Loading...
HomeMy WebLinkAboutCHRIST FELLOWSHIP CHURCH - PDP / FDP - 29-94C - SUBMITTAL DOCUMENTS - ROUND 1 - TRAFFIC STUDYresidential development will be located to the south. To the north and east of the site are large lot residential uses. The Fort Collins Hewlett-Packard facility is south of the Strachan/Shields PUD. ' Land in the area is essentially flat. The center- of Fort Collins lies to the northwest of the project site. I Roads The primary streets near the proposed project are CR9 and ' Charlie Lane. CR9 is on the west side of the site. It is a north - south street designated as an arterial north and south of Harmony Road. Adjacent to the site, it has a two lane rural cross section. ' CR9 has recently been improved to provide bike lanes on both the east and west sides. There is a signal at the intersection of Harmony/CR9. Charlie Lane is a two lane gravel road which borders the northern side of the site. It provides access to approximately 6 single family residences. To the north of Charlie Lane, approximately 350 feet, is Michelle Lane. Michelle Lane currently is a T-intersection to the east of CR9. The English Ranch development will connect to CR9 across from Michelle Lane. ' Existing Traffic ' Peak hour traffic flow at the CR9/Charlie Lane intersection is shown in Figure 2. The count volumes on CR9 are based upon traffic counts performed in 1994 at the intersection of CR9 and the ' entrance to H.P. Raw traffic count data is provided in Appendix A. The 1994 data was used since CR9 has been under construction and is, therefore, restricted to local traffic only in 1995. The traffic depicted on Figure 2 for Charlie Lane was estimated and rounded up to the nearest 5 vehicles, based upon the existing number of residences. ' Existing Operation Table 1 shows the operation at the CR9/Charlie intersection 'I during the peak hours. Calculation forms are provided in Appendix B. Appendix C describes level of service for unsignalized intersections from the 1994 Highway-- Capacity Manual. This ' intersection is currently operating at an acceptable level of service. As. defined by the City of Fort Collins, a level of service D or better is acceptable: LJ 2 I 11 I i 1 11 III 0 UNSIGNALIZED INTERSECTIONS Intersectiori7otal Delay = (Vehicle 7otal Delay x Volume) _ Volume Level -of -Service (Iri►ersection) Level -of -Service Average Total Delay, sec/veh A <_5 B >5and 510 C > 10 and <_ 20 D >20and 530 E > 30 and <_ 45 F > 45 f no low �' .aw Center For Microcomputers In Transportation HCS: Unsignalized Intersection Release 2.1 Pape 1 ++�++. � a it+r r r x� �+r w t++� * r x�� x a x s r r+++c. •+r a �+a: � x x+s+�+r e r r r++� •+r s File Name ................ 9AD15P.HC0 Streets: (N-Si CP.9 (E-W) ACCESS DRIVE Major Street Direction.... NS Length of Time Analyzed... 60 (min) Analyst ................... DRC: Date of Analysis.......... 7/20/95 Other Information......... LOWS RANGE (2015) - PM PEAL( HOUR Two-way Stop-,ontrolled Intersection Northbound Southbound Eastbound Westbound L T P.I L T RI L T R: L T R ____ __-_ -___ ____ ____ ---- No. Lanes 0 1< 01 O` 1 nl 0 n 0: 1 0 1 Stop/Yield 1 N: N: Volumes 1025 15: 15 210 10 20 PHF .95 .95: .95 .95 .95 .95 Grade 0 0 0 i 0 MC's C'/,) O O1 0 O 0 0 SU/RV's (%)I 0 0: 0 0 O 0 CV's C%) O 01 0 0 i 0 0 PCE's 1.1 1.1: 1.1 1.1 ' 1.1 1.1 Adjustment Factors Vehicle Critical Follow-up Maneuver Gap (tg) Time (tf) __________________________________________________________________ Left Turn Major Road 5.00 2.10 Fight Turn Minor Road 5.50 2.60 Through Traffic Minor Road 6.00 3.30 Left Turn Minor Road 6.50 3.40 Center For Microcomputers In Transportation HCS: UnsiQnalized Intersection Release --.1 Page x a +� �+� r �. is r r+r � i � w+� � � a w it � r+x w �! r � �.. �+* <� w ir+r � � • r � � •++r w *+aF+� � a+• WorkSheet for TWSC: Intersection ___________________________________________ Step 1: PT from Minor Street W8 Conflicting Flows: (vph) 1022 Potential Capacity; (pcph) 415 Movement "Capacity: (pcph) 415 Prob. of Queue -free State: 0.94 ------------------------------------------- Step ZI: LT from Major Street S8 ------------------------------------------- Conflicting Flows: (vph) 1040 Potential Capacity: (pcph) -54e Movement Capacity: (pcph) 548 Prop. of Queue -free State: 0.97 TH Saturation Flow Rate: (pcphpl) 1700 P.T Saturation Flow Rate: (pcphpl) Major LT Shared Lane Prob. of Queue -free State: 0.9E ------------------------------------------- Step 4: LT from Minor ------------- StreetWB _____________________ Conflicting Flows: - (vph) 1358 Potential Capacity: (pcph) 173 Major LT, Minor TH Impedance Factor: 0.96 Adjusted Impedance Factor: 0.96 Capacity Adjustment Factor - due tr. Impeding Movements 0.96 Movement Capacity: (pcph) 166 ES 1104 ED Center For Microcomputers In Transportation HCS: Unsionalized Intersection Release 2.1 Pape 3 r a � w • r a+* � • ar+■ a r a � r w ac w a r w � w •+w * • a a a+* s � a+• �++� � ar � a � � a a • a * it+w �: � • it Intersection Performance Summary F1owRate MoveCap SharedCap Ava.Total Delay Movement v(pcph) Cm(pcph) Csh(peph) Delay LDS by App ________ ______ ______ ______ ------------ ------ ------- WE' L ,_ 166 D 6.5 WD P 23 415 9.2 6 SD L 18 548 6.8 8 ID.3 Intersection Delay = U.2 Center For Microcomputers In Transportation HCS: Unsianalized Intersection Release 2.1 F'age 1 +FfF+r�ta++e«�atiti!.at+�at+x+* rraar�+F.*�w.�++«�w++rr�air.�eit++••r++at+att� File Name ................ 9AD15A.HC:O Streets: (N-S) CPS (E-WI) ACCESS DRIVE Major Street Direction.... NE Length of Time Analyzed... 60 (min) Analyst ................... DFr,: Date of Analysis.......... 7/20/95 Other Information......... LONG RANGE (2015) - AM PEAK HOUR Two-way Stop -controlled Intersection Northbound Southbound I Eastbound 1 Westbound L T R: L T Ri L T R: L T ____ ---- P, ;____ --__-__- No. Lanes 0 1: of ---- ____---- ;---- 01, 1 01 ____ ---- :---- 0 o 01 1 O 1 Stop/Yield NI N: Volumes 295 ., , 45 915 15 30 PHF .95 .951 .95 .95 .95 .95 Grade 0 0 i 0 0 MC'S (%) 0 of 0 0 0 o SU/RV's (%)1 O 01 0 0 i O 0 PCE's 1.1 1.1: 1.1 ..1 l.i 1.1 Adjustment Factors Vehicle Critical Follow-up Maneuver - Gap (tg) Time (tf) __________________________________________________________________ Left Turn Major Road 5.00 2.10 Riaht Turn Minor Read 5.50 2'. Go Through Traffic MinorRoad.6.00 3.30 Left Turn Minor Road 6.50 3.40 Center For Microcomputers In Transportation HCS: Unsignalized Intersection Release --.1 Page 2 t-� rt at ♦ s • it x �++at at x r s x s • x � �. r r � at r+a a� •+s+F+.r..y. x+w+tF+F • w • r�r i. w r • a w> r � it+ir+� WorkSheet for TWSC Intersection ------------------------------------------- Step 1: RT from Minor Street WB Conflicting Flows: (vph) 312 Potential Capacity: (pcph) 962 Movement Capacity: (pcph) 962 Prob. of Queue -free State: 0.96 -------------------------------------------- Step 2: LT from Major Street SB -------------------------------------------- Conflicting Flows: (vph) 330 Potential Capacity: (pcph) 11.34 Movement rapacity: (pcph) 1194- Prob. of Queue -free State: 0.96 TH Saturation Flow Rate: (pcphpl) 1700 P.T Saturation Flow Pate: (pcphpl) Major LT Shared Lane Prob. of Queue -free State: 0.ee -------------------------------------------- Step 4: LT from Minor Street-------------WB ____________________________ Conflictina Flows: (vph) 1293 Potential Capacity: (pcph) 189 Major LT. Minor TH Impedance Factor: 0.68 Adjusted Impedance Factor: 0.88 Capacity Adjustment Factor due to Impedina Movements o.86 Movement Capacity: (pcph) 166 EB NB ED Center For Microcomputers In Transportation HCS: Unsignalized Intersection Release 2.1 Page 3 a )t it r+mow •a x�+s*r it+ir+��as* •a.�+►++r+ra x+�+a� •++aa �rw• ram.+w*+it it � x+a r k i Intersection Performance Summary F1owRate MoveCap SharedCap Avg.Total Delay i Movement v(pcph) Cm(pcph) Csh(pcph) Delay LOS By App ________ ______ ______ ______ ------------ ------ _______ WB L. is 166 24.3 D 6.5 WE, R w 962 3.5 A i SD L 52 1194 o._ A 0.1 Intersection Delay = 0.3 rr No 4M rA-W s. (ft air 4N3 Center For Microcomputers In Transportation HCS: Unsiqnalized Intersection Release --.1 Pape 1 xxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxx File Name ................ 9C15P.HC0 -Streets: (N-S) CPS (E-W) C:HARLIE LANE Major Street Direction.... NS Length of Time Analyzed... 60 (min) Analyst .................... DP.C: Date of Analysis.......... 7/20/95 Other Information......... LONG RANGE (2015) - PM PEAK HOUR Two-way Stop -controlled Intersection Northbound t Southbound Eastbound 1 Westbound L T P.: L T R; L T ____'____ P.: L T ____ ____ P. �___1 ____ ---- No. Lanes C 1<.: ;---- ____ ________ 0; 0:- 1 0' ____ 0 0 0 1 0 1 Stop/Yield I N: NI Volumes 1045 5� 10 315 i 10 20 PHF .95 .95 .95 .95 .95 .95 Grade 0 0 i 0 0 MC's (%) 0 0I 0 0 0 0 SU/RV's (%); 0 0: 0 0 0 O CV's (%) 0 01 Cl 0 0 0 PCE's 1.1 1.11 1.1 1.1 1.1 1.1 Adjustment Factors Vehicle Maneuver ----------- _______________ Left Turn Major Road Right Turn Minor Road Through Traffic Minor Road Left Turn Minor Road Critical Follow-up Gap (tg) ____________________________ Time (tf) 5.00 2.10 5.50 2.60 G.00 3.30 6.50 3.40 Center For Microcomputers In Transportation HCE: Unsiqnalized Intersection Release 2.1 Page xxxxxxxxxxxxxxxwxxxxxxwxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxx WorkSheet for TWEC Intersection ------- _---------------- ________________________________ Step 1: RT from Minor Street WD ED Conflicting Flows: (vph) 1046 Potential Capacity: (pcph) 408 Movement Capacity: (pcph) 408 Prob. of Queue -free State: 0.94 ________________ ------------------------ Step 2: LT from Major _--------------- Street S6 ND ________________________________________________________ Conflicting Flows: (vph) 1050 Potential Capacity: (pcph) 542 Movement Capacity: (pcph) 542 Prob. of Queue -free State: 0.98 TH Saturation Flow Rate: (pcphpl) 1700 R,T Saturation Flow Rate: (pcphpl) Major LT Shared Lane Prob. of Queue -free State: 0.97 -------------------------------------------------------- Step 4: LT from Minor Street WD_________-_ED _________________________________________ Conflicting Flows: (vph) 1372 Potential Capacity: (pcph) 170 Major LT, Minor TH Impedance Factor: 0.97 Adjusted Impedance Factor: 0.97 Capacity Adjustment Factor due to Impeding Movements 0.97 Movement Capacity: (pcph) 165 Center For Microcomputers In Transportation HCS: Unsiqnalized Intersection Release 2.1 Page xxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxx Intersection Performance Summary .. F1owRate MoveCap SharedCap Avq.Tctal Delay Movement v(pcph) Cm(pcph) Csh(pcph) Delay LOS By App ________ ______ ______ ______ ------------ ______ --------- WD L 12 165 22.5 D E.5 WD R 408 SD L 12 542 Intersection Delay = 5.4 D 6.8 H 0.2 U.2 Center For Microcomputers In Transportation HCS: Unsianalized Intersection Release 2.1 P'aae I File Name 9C15A.HCO Streets: (N-S) CP9 (E-W) CHARLIE LANE Major Street Direction.... NS Lenath of Time Analyzed... 60 (min) Analyst ................... DP,C Date of Analysis.......... 7/20/95 Other Information......... LONG RANGE (2015 - AM PEAK HOUR Two-way Stop -controlled Intersection Northbound SouthbwUnd Eastbound 1 WestbOUnd L T R. ; L T R; L T PI: L T R ___- ____ -___ ---- ,---- __-_ ---- No. Lanes 0 I< 0! 01 1 0; O O O; 1 0 1 Stop/Yield N! N: Volumes 325 5: 35 965 15 30 PHF .95 .95; .95 .95 .95 .95 Grade O i O 0 0 MCIs C%> O 0; 0 0 i 0 SU/RV's C%)1 0 0; O 0 0 O CV,s (%) 0 0; O 0 i 0 0 PCE's Z 1.1 1.1; 1.1 1.1 ; 1.1 1.1 Adjustment Factors Vehicle Critical Maneuver - Gap (tg) ---------------------------------------------- Left Turn Major Road 5.00 Riaht Turn Minor Road 5.50 Through Traffic Minor Road 6.00 Left Turn Minor Road 6.50 Follow-up Time (tf) 2.10___ 2.60 3.30 3.40 Center For Microcomputers In Transportation HCS: Unsianalized Intersection Release L.. Page L ++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++ WorkSheet for TWSC Intersection ------------------------------------------- Step 1: P.T from Minor Street W8 Conflictina Flows: (vph) 328 Potential Capacity: (pcph) 944 Movement Capacity: (pcph) 944 Prob. of Queue -free State: 0.'36 -------------------------------------------- Step 2: LT from Major Street SR ------------------------------ Conflicting Flows: ___________-. (vph) 330 Potential Capacity: (pcph) 1194 Movement Capacity: (pcph) 1194 Prob. of Queue -free State: 0.97 TH Saturation Flow Rate: (pcphpl) 1700 RT Saturation Flow Pate: (pcphpl) Major LT Shared Lane Prob. of Queue -free State: 0.90 ------------------------------------------- Step 4: LT from Minor Street W8 ------------------------------------------- Conflicting Flows: (vph) 1328 Potential Capacity: (pcph) 180 Major LT, Minor TH Impedance Factor: 0.90 Adjusted Impedance Factor: 0.90 Capacity Adjustment Factor due to Impeding Movements 0:90 Movement Capacity: (pcph) 162 E8 N8 E8 Center For Microcomputers In Transportation HCS: Unsianalized Intersection Release 2.1 Page 3 ++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++ i Intersection Performance Summary F1owRate MoveCap SharedCap Avq.Total Delay Movement v(pcph) Cm(pcph) Csh(pcph) Delay LOS 8y App ! _ ______ ______ ______ ------------ ------ __---___- WD L 18 162 25.0 D 6.5 W8 P 35 944 4.0 A SP L 41 1194 3.1 A 0.1 Intersection Delay = 0.2 I APPENDIX'E it 1 Center For Microcomputers In Transportation Center For Microcomputers In Transportation HCS: Unsignalized Intersection Release 2.1 F'age I HCS: Unsignalized Intersection Release 2.1 Rabe 2 •++rrw+tw+t•aic.i+wrw�t+r•�twrt��.*rt�ttwartwaratrrrrr�t•+.++�++f�wwrr+its+�+aarw ++++��++**a+*sitirit++wx-+itr+�+t�•*e+�+ram.mar+++a+rwrrrrw♦+t•+t+tr��e.rr File Name ................ 9AD97P.HCO Streets: (N-S) CR,9 (E-W) ACCESS DRIVE Major Street Direction.... NS WorkSheet for TWSC Intersection Length of Time Analyzed... GO (min) ________________________________________________________ Analyst ................... DP.0 Step 1: PT from Minor Street - WB EB Date of Analysis.......... 7/20/95 -------------------------------------------------------- Other Information.......... SHORT RANGE (1997) - PM PEAT: HOUR Conflicting Flows: (vph) 442 Potential Capacity: (pcph) 827 Two-way Stop -controlled Intersection - Movement Capacity: (pcph) 627 Prob. of Queue -free State: 0.97 ' Northbound : Southbound i Eastbound : Westbound -------------------------------------------------------- L T RI L T P.: L T F.': L T R Step :': LT from Major Street ________________________________________________________ SB NS ;____ ___--___---- ____ ---- ;---- ___- ---- ;---- No.. Lanes 0 1: 0: 0 1 OI 0 0 0: __-_ _-_- 1 0 1 Conflicting Flows: (vph) 450 Stop/Yield : N: N: Potential Capacity: (pcph) 1046 Volumes , 425 15 15 200 i 10 20 Movement Capacity: (p=ph) 1046 PHF .95 .95: .95 .95 .95 .95 Prob. of Queue -free State: 0.98 Grade 0 0 0 O TH Saturation Flow Rate: (pcphpl) 1700 MC'S (%) 0 0: 0 0 0 0 RT Saturation Flow Rate: (pcphpl) SU/RV•s (%)'• 0 O: O O 0 O Major LT Shared Lane Prob. CV's (%) 0 0: 0 0 i O 0 of Queue -free State: 0.98 PCE's : 1.1 1.1: 1.1 1.1 : : 1.1 1.1 ________________________________________________________ ________________________________________________________________________ Step 4: LT from Minor Street WB EB ________________________________________________________ Conflicting Flows: (vph) 658 Potential Capacity: (pcph) 440 Adjustment Factors Major LT, Minor TH Impedance Factor: 0.98 Vehicle Critical Follow-up Adjusted Impedance Factor: 0.98 Maneuver Gap (ta) Time (tf) Capacity Adjustment Factor __________________________________________________________________ due to Impeding Movements 0.98 Left Turn Major Road 5.00 2.10 Movement Capacity: (pcph) 431 Right Turn Minor Road 5. 50 2.GO ________________________________________________________ Through Traffic Minor Road 6.00 3.30 Left Turn Minor Road G.50 3.40 Center For Microcomputers In Transportation HCS: Unsignalized Intersection Release 2.1 Page 3 �tita�tariot*�•��ta�aEaitrsat+it+wt•*�t++*�+r+rr+tr.�arite�atwa�tic��t++�+ra<at+arat+ - Intersection Performance Summary F1owRate MoveCap Shared Crap Ava.Total Delay Movement v(pcph) Cm(pcph) Csh(pcph) ! ________ ______ ______ ______ Delay LOS ------------ ______ By App _______ WB L 12 431 8.6 B 6.5 WD P 23 827 4.5 A SD L 1B ln46 3.5 A 0.2 Intersection Delay = 0.4 cam, AW Center For Microcomputers In Transportation Center For Microcomputers In Transportation HCS: Unsignalized Intersection Release 2.1 F'a.ge 1 HCS: Unsignalized Intersection Release 2.1 Page 2 xxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxx xxxxxxxxxxwxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxs File Name ................ 9AD97A.HC0 . Streets: (N-S) CR9 (E-W) ACCESS DRIVE Major Street Direction.... NS WorkSheet for TWSC Intersection Lenath of Time Analyzed... 60 (min) ________________________________________________________ Analyst ................... DRC Step 1: RT from Minor Street WB EB Date of Analysis.......... 7/20/95 ________________________________________________________ Other Information......... SHORT RANGE (1997) - AM PEAT: HOUR: Conflicting Flows: (vph) 202 _ Potential Capacity: (pcph) 1094 Two-way Stop -controlled Intersection Movement Capacity: (pcph) 1094 Prob. of Queue -free State: 0.97 Northbound ; Southbound ; Eastbound ; Westbound -------------------------------------------------------- L T R; L T RI L T R: ;---- L T ____ ____ F.• Step 2: LT from Major Street ________________________________________________________ SB NB ;____ ___- ---- ;---- -___ ---- ;---- ____ ---- No. Lanes 0 1< 0; .0:? 1 0: 0 0 0: 1 O 1 Conflicting Flows: (vph) 220 Stop/Yield ; N; N; Potential Capacity: (pcph) 1347 Volumes i 185 45 555 i 15 30 Movement Capacity: (pcph) 1347 PHF .95 .95; .95 .95 1 .95 .95 Prob. of Queue -free State: 0.9E Grade 0, 0 O TH Saturation Flow Rate: (pr_phpl) 1700 MC's (%) 0 0: 0 0 0 U RT Saturation Flow Rate: (pcphpl) SU/RV's (%); 0 0: 0 0 0 Major LT Shared Lane Prob. CV's t%) 0 0; 0 O i i 0 0 of Queue -free State: 0.94 PCE's 1.1 1.1; 1.1 1.1 1.1 1.1 ________________________________________________________ ________________________________________________________________________ Step 4: LT from Minor Street ________________________________________________________ WB ES Conflicting Flows: (vph) B02 Potential Capacity: (pcph) 363 Adjustment Factors Major LT, Minor TH Impedance Factor: 0.94 Vehicle Critical Follow-up Adjusted Impedance Factor: 0.94 Maneuver Gap (tg) Time (tf) Capacity Adjustment Factor __________________________________________________________________ due to Impeding Movements 0.94 Left Turn Major Road 5.On 2.10 Movement Capacity: (pcph) 340 P,ioht Turn Minor Road 5.50 2.60 ________________________________________________________ Through Traffic Minor Road F.00 3.30 Left Turn Minor Road 6.50 3.40 Center For Microcomputers In Transportation HCS: Unsignalized Intersection Release 2.1 Page 3 xxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxx Intersection Performance Summary FlowRate MoveCap SharedC.ap Avg.Total Delay Movement v(pcph) Cm(pcph) Csh(pcph) ________ ______ ______ ______ Delay LOS ------------ ______ By App WB L is 340 11.2 C ------- 6.5 WB F.' ,,., 1094 3.4 A SD L .,_ 1347 2.e A 0.2 Intersection Delay = 0.5 _ �r r• �. rr .r► .�► ,.. ate, .� �. 4M kn Center For Microcomputers In Transportation HCS: Unsianalized Intersection Release 2.1 Page 1 File Name ................ 9C97P.HC0 Streets: (N-S) CP5 (E-W) CHARLIE LANE Major Street Direction.... NS Length of Time Analyzed... 60 (min) Analyst ................... DPC Date of Analysis.......... 7/20/95 Other Information......... SHORT RANGE (1997) - PM PEAK HOUR Two-way Stop -controlled Intersection Northbound Southbound Eastbound 1 Westbound L T P! L T P.L T R� L T R ____ --__ ___- _-_----- ____---- ;---- ____ ---- No. Lanes 0 1: 01 0:> 1 01 0 0 01 1 O 1 Stop/Yield N: N: Volumes 450 51 10 205 1 10 20 PHF .95 .95: .95 .95 i .95 .95 Grade 0 0 6 0 MCI$ (%) 0 0: 0 0 0 0 SU/RV•s (%)I 0 0: O 0 i 0 0 CV1s (%) 0 01 0 0 0 0 PCE's 1.1 1.1: 1.1 1.1 1.1 1.1 Adjustment Factors Vehicle Critical Maneuver _____________Gap (tg) ________________________ _____ Left Turn Major Road 5.00 Riaht Turn Minor Road 5.50 Through Traffic MinorRoad 6.00 Left Turn Minor Road 6.50 Follow-up Time (tf) -.10 2.60 3.30 3.40 Center For Microcomputers In Transportation HCS: Unsianalized Intersection Release 3.1 Pape ^_ WorkSheet for TWSC: Intersection Step 1: PT from Minor Street Conflicting Flows: (vph) Potential Capacity: (pcph) Movement Capacity: (pcph) Prob. of Queue -free State: --------------------------------- Step 2: LT from Major Street _________________________________ C:cnflictino Flows: (vph) Potential Capacity: (pcph) Movement Capacity: (pcph) Prob. of Queue -free State: TH Saturation Flow Rate: (pcphpl) RT Saturation Flow Rate: (pcphpl) Major LT Shared Lane Prob. of Queue -free State: Step 4: LT from Minor Street Conflicting Flows: (vph) Potential Capacity: (pcph) Major LT, Minor TH Impedance Factor: Adjusted Impedance Factor: Capacity Adjustment Factor due to Impeding Movements Movement Capacity: (pcph) WB EB _________________ 452 817 817 0.97 SE NB 455 1041 1041 0.99 1700 0.99 _________________ WBEB _____------ __ 669 435 0.99 0.99 0.99 429 Center For Microcomputers In Transportation HCS: Unsianalized Intersection Release 2.1 Page 3 Intersection Performance Summary FlowRate MoveCap SharedCap Avg.Total Delay Movement v(pcph) Cm(pcph) Csh(pcph) Delay LOS By App ________ ______ ______ ______ ____________ ------ _______, WB L 12 429 e.6 B 6.5 WB P 23 817 -.. _ A SB L 12 1041 3.5 A 0.2 Intersection Delay = 0.3 Center For Microcomputers In Transportation HCS: Unsianalized Intersection Release C:.1 Page 1 xxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxx File Name ................ 9C97A. HCO Streets: (N-S) CR9 (E-W) CHARLIE LANE Major Street Direction.... NS Length of Time Analyzed... 60 (min) Analyst ................... DRC Date of Analysis.......... 7/20/95 Other Information......... SHORT RANGE (1997) - AM PEAK: HOUR Two-way Stop -controlled Intersection Northbound Southbound Eastbound Westbound L T R: L T R; ____ ---- L T R:; L ____ ____,____ ____ T P ___- �___- ---- ____ __------ ,---- No. Lanes O 1< 0: 0:> 1 0: U 0 0; 1 0 1 Stop/Yield ; N: M Volumes 210 5: 35 585 15 30 PHF .95 .95: .95 .95 .95 .95 Grade 0 i 0 i� 0 MC's (%7 0 0: 0 0 0 O SU/RV's (%?I 0 01 0 O U 0 CV•s (%) 0 0; 0 0 O O PCE'S i 1.1 1.1; 1.1 1.1 ; 1.1 1.1 Adjustment Factors Vehicle Critical Follow-up Maneuver ___________________________________ Gap (tq) Time (tf) ------------------------------- Left Turn Major Road 5.00 2.10 Riaht Turn Minor Road 5.50 _ � 2.60 Throuah Traffic Minor Road 6.00 S.30 Left Turn Minor Road 6.50 3.40 Center For Microcomputers In Transportation HCS: Unsianalized Intersection Release 2.1 Page xxxtxxxxxxx+txxxsxxxxxxx�t++xxxxxxxxxxxxxxxxx+xx+xxxxxxxxx+xatxxxx+ Wcr kSheet for TWSC Intersection ------------------------------------------- Step 1: RT from Minor Street WH C:onflictina Flows: (vph) 212 Potential Capacity: (pcph) 1081 Movement Capacity: (pcph) 1081 Prop. of Queue -free State: 0.97 ------------------------------------------- Step 2: LT from Major Street SB ------------------------------------------- Conflicting Flows: (vph) 215 Potential Capacity: (pcph) 1354 Movement Capacity: (pcph) 1354 Prop. of Queue -free State: 0.97 TH Saturation Flow Rate: (pcphpl) 1700 P.T Saturation Flow Rate: (pcphpl) Major LT Shared Lane Prob. of Queue -free State: 0.95 ------------------------------------------- Step 4: LT from Minor Street WP ------------------------------------------- Conflicting Flows: (vph) 832 Potential Capacity: (pcph) 349 Major LT, Minor TH Impedance Factor: 0.95 Adjusted Impedance Factor: 0.95 Capacity Adjustment Factor due to Impeding Movements 0.95 Movement Capacity: (pcph) 331 EH N8 EH Center For Microcomputers In Transportation HCS: Unsianalized Intersection -Release 2.1 Page 3 xxxxxxxxxxxxxxxxxxx:xxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxx Intersection Performance Summary F1owR:ate MoveC:ap Avp.Total Delay Movement .SharedCap v(pcph) Cm(pcph) Csh(pcph) Delay ____________ LOS ______ By App .-_-____ ________ W8 L ______ ______ ______ 18 331 11.5 C 6.5 WH R 25 1081 3.4 A SD L 41 1354 2.7 A 0.2 Intersection Delay = 0.4 ., APPENDIX D APPENDIX C Center For Microcomputers In Transportation HCS: Unsipnalized Intersection Pel ease 2.1 Paae 1 xxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxx File Name ................ 9C95P.HCO Streets: (N-S) CP.9 (E-W) CHARLIE LANE Major Street Direction.... NS Length of Time Analyzed... 60 (min) Analyst ................... DPC Date of Analysis.......... 7/20/95 Other Information......... RECENT/ESTIMATED TRAFFIC CONDITIONS - PM PEAK HO UR Two-way Stop -controlled Intersection Northbound Southbound Eastbound Westbound L T RI L T P' L T RI L T R _-__ ____ _-__ ____ ___- No. Lanes O 1< 01 01. 1 OI O O 01 1 0 1 Stop/Yield NI W Volumes 269 51 5 67 5 PHF .95 .95: .95 .95 i .95 .95 Grade O i O 0 0 MC S C%) 0 01 0 0 0 0 SU/P.V's (%): 0 07 0 0 O 0 CV's (%) 0 01 O 0 0 0 PCE's 1.1 1.11 1.1 1.1 1 1.1 1.1 Adjustment Factors Vehicle Critical Follow-up Maneuver Gap (ta) Time (tf) __________________________________________________________________ Left Turn Major Road 5.00 2.10 P.iaht Turn Minor Road 5.50 2.60 Through Traffic Minor Road 6.00 3.30 Left Turn Minor Road 6.50 3.40 Center For Microcomputers In Transportation HCS: Unsipnalized Intersection Release 2.1 Page 2 xxxxxxxxxxxxxxxxxxxxxxxx<xxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxx WorkSheet for TWSC Intersection ------- _--------------- ____________________ Step 1: PT from Minor Street WB Conflicting Flows: (vph) 272 Potential Capacity: (pcph) 1008 Movement Capacity: (pcph) 1008 Prob. of Queue -free State: 0.99 ------------------------------------------- .Step 2: LT from Major Street SE ------------------------------------------- Conflicting Flows: (vph) 274 Potential Capacity: (pcph) 1269 Movement Capacity: (pcph) 1269 Prob. of Queue -free State: 1.00 TH Saturation Flow Rate:'(pcphpl) 1700 PT Saturation Flow Rate: (pcphpl) Major LT Shared Lane Prob. of Queue -free State: 1.00 --------------------------------------- Step 4: LT from ------------- Street we -Minor _ _______________ Conflicting Flows: (vph) 344 Potential Capacity: (pcph) 669 Major LT, Minor TH Impedance Factor: 1.00 Adjusted Impedance Factor: 1.00 Capacity Adjustment Factor due to Impeding Movements 1.00 Movement Capacity: (pcph) 666 EB NB ER Center For Microcomputers In Transportation HCS: Unsipnalized Intersection Release 2.1 Page 3 xxxxxxxxxrxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxx Intersection Performance Summary F1owRate MoveCap SharedCap Ava.Total Delay Movement ________ v(pcph) ______ Cm(pcph) Csh(pcph) ______ ______ Delay ------------ LOS ______ By App ------- We L 6 666 5.5 B 4.6 We P 6 1008 3.6 A SB L 6 1269 2.9 A 0.2 Intersection Delay = 0.- aw r a� a� it � air r •r � r +.r r r rs •� •� s r UR Center For Microcomputers In Transportation HCS: Unsignalized Intersection Release 2.1 Page 1 ****X**Xk*k****k****XXXkk****kXXkk*k*******XXkk***X*kkk*k**XXkkk File Name ................ 9C95A.HC0 Streets: (N-S) CR9 (E-W) CHARLIE LANE Major Street Direction.... NS Length of Time Analyzed... 60 (min) Analyst ................... DRC Date of Analysis.......... 7/20/95 Other Information......... RECENT/ESTIMATED TRAFFIC CONDITIONS - AM PEAK HO Two-way Stop -controlled Intersection c I Northbound I Southbound I Eastbound I Westbound I L T RI L T RI L T RI L T R I---- ---- ---- I ---- ---- ---- I ---- ---- ---- I - ---- ---- No. Lanes I 0 1< 01 0> 1 01 0 0 01 1 0 1 Stop/Yield I NI NI I Volumes 1 78 51 5 322 1 1 5 5 PHF 1 .95 .951 .95 .95 1 1 .95 .95 Grade 1 0 1 0 1 0 1 0 MC's (9) 1 0 01 0 0 1 1 0 0 SU/RV's MI 0 01 0 0 1 1 0 0 CV's (8) I 0 01 0 0 1 1 0 0 PCE's - I 1.1 1.11 1.1 1.1 1 1 1.1 1.1 ------------------------------------------------------------------------ Adjustment Factors Vehicle Critical Follow-up Maneuver Gap (tg) Time (tf) ------------------------------------------------------------------ Left Turn Major Road 5.00 2.10 Right Turn Minor Road 5.50 2.60 Through Traffic Minor Road 6.00 3.30 Left Turn Minor Road 6.50 3.40 Center For Microcomputers In Transportation HCS: Unsignalized Intersection Release --.1 Page 2 a iF iF iF iFit#iFiF iF+FiF iF iFiiF iF iFiF#!iF#4itiF#tMiFiiF if iF M iF*1F iF iFiFY#F##iF#ifiFMiFIiM FiF #1F iFif iF#dFit iF Worl:Sheet for TWSC: Intersection ------------------------------------------- Step 1: PT from Minor Street W8 Conflictinq Flows: (vph) 80 Potential Capacity: (pcph) 1261 Movement Capacity: (pcph) 1261 Prob. of Queue -free State: 1.00 ------------------------------------------- Step 2: LT from Major Street SH ------------------------------------------- Conflicting Flows: (vph) 83 Potential Capacity: (pcph) 1565 Movement Capacity: (pcph) 1565 Prob. of Queue -free State: 1.00 TH Saturation Flow Rate: (pcphpl) 1700 P.T Saturation Flow Rate: (pcphpl) Major LT Shared Lane Prob. of Queue -free State: 1.00 Step 4: LT from Minor Street WS Conflicting Flows: (vph) 408 Potential Capacity: (pcph) 615 Major LT. Minor TH Impedance Factor: 1.00 Adjusted Impedance Factor: 1.00 Capacity Adjustment Factor due to Impeding Movements 1.00 Movement Capacity: (pcph) 612 E8 N8 ES Center For Microcomputers In Transportation HCS: Unsionalized Intersection Release --.1 Page 3 M YX �•+r+��t+a wr• tar+r•+++a�sr+aFrr ic. a+.iFiiFX++w aeitr+•+�ait�s air+«r � r+r .Intersection Performance Summary F1owRate MoveCap SharedC:ap Avo.Total Delay Movement v(pcph) Cm(pcph) Csh(pcph) Delay LOS by App -------- ------ ------ ------------------ ------------- WD L 6 612 5.9 S 4.4 W8 P 6 1261 2.9 A SP L 6 1565 2.3 A 0.0 Intersection Delay = 0.1 APPENDIX B I I fi MATTHEW J. DEUCH, P.E. 3413 SWAN AVENUE LOVEIMD, CO 80538 TABULAR SUMMARY OF VEHICLE COUNTS Observer Dm 3 30 4¢ Day (e)fb0&' -t4yCIty F012'f' (2o LL- Liu S R a Right turn Q PA c- K i4 A S a Straight INTERSF_CT10N OF a +� AND ��_ L a Lett tum BEGINS CTIME tram NORTH from SOUTH North South from EAST AL Ott West TOT, ALLY from WEST R S L Tatal R S L Total R S L Toil R S L Total 730 t ¢3 s9JZ.61 Is 4-0 99 s o s 3 ro¢ -744s I iG 7Z $ $ 541 zl ss 143 13 4 7 &rob I FS 440 It+ 34 1 S' + 9 13 3 13 1 0 3 11 3 1 3(0 �615I IM -791 91 37f 1 1 5'Z 143 1 Z I U I Z j Z 14S I I 73o$3U 2.260 3Z 7,1131 61 111 t. S 1 8 151 4- 1 17 1 1 1 17 S 3 S' I I 1 I 1 I 1 I I l I i O 15 L 1 ? 1 Ito I 17 I 34 35 13 4(0 4(0 �O 4 13 Z 17 Zo 3"5 4.4 z3 (fl? 6-7 1100 a-vo i !o 1-7 7 ZI z4S 4s 4? 12 I s9 Isg 10 s/ tr l 1 3 2-0 S Z4- Z-1 6& 1 Z3 8 I i 1 ]-Z(,.( 30 1 I 11p G 7 1 S 7 9 9 4- 16 1 19 71 z (9 1 ¢ z 2 �J I .'r 11 APPENDIX". A it C III .Operations Analysis Capacity analyses were performed on key intersections accessing the project site. The analyses correspond with the traffic forecasts shown in Figures 5 and 6. Using the traffic volumes shown in Figure 5, the key intersections operate in the 1.997 short range condition as indicated in Table 3. Calculation forms for these analyses are provided in Appendix D. All intersections will operate acceptably. Using the traffic volumes shown in Figure 6, the key intersections operate in the 2015 long range condition with the proposed developments as indicated in Table 4. Calculation forms are provided in Appendix E. All intersections operate acceptably. IV. CONCLUSIONS This study assessed the impacts of the Christ Fellowship Church development on the short range (1997) and long range (2015) street system in the vicinity of the proposed project. As a result of this analysis, the following is concluded: - The development of the Christ Fellowship Church is feasible from a traffic engineering standpoint. When the project is completed, approximately 1,040 trip ends will be generated daily. In the short range future (1997), operation will be acceptable at all key intersections. - In the long range future (2015), all intersections will operate acceptably in the peak hours. - With the forecasted long rang traffic volumes, CR9 should have a four lane cross section with a center turn lane for left turns. The 210+ feet between Charlie Lane and the site access from CR9 will allow storage of four vehicles at one time. Based upon the forecasted number of left -turns and the level of service A/B operation in the peak hours, this lane is not expected to be full at any time. M Table 3 Short Range (1997) Peak Hour Operation Intersection CR9/Charlie (stop sign) WB LT WB RT SB LT CR9/Access Drive (stop sign) WB LT WB RT SB LT Level of Service AM PM C A A C A A Table 4 Long Range (2015) Peak flour Operation B A A B A A Level of Service Intersection AM PM CR9/Charlie (stop sign) WB LT D D WB RT A B SB LT A B CR9/Access Drive (stop sign) WB LT D D WB RT A B SB LT A B Ln t 1nr) 1 N �- 30/20 15/10 CHARLIE LANE �r r,/T/T/T/TI//777 //' ~M Z U CD nL0 Site rq C" 30/20 --15/10 V /A N r- �Lll1l1/1/1/1/1/1/�1111� AM / PM Rounded to the Nearest 5 Vehicles. LONG RANGE (2015) PEAK HOUR TRAFFIC Figure 6 CD 0 30/20 l_ 15/10 N LANE. r/T/T/T/T/Tl»TT/T/�/� N I/ fj Site 30/20 r-15/10 /A fI �j �� r1LlLll1/1/1/1/1/1/1111� .M 00 AM/PM Rounded to the Nearest 5 Vehicles. SHORT RANGE (1997) PEAK HOUR TRAFFIC Figure 5 0 a Q z O V CHARLIE LANE •� w A& N NO SCALE TRIP DISTRIBUTION Figure 4 n CHARLIE LANE I Proposed Church Facility A& N NO SCALE 00000000 SITE PLAN Figure 3 III. PROPOSED DEVELOPlIE14T The Christ Fellowship Church is a proposed church with a daycare and school. It is anticipated that the daycare could serve up to 90 students and the school up to 120 students. Figure 3 shows a general site plan of the project. Trip Generation Trip generation is important in considering the impact of a development such as this upon the existing and proposed street system. A compilation of trip generation information, prepared by the Institute of Transportation Engineers (Trip Generation, 5th Edition) was used to forecast site generated trips. Table 2 shows the trip generation on a daily and peak hour basis. Trip Distribution The trip distribution was determined based upon the location of the project within the City of Fort Collins. The trip distribution is shown in Figure 4. Background Traffic Background traffic is defined as the traffic that is and/or will be on the area streets that is not related to the proposed development. Future analysis years were 1997 (short range) and 2015 (long range). This is a developing area of Fort Collins and, as such, the traffic increases are largely dependent upon land development. Traffic on CR9 was increased to reflect the expected development both north and south of Harmony Road. The traffic projections from the "North Front Range Regional Transportation Plan," October 1994, and previously completed traffic studies in the area were used to obtain the long range background traffic forecasts. Trip Assignment Trip assignment is how the generated and distributed trips are expected to be loaded on the street system. The assigned trips are the resultant of the trip distribution process. Figure 5 illustrates the short range peak hour site generated traffic as I described earlier, plus background traffic. The background traffic also includes incremental development of an industrial park facility and the Strachan/Shields PUD. Figure 6 reflects the long ' range total peak hour traffic with full development of all the land on the west side of CR9 as residential and an industrial park (former NCR site). ' 3 11 Table 1 Existing Peak Hour Operation Intersection CR9/Charlie (stop sign) WB LT/RT S B L'r Land Use Church School (120 students) Daycare (90 children) Total Level of Service AM PM B A Table 2 Trip Generation Daily A.M. Peak Trips Trips Trips in out 60 4 1 560 71 41 420 40 34 1040 115 76 Itl P.M. Peak Trips Trips in out 3 2 5 11 34 41 42 54 9 N AM / PM RECENT ESTIMATED TRAFFIC COUNTS Figure 2 ' R N c*xnN , `1•A E - nw e.•la .n7 bcpa•�'� 1 � _\�'��1 \ 1--• +—Lem w �• / - .I 1 �� '\_..e S \, F r \\ - ort Collin..s l^••..a 1 .mow � y ,.., >t �;"° `xe.:;'n '` �° i L.. ;• i�-Y1:f HO,RSETOOTH ROAD` •k I ` 1 \ � ..vN �r a I e' 1 rt `✓i p�I •,, 1=�•••�. CHRIST FELLOWSHIP CHURCH ,y -- HARMONY ROADcm `.� 1 ------! � z u n NO SCALE I SITE LOCATION 1 Figure 1 I I. INTRODUCTION ' This traffic impact study addresses the capacity, geometric, and control requirements associated with the proposed. Christ Fellowship Church, located at the CR9/Charlie Lane intersection in Fort Collins, Colorado. This study also considers various development proposals and land that will likely develop in the next 10-20 years. During the course of the analysis, contacts were made with the project architect, Fort Collins Planning Department, and the Fort Collins Transportation Division. This study generally conforms to the format set forth in typical traffic impact study guidelines. The study involved the following steps: - Collect physical, traffic, and development data; ' - Perform trip generation, trip distribution, and trip assignment; - Determine peak hour traffic volumes and daily traffic volumes; - Conduct capacity and operational level of service analyses at the key intersections; This report is prepared for the following purposes: - Evaluate the existing conditions at the key intersections; - Estimate the trip generation by the proposed/assumed ' developments; - Determine the trip distribution of site generated traffic; - Evaluate operation at the key intersections; Determine the geometries at key intersections; - Determine the impacts of site generated traffic on key intersections. ' Information used in this report was obtained from the City of Fort Collins, the planning and engineering consultants, the ' developers, .research sources (ITE, TRB, etc.), and field reconnaissance. ' II. EXISTING CONDITIONS ' The location of the proposed Christ Fellowship Church is shown in Figure 1. It is important that a thorough understanding of the existing conditions be presented. I' Land Use ' Land uses in the area are primarily agricultural and residential. The English Ranch residential development is directly to the west of .the site, and the proposed Stracha.n/Shields FUD [] 1 1 1 1 CHRIST FELLOWSHIP CHURCH SITE ACCESS STUDY ' FORT COLLINS, COLORADO JULY 1995 Prepared for: Christ Fellowship Church ' Fort Collins, CO Prepared by: ' MATTHEW J. DELICH, P.E. 3413 Banyan Avenue Loveland, CO 80538 Phone: 970-669-2061. FAX: 970-669-5034 1 I 1