Company irrigation ditch exists along the east boundary, Horsetooth Road on the north, Imperial Estates (a low density county residential neighborhood) on the west, and the proposed Mountain Ridge P.U.D. residential development on the south. The proposed development for the Stockbridge site is for approximately 130 single family homes on relatively small lots (50 feet by 100 feet -typical). The residential uses planned for the property are consistent with the approved Master Plan for the property. However, when the property was originally platted in the early 1980's, condominium units were proposed. Now the plan is for detached single family homes. Stockbridge P.U.D. is a part of the properties identified in the city's Foothills Storm Drainage Basin. A small portion of the site on the south side that is located in this "Master Drainage Basin" will drain southerly into the city designated McClleland — Mail Creek Storm Drainage Basin. City funded reports on both basins are quite lengthy, and are not attached in full as a part of this report. Both reports are available at the Stormwater Utility Department of the City of Fort Collins. Certain pertinent portions of the Foothills Basin are included in Addendum A to facilitate review of the storm drainage system for Stockbridge. The Foothills report identifies the need to construct Regional Detention facilities within the Stockbridge P.U.D. The description of those improvements are generally defined as follows: 1. Build storm water detention facilities on the west side of the.Pleasant Valley Ditch that wiil provide 14 acre feet of detention volume and reduce the peak discharge from the 100 year "Major" storm from 170 to 23 cubic feet per second (cfs). 2. Construct a 24 inch diameter storm sewer from the detention facilities downstream under the irrigation ditch and, ultimately, through undeveloped land to the east and an existing THIS PRELIMINARY STORM DRAINAGE STUDY AND REPORT FOR STOCKBRIDGE P.U.D. WAS PREPARED BY LAND DEVELOPMENT SERVICES USING THE CITY OF FORT COLLINS STORM DRAINAGE DESIGN CRITERIA, dated May, 1984. The results of this drainage study are reported in the enclosed text and supporting documents, 'and are shown in further detail on the Preliminary Plans submitted concurrently with this report. Signed this 41h-�QY-Qi-April, 1994. Dennis L. Donovan, P.E. Land Development Services 309 W. Harmony Road Fort Collins, Colorado 80526 Phone (303) 225-9244