HomeMy WebLinkAboutCHRIST FELLOWSHIP CHURCH - PDP / FDP - 29-94C - CORRESPONDENCE - STAFF'S PROJECT COMMENTSe Number: 11 Created: 6/2/2003 No foundation plantings are being shown - see section 3.2.1(E)(2)(d) Number: 12 Created: 6/2/2003 Need to see building envelope, footprint, dimensions, distances to property lines Number: 13 Created: 6/2/2003 Building does not meet build -to line requirements, future building envelope won't meet build -to -lines either. Number: 14 Created: 6/2/2003 Landscape plan needs to include the landscape assurances clause. Number: 15 Created: 6/2/2003 Building square footage isn't noted anywhere, number of parking spaces isn't noted. Need to show typical stall dimensions, back-up distance etc. Number: 16 Created: 6/2/2003 This is in the neighborhood sign district - if any signage is proposed to be on the building, its LOCATION needs to be shown on the elevations - not the the actual signage, just the sign locations. Be sure and return all of your redlined plans when you re -submit. If you have any questions regarding these issues or any other issues related to this project, please feel free to call me at (970) 221-6750. Sincerely: Ted Shepard Chief Planner Page, 5 • along Ziegler as shown. Water Utilities and Forestry have agreed upon the following adjustments to address this conflict. The trees are to be changed to ornamentals and are to be located 5 feet west of the sidewalk. Topic: Utility plans Number: 29 Created: 6/11 /2003 Show thrust block on the fire line and the curb stop/meter pit on the domestic water service. Number: 30 Created: 6/11 /2003 The sewer service elevation at the sewer main would be more than 0.02 feet (or 0.2 feet) higher than the invert of the sewer. Refer to the sewer service connection detail. Number: 32 Created: 6/11 /2003 Clarify that the sanitary sewer for the first phase goes to Manhole #5 which is beyond the line labeled "End Construction". Department: Zoning Issue Contact: Jenny Nuckols Topic: ZONING Number: 4 Created: 6/2/2003 There is not a separate site plan - if landscape and site are to be combined in one , please note as such on the plan Number: 5 Created: 6/2/2003 Handicap spaces are not the correct size - should be 13 feet wide since they are not next to a ped walk way that is at the same grade as the stall. 3.2.2(K)(5)(a) Number: 6 Created: 6/2/2003 Show placement of and label bike rack(s) Number: 7 Created: 6/2/2003 Why is the grass area directly south of the building surrounded by a 3' tall chain link fence? Number: 8 Created: 6/2/2003 Why are there 6' privacy fences surrounding little 9 x 14 areas - what are those areas for? (Directly west of building) Number: 9 Created: 6/2/2003 Is there going to be a trash enclosure anywhere? Number: 10 Created: 6/2/2003 Show handicap ramps at the entrance off of Zeigler Page 4 • Number: 25 Created: 6/11/2003 According to the LCUASS, directional access ramps are required for intersections with detached walks. Please replace the proposed radial stlye ramps at Ziegler and Charlie Lane with three directional ramps (see red lines). Please note that there are new ADA standards for access ramps. Number: 26 Created: 6/11/2003 Please include a vicinity map on the site plan. Number: 27 Created: 6/11/2003 According to section 3.2.2 of the City's LUC, bicycle parking needs to be provided. Please include enough bike parking for 4 bikes near the building's entrance in a visible secure location and near an accessible ramp. See red lines for suggested location. Number: 28 Created: 6/11/2003 The proposed driveway approach from Charlie Lane needs to be replaced with the standard driveway approach for local streets. See drawings 706 (Type 1 for detached sidewalk) and 1601 in the LCUASS for the correct driveway and sidewalk design. Department: Water Wastewater Issue Contact: Jeff Hill Topic: General Number: 20 Created: 6/11/2003 If this project is to be a revision to the approved utility plans then provide all sheets of the approved plans which show a revision, bubble the revision and note the revision. If it is not a revision to the approved plans then provide a complete set of utility plans (i.e. sanitary sewer profile, type, details, etc.). Number: 21 Created: 6/11/2003 The water main in Charlie Lane was installed and according to our records no stubs were installed for this site. Connections to an existing water main should be made with wet taps not tees. Correct the notes pertaining to the tees on the fire line and fire hydrant. Number: 23 Created: 6/11/2003 Place the proposed curb stop 1 foot from the rear of the utility easement and the meter pit no more than 2 feet downstream of the curb stop. See utility and landscape plan for other comments. Department: Water Wastewater Issue Contact: Roger Buffington Topic: Landscape plan Number: 31 Created: 6/11/2003 Show the 24-inch water main and the fire hydrant near Ziegler on the landscape plan. There is currently a conflict between the 24-inch main and the row of trees Page 3 a Topic: Utility plans Number: 35 Created: 6/12/2003 Please provide revisions to the originally approved plans. Provide a phasing plan showing what improvements will be done with each phase. The currently submitted plans do not show where the drainage oufall is, please clarify. Please provide an erosion control plan for this particular phase of development. Since these plans are part of a new PDP, newer regulations such as water quality requirements are now in effect. Please either provide some water quality treatment or request a variance. Provide a drainage and erosion control report addendum discussing drainage, detention requirements, erosion etc..., and how site requirements are being satisfied for this first phase submittal. Department: Traffic Operations Issue Contact: Ward Stanford Topic: General Number: 18 Created: 6/4/2003 The TIS for this project was done in 1995. Unfortunately since this development has not started in so many years, the study needs to be revised to reflect current growth. Topic: Transportation Number: 33 Created: 6/11 /2003 The 1995 TIS needs to be revised to account for current and future area development. If the project is to be phased, the revision should include discussion concerning the overall and phased elements of the development. Number: 34 Created: 6/11 /2003 Only received a grading plan. A plan set indicating all improvements by phase would be appropriate. Department: Transportation Planning Issue Contact: Tom Reiff Topic: Transportation Number: 22 Created: 6/11 /2003 The proposed handicap parking spaces need to be designed to ADA standards - 96" minimum stall width and either a 60" or 96" accessible aisle adjacent to the stall along with an accessible ramp. The wider aisle is for a van accessible stall. Page 2 STAFF PROJECT REVIEW City of Fort STEWART & ASSOCIATES DICK RUTHERFORD 103 S. MELDRUM FT. COLLINS, CO 80521 Date: 6/27/2003 Staff has reviewed your submittal for CHRIST FELLOWSHIP CHURCH PDP - TYPE II (LUC), and we offer the following comments: ISSUES: Department: Engineering Issue Contact: Dave Stringer Topic: utility plans Number: 1 Created: 6/2/2003 Revision to signed set of plans should be numbered as sheet 3A of 13 Cloud the area's being changed and use number of revision in a triangle, show in revision block Number: 2 Created: 6/2/2003 Add note : Phase II to be constructed at future date Number: 3 Created: 6/2/2003 Show surface material on 2nd point of acces(southern most) off of Ziegler Road Department: Light & Power Issue Contact: Doug Martine Topic: Light & Power Number: 19 Created: 6/9/2003 A landscape plan showing planned streetlights has been sent to Ted Shepard to be forwarded to the applicant. These planned streetlights must be shown on the landscape plan, and the street tree locations adjusted to provide 40 ft. minimum clearance between the trees and each streetlight (15 ft. if the tree is an ornamental). Department: Stormwater Utility Issue Contact: Basil Harridan Topic: Grading Plan Number: 37 Created: 6/12/2003 Plan should show how the proposed grading would tie into existing elevations, currently the plans do not call out or show existing contours on the subject property, the future phase, or surrounding property. The currently submitted plan is inadequate for a complete and thorough review to be done. Topic: Off -site easements Number: 36 Created: 6/12/2003 Please provide a copy of an existing off -site easement if one was obtained with the original plan approval. If not then an off -site drainage easement is required. Page 1