Loading...
HomeMy WebLinkAboutCHRIST FELLOWSHIP CHURCH - PDP / FDP - 29-94C - CORRESPONDENCE - RESPONSE TO STAFF REVIEW COMMENTS� STAFF PROJECT REVIEW Gtvof Fort Collins STEWART & ASSOCIATES Date: 8/7/2003 DICK RUTHERFORD 103 S. MELDRUM FT. COLLINS, CO 80521 Staff has reviewed your submittal for CHRIST FELLOWSHIP CHURCH PDP - TYPE II (LUC), and we offer the following comments: ISSUES: Department: Light & Power Issue Contact: Doug Martine Topic: Light & Power Landscape plan submitted for comments due August 6, 2003 showed the streetlight locations as required (previous review ID #19). However, the street trees shown have not adjusted to provide the required 40 ft. clearance from streetlight to shade type street trees or 15 ft. clearance to ornamental trees. Department: Water Wastewater Issue Contact: Jeff:Hill Topic: Landscape plan x t Coordinate landscape and civil plan to reflect the same information. Include the standard general notes on the landscape plans pertaining to landscape utility separation distances. Show all existing and proposed water/sewer lines on the landscape plans. Maintain the required landscape/utility separation distance between the proposed fire hydrant and the proposed water/sewer services. ,To�pic: utility plans Provide stationing of proposed sanitary sewer service from downstream manhole. See site, landscape and utility plans for other comments. Department: Zoning Issue Contact: Jenny Nuckols Topic: zoning the site and landscape plan do not match - please review everything and re -submit when previous comments have been responded to. Sincerely: — --� E/� 1 Ted Shepard 'y Chief Planner � n , . LoA 7e 7 Gv 1�� t[� Page 1