HomeMy WebLinkAboutWESTFIELD PARK POOL - FDP - 27-94C - CORRESPONDENCE - STAFF'S PROJECT COMMENTS• \ 1
Project Comments Sheet
Selected Departments
City of Fort Collins
Department: Stormwater Utility
Date: March 1, 2002
Project:
WESTFIELD PARK POOL PDP - TYPE II #27-94B and FINAL
COMPLIANCE #27-94C
All comments must be received by STEVE OLT in Current Planning no later than the
staff review meeting:
February 27, 2002
Note - Please identify your redlines for future reference
Issue Contact: Bob Zakely
Topic: Erosion/Sediment Control
95
1. There are numerous key elements required by City of Fort Collins erosion control
specifications which have not been provided. Please do so.
Signature
Date
CHECK HERE IF YOU WISH TO RECEIVE COPIES OF REVISIONS
A Plat Site X Drainage Report Other_
k_ Utility Redline Utility Landscape
G-C. 9we OL{
Sew- isrpvh
Page 1
Project:
Planner:
s Ovr
PAQ+c t�L,
Traffic Operations:
Date: 2 21 7—
Engineer:
Items Requested
Redlined Items Being Returned
„
,o
_
v
a
F0 CrOther
�
Items Required
Ln
o
a
_
v
m
Ckf
0
Other Items being
Returned
Engineering
2—
Stormwater
-;e,
Water/Wastewater
IC
x
X
x
Traffic Operations
Transportation Planning
Transfort
Natural Resources
Park Planning
TOTALS -9AZf5 Gii
2
Z
Z
I
Other:
Note: All redlined items should be returned with the resubmittal/revisions. I
10
REVISION ROUTING SHEET
ITEM: 4:, 2 1
DA TE RECEIVED: '%p �i4-1D (
Z
g
�"
w
t!]
F
S
�
�-L
¢
�
¢
U
�
A
Z
¢
C•
�
y
¢
z °
Z
w Z
w °
Z Z
Z °
z
Z
� o
FILE: PROJECT- PLANNER
x
ENGINEERING PAVEMENT
ZONING
BUILDING INSPECTION
LIGHT & POWER
TECHNICAL SERVICES
FORESTRY
WATER & WASTEWATER/FCLD
PFA
POLICE - LORI DIGLIANI
ADVANCE PLANNING
STREETS
R.O.W. PLANNING
WATER CONSERVATION
POST OFFICE
US WEST
PUBLIC SERVICE
SCHOOLS: POUDRE / THOMPSON
AT & T DIGITAL CABLE
CDOT
DITCH COMPANY
RAILROAD: UP or BNSF
REA/DOE/PRPA
0
Department: Stormwater Utility
Topic: Erosion/Sediment Control
Issue Contact: Wes Lamarque
95
1. There are numerous key elements required by City of Fort Collins erosion
control specifications which have not been provided. Please do so.
Department: Water Wastewater Issue Contact: Jeff Hill
Topic: General
93
No comments at this time.
Be sure and return all of your redlined plans when you re -submit.
If you have any questions regarding these issues or any other issues related
to this project, please feel free to call me at 221-6341.
Yours Truly,
STEVE OLT
City Planner
Page 2
STAFF PROJECT REVIEW
City of Fort Collins
Wickham Gustafson Architects Date: 3/4/2002
1449 Riverside Ave.
Fort Collins, CO. 80524
Staff has reviewed your submittal for WESTFIELD PARK POOL - FINAL
COMPLIANCE #27-94C, and we offer the following comments:
ISSUES:.
Department: Engineering
Topic: General
Issue Contact: Susan Joy
94
Please return the Development Agreement information sheet so that we can
complete the DA. See attached.
Topic: Landscape Plan
90
Please show gas and electric as shown on the utility plan.
Topic: Plat
92
Change the Bicycle and Pedestrian Easement to read. "Public Access
Easement".
Topic: Utility Plans
51
9/ 18/01: Show concrete to property line at entrance.
2/27/02: This note disappeared... please provide note again, sheet cs200
and/or cs400.
91.
See redlines, sheet CS200 for note on sidewalk connection, east side
Page 1