Loading...
HomeMy WebLinkAboutCHRIST FELLOWSHIP CHURCH - FINAL SUBDIVISION - 29-94B - CORRESPONDENCE - (3)16. a so For further information regarding street improvements or the Development Agreement, please contact Kerrie Ashbeck, Civil Engineer, 221-6750. 21. A Street Oversizing Fee will be assessed at the time of building permit issuance. This fee will be $5,252 per developed acre for the church and $584 for the single family residential homes. (If the church facility is to be developed in phases, then the Street Oversizing Fee may also be phased. Or, the fee may be paid in full for the entire build -out with the first phase so that subsequent phases would not have to pay the fee.) 22. The Transportation Department is planning on adding bicycle lanes to County Road #9 this summer. For further information, please contact Eric Bracke, Transportation Engineer, 221-6608. 23. A neighborhood information meeting will be required. The Planning Department will set up and facilitate this meeting. You are responsible for providing the mailing labels for all .property owners within a geographical area as described by the .project Planner. Addresses must be on self-adhesive mailing labels. The Planning Department will conduct the mailing and charge .50 cents per address. Please contact Ted Shepard, 221-6750 if you are interested in pursuing this project the neighborhood meeting stage. subject to the runoff coefficient, the amount of hard surface, and the amount on onsite detention. 15. Whether submitted as a P.U.D., or as a use -by -right, the development of the property will require the submittal of a Drainage Report, Drainage and Grading Plan, and Erosion Control Plan. Onsite stormwater detention will be required on this property. 16. The most significant drainage issue will be to direct stormwater runoff from the developed site to the Fossil Creek Inlet Ditch located east of the homes along the Poudre Ridge. These flows must pass through intervening property owned by other parties. As the developer, you must obtain permission from these intervening property owners for a suitable drainage easement that can accommodate a properly -sized drainage pipe or swale capable of handling the volume and velocity of the stormwater runoff. Because of the hill, a dissipation structure may be needed at the outlet in order to minimize erosion. 17. It is suggested that you contact the intervening property owners immediately in order to obtain a "letter of intent" to begin the process of obtaining a legal easement for recording with the Larimer County Clerk and Recorder. 18. The stormwater detention and conveyance system must be capable of accommodating the 100-year storm. 19. A traffic impact analysis will be required. This study should primarily address the magnitude and scale of the proposed school and daycare facilities. This information will help determine the number of vehicle trips associated with the proposed development. The study should also account for the English Ranch access onto to County Road #9. Charlie Lane should be adequate to handle the proposed development as long as it is upgraded to a 36 foot wide "local" street. For further information regarding the scope of the traffic impact analysis or any other transportation issues, please contact Tom Vosburg, Transportation Planner, 221-6608. 20.. County Road #9 is classified as an arterial street on the City's Master Street Plan. As developers you are responsible for constructing the "local" street portion of the arterial street cross-section. Generally, this includes approximately 12 feet of pavement, four feet of sidewalk, curb and gutter. The City willpay for the "oversized" portion of the street to bring the roadway up to the arterial cross-section. The timing of this improvement will be determined by the City's Engineering Department. The obligation for construction will be specified in a Development Agreement made between the City and the Christ Fellowship Church. M 0 contact Roger Buffington as to the size of this line. (If existing property owners on Charlie Lane or Nite Court tap. into this line, then you are eligible to be repaid for a portion of the sewer installation by those property owners. The City will assist in this by writing a repay agreement that is valid for ten years and may be extended for another ten.) 5. Residential lots that are platted in the City will be expected to be tied into the sanitary sewer system for purposes of ground water protection and public health. 6. If lots are to front onto Nite Court, it may be necessary to install an eight inch diameter sewer main in Nite Court. 7. For the church, an automatic fire sprinkler system will be required. For the school and daycare, an automatic alarm system will be required. Handicap parking will be required as per the Uniform Building Code as adopted and amended by the City. For further information regarding building code requirements, please contact Sharon Getz, Plans Examiner, 221- 6760. 8. The Poudre Fire Authority will require that all portions of all buildings be located within 150 feet of an approved fire access roadway. All buildings, including residential, must be within 400 feet of a fire hydrant capable of delivering 1,000 gallons per minute. 9. The property must be platted. This would involve the nine week review process with a public hearing by the Planning and Zoning Board. This would be a subdivision review, not a land use review since the proposed uses are permitted in the R-L-P, Low Density Planned Residential Zone District. Please keep in mind that all residential lots must have a minimum of 20 feet of frontage along a publicly dedicated street. 10. The P.U.D. process is available to you as an option if the strict requirements of the R-L-P Zone do not afford the flexibility required in terms of site design.- For example, the P.U.D. process can vary building envelope size, setbacks, minimum yard areas, etc. 11. Whether a P.U.D. or a use -by -right, there is a 40 foot height limitation citywide. 12. The Zoning Code has minimum indoor and outdoor space requirements on a per child basis for the daycare. 13. The parking lot for the church will be required to be screened and landscaped as per the City's Parking Lot Development Guide. 14. The site is located within the Fox Meadows Drainage Basin. The Storm Drainage Fee in this basin is $6,468 per acre, 0 a CONCEPTUAL REVIEW STAFF COMMENTS MEETING DATE: March 13, 1995 ITEM: Christ Fellowship Church - West Annexation (Nussbaumer M.R.D.), Southeast Corner of County Road #9 and Charlie Lane APPLICANT: Pastor Ed Davis, Christ Fellowship Church, P.O. Box 272592, Fort Collins, CO. 80527. LAND USE DATA: Request for a 10,000 square foot church facility, with school and daycare, .and 2-3 residential lots located on 7.99 acres at the southeast corner of County Road #9 and Charlie Lane. COMMENTS: 1. Presently, electrical power is not available to the site. sources of electrical power are to the south at Hewlett- Packard and to the west at English Ranch across County Road #9. Between H-P and the subject site is Woodland Station Preliminary P.U.D. which would be required to bring the electrical system north. This system could be extended to serve your property. Three-phase power would be required to serve the proposed facility. If your proposal precedes the others in the area, then temporary overhead power can be brought to the site. Normal development charges will apply. For further information, please call Kevin Westhuis, 221-6700. 2. There is a 24 inch diameter water line in the east side of County Road #9 that is available to serve the site. As a developer, you are obligated to repay the City of Fort Collins for a portion of the cost of installing this line. Generally, this obligation would be for approximately one-half of a 12 inch diameter main for the length of the property frontage. Please contact Roger Buffington, 221-6681 for an estimate on what this payment to the City may be. 3. There is a six inch diameter water main in Charlie Lane. This water line may be sufficient to serve the proposed residential lots on the east of the property. 4. There is a 24 inch diameter sanitary sewer line in the west side of County Road #9• This line is available to serve the site. 5. There is a requirement that a sewer line be installed to the eastern limits of the property. Please COMMUNITY PLANNING & ENVIRONMENTAL SERVICES 281 NORTH COLLEGE P.O.BOX 580 FORT COLLINS, COLORADO 80522-0580 (303)221-675=7 PLANNING DEPARTMENT Comd9ghty Planning and Environment vices Planning Department City of Fort Collins March 14, 1995 Mr. Ed Davis Christ Fellowship Church P.O. Box 272592 Fort Collins, CO 80527 Dear Mr. Davis: For your information, attached is a copy of the Staff's comments concerning Christ Fellowship Church, presented before the Conceptual Review Team on march 13, 1995. The comments are offered informally by Staff to assist you in preparing the detailed components of the project application. Modifications and additions to these comments may be made at the time of formal review of this project. If you should have any questions regarding these comments or the next steps in the review process, please feel free to call me at 221-6750. Sincerely, / / Ted Shepard, AICP Senior Planner TS/gj d Attachments cc: Transportation Department Stormwater Department Project Planner File 281 North College Avenue • P.O. Box 580 Fort Collins, CO 80522-0580 • (303) 221-6750 FAX (303) 221-6378 TDD (303) 224-6002