HomeMy WebLinkAboutCHRIST FELLOWSHIP CHURCH - FINAL SUBDIVISION - 29-94B - REPORTS - RECOMMENDATION/REPORT W/ATTACHMENTSTable 3
Short Range (1997) Peak Hour Operation
Level of Service
Intersection AM PM
CR9/Charlie (stop sign)
WB LT C B
WB RT A A
SB LT A A
CR9/Access Drive (stop sign)
WB LT C B
WB RT A A
SB LT A A
Table 4
Long Range (2015) Peak flour Operation
Level of Service
Intersection AM PM
CR9/Charlie (stop sign)
WB LT D D
WB RT A B
SB LT A B
CR9/Access Drive (stop sign)
WB LT D D
WB RT A B
SB LT A B
I� Operations Analysis
Capacity analyses were performed on key intersections
accessing the project site. The analyses correspond with the
traffic forecasts shown in Figures 5 and 6.
Using the traffic volumes shown in Figure 5, the key
intersections operate in the 1997 short range condition as
indicated in Table 3. Calculation forms for these analyses are
provided in Appendix D. All intersections will operate acceptably.
Using the traffic volumes shown in Figure 6, the key
intersections operate in the 2015 long range condition with the
proposed developments as indicated in Table 4. Calculation forms
are provided in Appendix E. All intersections operate acceptably.
IV. CONCLUSIONS
I'
This study assessed the impacts of the Christ Fellowship
Church development on the short range (1997) and long range (2015)
street system in the vicinity of the proposed project. As a result
of this analysis, the following is concluded:
The development of the Christ Fellowship Church is feasible
from a traffic engineering standpoint. When the project is
completed, approximately 1,040 trip ends will be generated daily.
- In the short range future (1997), operation will be
acceptable at all key intersections.
- In the long range future (2015), all intersections will
operate acceptably in the peak hours.
- With the forecasted long rang traffic volumes, CR9 should
have a four. lane cross section with a center turn lane for left
turns. The 210+ feet between Charlie Lane and the site access from
CR9 will allow storage of four vehicles at one time. Based upon
the forecasted number of left -turns and the level of service A/B
operation in the peak hours, this lane is not expected to be full
at any time.
4
-3
0
n
0
I
0
O
rnLO '
I
�-- 30/20
15/10 CHARLIE
LO
r/T/T/T/T/TliIT�T/T/�`'
LO
Site
30/20
AM / PM
Rounded to the Nearest
5 Vehicles.
N
LONG RANGE (2015) PEAK HOUR TRAFFIC Figure 6
o .
L�
'ter' LO — 30/20
1 s/1 o CHARLIE
1T/lTlTT-T/T/��j'
N 1 l
z (/
U /
Site
� 30/20
l- 15/10
�Lll1l1/1/1/1/1/1/11L1�
AM / PM
Rounded to the Nearest
5 Vehicles.
SHORT RANGE (1997) PEAK HOUR TRAFFIC Figure 5
0
a
O
m
0
0
CHARLIE LANE
Site
A&
N
NO SCALE
TRIP DISTRIBUTION .Figure 4
A&
N
NO SCALE
I � ,
I
CHARLIE LANE
..��..-m m m m ...GMEMMEMMEMMOMMO
I
G
IQ
I¢ Proposed C hurch Facility
I} I —
I0
a -
L w I
SITE PLAN Figure 3
III. PROPOSED DEVELOPMENT
The Christ Fellowship Church is a proposed church with a
i� daycare and school. It is anticipated that the daycare could serve
up to 90 students and the school up to 120 students. Figure 3
shows a general site plan of the project.
Trip Generation
Trip generation is important in considering the impact of a
development such as this upon the existing and proposed street
system. A compilation of trip generation information, prepared by
the Institute of Transportation Engineers (Trip Generation, 5th
Edition) was used to forecast site generated trips. Table 2 shows
the trip generation on a daily and peak hour basis.
Trip Distribution
The trip distribution was determined based upon the location
of the project within the City of Fort Collins. The trip
distribution is shown in Figure 4.
Background Traffic
Background traffic is defined as the traffic that is and/or
will be on the area streets that is not related to the proposed
development. Future analysis years were 1997 (short range) and
2015 (long range). This is a developing area of Fort Collins and,
as such, the traffic increases are largely dependent upon land
development. Traffic on CR9 was increased to reflect the expected
development both north and south of Harmony Road. The traffic
projections from the "North Front Range Regional Transportation
Plan," October 1994, and previously completed traffic studies in
the area were used to obtain the long range background traffic
forecasts.
Trip Assignment
Trip assignment is how the generated and distributed trips are
expected to be loaded on the street system. The assigned trips are
the resultant of the trip distribution process. Figure 5
illustrates the short range peak hour site generated traffic as
described earlier, plus background traffic. The background traffic
also includes incremental development of an industrial park
facility and the Strachan/Shields PUD. Figure 6 reflects the long
range total peak hour traffic with full development of all the land
on the west side of CR9 as residential and an industrial park
(former NCR site).
K,
Table 1
Existing Peak Hour Operation
Intersection
CR9/Charlie (stop sign)
WB LT/RT
SB LT
Land Use
Church
School (120 students)
Daycare (90 children)
Total
Level of Service
AM PM
A
Table 2
Trip Generation
Daily
A.M.
Peak
Trips
Trips
Trips
in
out
60
4
1
560
71
41
420
40
34
1040
115
76
ftl
P.M. Peak
Trips Trips
in out
3 2
5 11
34 41
42 54
N
AM / PM
RECENT ESTIMATED TRAFFIC COUNTS Figure 2
residential development will be located to the south. To the north
and east of the site are large lot residential uses. The Fort
Collins Hewlett-Packard facility is south of the Strachan/Shields
PUD.
Land in the area is essentially flat. The center. of Fort
Collins lies to the northwest of the project site.
Roads
The primary streets near the proposed project are CR9 and
Charlie Lane. CR9 is on the west side of the site. It is a north -
south street designated as an arterial north and south of Harmony
Road. Adjacent to the site, it has a two lane rural cross section.
CR9 has recently been improved to provide bike lanes on both the
east and west sides. There is a signal at the intersection of
Harmony/CR9.
Charlie Lane is a two lane gravel road which borders the
northern side of the site. It provides access to approximately 6
single family residences. To the north of Charlie Lane,
approximately 350 feet, is Michelle Lane. Michelle Lane currently
is a T-intersection to the east of CR9. The English Ranch
development will connect to CR9 across from Michelle Lane.
Existing Traffic
Peak hour traffic flow at the CR9/Charlie Lane intersection
is shown in Figure. 2. The count volumes on CR9 are based upon
traffic counts performed in 1994 at the intersection of CR9 and the
entrance to HP. Raw traffic count data is provided in Appendix A.
The 1994 data was used since CR9 has been tinder construction and
is, therefore, restricted to local traffic only in 1995. The
traffic depicted on Figure 2 for Charlie Lane was estimated and
rounded up to the nearest 5 vehicles, based upon the existing
number of residences.
Existing Operation
' Table 1 shows the operation at the CR9/Charlie intersection
during the peak hours. Calculation forms are provided in Appendix
B. Appendix C describes level of service for unsignalized
intersections from the 1994 _Highway _ Capacity Manual. This
intersection is currently operating at an acceptable level of
service. As defined by the City of Fort Collins, a level of
service D or better is acceptable.
14 2
NO SCALE
t
SITE LOCATION Figure 1
I. INTRODUCTION
This traffic impact study addresses the capacity, geometric,
and control requirements associated with the proposed Christ
Fellowship Church, located at the CR9/Charlie Lane intersection in
Fort Collins, Colorado. This study also considers various
development proposals and land that will likely develop in the next
10-20 years.
During the course of the analysis, contacts were made with the
project architect, Fort Collins Planning Department, and the Fort
Collins Transportation Division. This study generally conforms to
the format set forth in typical traffic impact study guidelines.
The study involved the following steps:
- Collect physical, traffic, and development data;
- Perform trip generation, trip distribution, and trip
assignment;
- Determine peak hour traffic volumes and daily traffic volumes;
- Conduct capacity and operational level of service analyses at
the key intersections;
This report is prepared for the following purposes:
Evaluate the existing conditions at the key intersections;
- Estimate the trip generation by the proposed/assumed
- developments;
1� Determine the trip distribution of site generated traffic;
- Evaluate operation at the key intersections;
Determine the geometries at key intersections;
Determine the impacts .of site generated traffic on key
intersections.
Information used in this report was obtained from the City of
Fort Collins, the planning and engineering consultants, the
developers, .research sources (ITE, TRB, etc.), and field
reconnaissance.
II. EXISTING CONDITIONS
The location of the proposed Christ Fellowship Church is shown
in Figure 1. It is important that a thorough understanding of the
existing conditions be presented.
Land Use
Land uses in the area are primarily agricultural and
residential. The English Ranch residential development is directly
to the west of the site, and the proposed Stracha.n/Shields FUD
1
'I
CHRIST FELLOWSHIP CHURCH
SITE ACCESS STUDY
FORT COLLINS, COLORADO
JULY 1995
Prepared for:
Christ Fellowship Church
Fort Collins, CO
Prepared by:
MATTHEW J. DELICH, P.E.
3413 Banyan Avenue
Loveland, CO 80538
Phone: 970-669-2063.
FAX: 970-669-5034
T
v0
f
OVAN11
rip
HORSETOOTH AD
jT:jjLRLP
a
0
cc
I-
z
D
O
rip
V
City Limits
Dul
IL
VICINITY MAP
07/27/95
29-94B CHRIST FELLOWSHIP CHURCH
Final Subdivision
11mmmil
MINNI
a
0
Christ Fellowship Church, Final Subdivision, #29-94B
November 20, 1995 P & Z Meeting
Page 4
(January 22, 1996) of the Planning and Zoning Board following the meeting at
which this planned unit development final plan was conditionally approved; or, if
not so executed, that the developer, at said subsequent monthly meeting, apply to
the Board for an extension of time. The Board shall not grant any such extension of
time unless it shall first find that there exists with respect to said planned unit
development final plan certain specific unique and extraordinary circumstances
which require the granting of the extension in order to prevent exceptional and
unique hardship upon the owner or developer of such property and provided that
such extension can be granted without substantial detriment to the public good.
If the staff and the developer disagree over the provisions to be included in the
development agreement, the developer may present such dispute to the Board for
resolution if such presentation is made at the next succeeding or second succeeding
monthly meeting of the Board. The Board may table any such decision, until both
the staff and the developer have had reasonable time to present sufficient
information to the Board to enable it to make its decision. (If the Board elects to
table the decision, it shall also extend the term of this condition until the date such
decision is made).
If this condition is not met within the time established herein (or as extended, as
applicable), then the final approval of this planned unit development shall become
null and void and of no effect. The date of final approval for this planned unit
development shall be deemed to be the date that the condition is met, for purposes of
determining the vesting of rights. For purposes of calculating the running of time
for the filing of an appeal pursuant to Chapter 2, Article II, Division 3, of the City
Code, the "final decision" of the Board shall be deemed to have been made at the
time of dispute is presented to the Board for resolution regarding provisions to be
included in the development agreement, the running of time for the filing of an
appeal of such "final decision" shall be counted from the date of the Board's
decision resolving such dispute.
Christ Fellowship Church, Final Subdivision, #29-9413
November 20, 1995 P & Z Meeting
Page 3
3. Desien:
The lots are designed so that the church is located along County Road #9 (Lot One) which is
classified as an arterial street. Lot Two gains access from Charlie Lane, classified as a rural
street in the City and County. The size of Lot Two, 3.35 acres, is compatible with the
surrounding County lots (2.29 acres).
•.r. •,
Primary access will be gained from Charlie Lane. Secondary access will be gained from a new
curb cut onto County Road 49. The purpose of this secondary curb cut is help distribute traffic
from a full parking lot after a large service or event.
A traffic impact analysis was prepared for this Subdivision. The study indicates that all
intersections will operate acceptable (Level of Service D or better) in both the short and long
range. The Subdivision will be feasible from a traffic engineering standpoint.
5. Findings of Fact/Conclusions
In reviewing the request for Final Subdivision, Staff makes the following findings of fact:
A. The request complies with the requirements of the Subdivision section of the City Code.
B. The Subdivision complies with the requirements of the R-L-P, Low Density Planned
Zoning District.
C. The Subdivision is compatible with the surrounding area.
D. The Subdivision is exempt from the requirements of the Solar Orientation Ordinance.
RECOMMENDATION:
Staff recommends approval of Christ Fellowship Church, Final Subdivision, #29-9413, subject to
the following condition:
1. The Planning and Zoning Board approves this planned unit development final plan
upon the condition that the development agreement, final utility plans, and final
P.U.D., plans for the planned unit development be negotiated between the developer
and City staff and executed by the developer prior to the second monthly meeting
Christ Fellowship Church, Final Subdivision, #29-94B
November 20, 1995 P & Z Meeting
Page 2
COMMENTS:
C. ,' ._i•
The surrounding zoning and land uses are as follows:
N: FA-1 (County); Rural residential
S: R-L-P; Vacant (Woodland Park Estates P.U.D.)
E: FA-1; (County); Rural residential
W: R-L-P; Single family (English Ranch 6th Filing)
The property was annexed into the City in 1994 and zoned R-L-P, Low Density Planned
Residential without the P.U.D. condition.
2. Land Use:
The request is for a straight subdivision, not a P.U.D. reviewed by the Land Development
Guidance System. As a subdivision request, the project is reviewed by the Zoning and
Subdivision sections of the City Code. The proposed uses are a church, with daycare and school,
on Lot One and single family residential on Lot Two. Both uses are permitted in the R-L-P Zone
District.
A. Zoning Code
The Zoning Code requires that the minimum lot size be 6,000 square feet and the minimum lot
width be 100 feet. Both these requirements are satisfied. At the time of building permit review,
the floor area for the proposed church will be limited to one-third the lot size.
B. Subdivision Code
The plat meets the technical requirements of the Subdivision Code. The Code also requires that
offices and agencies interested in land development review and comment on the adequacy of the
plat. Such offices and agencies are listed in the Subdivision Code and are authorized to forward
any objections to the Director of Planning. No unresolvable objections have been forwarded to
the Planning Department regarding Christ Fellowship Church.
C. Solar Orientation
Since the two lots exceed 15,000 square feet in size, they are exempt from the requirements of
the Solar Orientation Ordinance.
ITEM NO. 8
MEETING DATE 11 /20/95
STAFF Ted Shepard
PLANNING AND ZONING BOARD
STAFF REPORT
PROJECT: Christ Fellowship Church, Final Subdivision, #29-94B
APPLICANT: Christ Fellowship Church
c/o W.J. Frick Design Group
526 South College Avenue
Fort Collins, CO 80524
OWNER: Mr. and Mrs. Mike and Lynn West and
Christ Fellowship Church
P.O. Box 272592
Fort Collins, CO 80527
PROJECT DESCRIPTION:
This is a request for a two -lot subdivision on 7.99 acres located at the southeast comer of County
Road #9 and Charlie Lane. The site is zoned R-L-P, Low Density Planned Residential. There is
no condition that the property develop as a Planned Unit Development.
RECOMMENDATION: Approval with Condition
EXECUTIVE SUMMARY:
The request complies with the Subdivision section of the City Code. The Final Subdivision
complies with the bulk and area requirements of the R-L-P, Low Density Planned Zone District.
The Final Subdivision is compatible with the surrounding area. The lots are exempt from the
requirements of the Solar Orientation Ordinance due to exceeding 15,000 square feet in size.
The project is feasible from a traffic engineering standpoint.
COMMUNITY PLANNING AND ENVIRONMENTAL SERVICES 281 N. College Ave. P.O. Box 580 Fort Collins, CO 80522-0580 (303) 221-6750
PLANNING DEPARTMENT