HomeMy WebLinkAboutWESTFIELD PARK POOL - PDP - 27-94B - CORRESPONDENCE -d. The address must be visible from the adjacent street, with a
(� minimum of 6" high numerals on a contrasting background.
e. A Hazardous Materials Impact Analysis (Study) is required
because of the swimming pool and associated chemicals.
Please contact Ron, at 221-6570, if you have questions about these
comments.
9. Janet Meisel -Burns of the Parks Planning Department stated that
the City Parks Department has a cooperative agreement with the
Poudre School District relating to parking needs in the area. This
small piece of land is considered by the Parks Department to be
"excessive" and is expendable.
10. This development request will be subject to the Development
Review Fee Schedule that is available in the Current Planning
Department office. The fees are due at the time of submittal of the
required documents for the appropriate development review
process.
11. Under the LUC, this development proposal is subject to all
applicable requirements as set forth in the LUC, more specifically
Articles 2. Administration (Development Review Procedures),
Article 3. General Development Standards, and Article 4. [Zoning]
Districts.
6. Kim Kreimeyer, the City's Natural Resources Planner, stated that
a Fugitive Dust Control Permit, issued by the Larimer County
Health Department, must be acquired at time of construction.
7. Mark Jackson of the Transportation Planning Department
offered the following comments:
a. A Transportation Impact Study (TIS) will be required with
your Project Development Plan (PDP) submittal. Please .
contact Eric Bracke of the Traffic Engineering Department.,
at 224-6062, for information about what will be required in
the TIS. Also, contact Kathleen Reavis of the Transportation
Planning Department, at 224-6140, for information about
what will be required for a multi -modal level of service study
(bicycles, pedestrians, and public transit) as part of the TIS.
b. Please contact GayLene Rossiter of Transfort to discuss the
City's intentions regarding transit service in the area. She
can be reached at 221-6195.
C. Pedestrian and bicycle connectivity between this site and
surrounding sites is very important. This will be dealt with in
the TIS.
d. Adequate bicycle parking must be provided on -site for this
development.
e. A bicycle/pedestrian trail between this swimming pool
facility and the rest of the park should be provided.
Please contact Mark, at 416-2029, if you have questions about
these comments.
8. Ron Gonzales of the Poudre Fire Authority offered the following
comments:
a. A fire hydrant must be located within 400' of the building.
b.. The proposed 9' wide emergency access lane is not wide
enough. It must be at least 12' wide.
C. Fire flows of 1,000 gallons per minute at a residual pressure
of 20 pounds per square inch must be provided.
4. Roger Buffington of the Water/Wastewater Department offered
the following comments:
a. There is a proposed 8" water main and a proposed 8"
sanitary sewer main in future Westfield Drive.
b. If proposed, water and sanitary sewer mains are not designed
and installed by the development to the north, the extension
of the water/sewer lines will become the responsibility of this
swimming pool development. If the developer to the north
does install the water/ sewer lines and requests a
reimbursement agreement for these lines, a repay would be
due.
C. Plant investment fees and water rights will apply to this
redevelopment and will be collected at the time of issuance of
building permits.
d. The City's water conservation standards for landscaping and
irrigation systems will apply to this redevelopment.
C. A Warren Lake Trunk repay will also be due.
Please contact Roger Buffington, at 221-6854, if you have
questions about these comments.
5. Glen Schlueter of the Stormwater Utility offered the following
comments:
a. The property is in the McClelland/Mail Creek Drainage
Basin, where the development fee is $3,717 per acre and is
subject to the runoff coefficient reduction.
b. The standard drainage and erosion control reports and plans
are required and they must be prepared by a professional
engineer registered in the State of Colorado.
C. Please have your engineer look at the area detention pond in
Mountain Ridge, Third Filing regarding capacity for
additional stormwater from this proposed development.
Please contact Glen, at 224-6065, if you have questions about
these comments.
b. The standard utility plan submittal requirements will apply
to this development request.
C. Street oversizing fees will apply to this development. The fees
would be collected at the time of issuance of a building
permit and are based on the type of land use and vehicle
trips generated by the development. Please contact Matt
Baker, at 224-6108, for detailed information on the fees.
d. Westfield Drive and Seneca Street must be designed and
built before this development could begin construction.
Other developments in the area are in the process of
designing the streets and could possibly begin construction
of them in the near future.
e. This swimming pool facility development could be
responsible for repays to surrounding developments for the
cost of the adjacent streets.
Please contact Mark, at 221-6750, if you have questions about
these comments.
3. Bruce Vogel of the Light & Power Department offered the
following comments:
a. There is existing power in Seneca Street. The City will front
the cost of bringing power to the site. Once on -site, the
service will be at the developer's expense.
b. The transformer location for this development should be
coordinated with Light & Power.
C. There is a requirement that a minimum separation between
landscape plant materials and street lights, 40' for shade
trees and 15' for ornamental trees, be maintained.
Please contact Bruce, at 221-6700, if you have questions about
these comments.
Neighborhood support/recreation facilities shall mean
recreation/pool facilities and/or meeting rooms
intended for the use and enjoyment of residents and
guests of the adjacent neighborhood.
It was stated at the conceptual review meeting that the
swimming pool facility could be promoted to and used by
multiple neighborhoods, some outside of the square mile
bounded by Horsetooth Road to the north, Shields Street to
the east, Harmony Road to the south, and Taft Hill Road to
the west. This is the square mile that the facility would be
located in.
b. If the facility were to be an accessory use and allowed, then
proper buffer areas between the surrounding land uses must
be provided.
C. Parking requirements or allowances are set forth in Section
3.2.2 of the LUC would be 0.3 spaces per person using the
pool at any given time.
d. Bicycle racks must be provided in a safe and convenient
location near the front entry to the facility.
e. The proposed facility, if allowed, must meet the Land Use
Standards and General Development Standards in the LUC.
Please contact Gary, at 221-6760, if you have questions about
these comments.
2. Mark McCallum of the Engineering Department offered the
following comments:
a. A Transportation Impact Study (TIS) will be required with
your Project Development Plan (PDP) submittal. Please
contact Eric Bracke of the Traffic Engineering Department,
at 224-6062, for information about what will be required in
the TIS. Also, contact Kathleen Reavis of the Transportation
Planning Department, at 224-6140, for information about
what will be required for a multi -modal level of service study
(bicycles, pedestrians, and public transit) as part of the TIS.
CONCEPTUAL REVIEW STAFF COMMENTS
City of Fort Collins
MEETING DATE: February 7, 2000
ITEM: Westfield Park Swimming Pool
APPLICANT: Jim Sell Design
c/o Leon Bush
153 West Mountain Avenue
Fort Collins, CO. 80524
LAND USE DATA:
Request for a privately owned and operated swimming pool facility on
approximately a 1.0 acre parcel to be purchased from the City of Fort
Collins Parks Department. The proposal is for a recreational and
competition swimming pool facility to be used jointly by 9 - 10
neighborhoods. The property is located near the northeast corner of the
Westfield Park property at the southeast corner of future Seneca Street
and future Westfield Drive. It is in the RL Low Density Residential
Zoning District.
COMMENTS:
1. Gary Lopez of the Zoning Department offered the following
comments:
a. This property is in the RL - Low Density Residential Zoning
District in the Land Use Code (LUC), where the proposed
swimming pool facility as presented at conceptual review is
not permitted. The.facility, as proposed, would not be
permitted because it would be a "primary" recreation facility
to serve other than residents and guests of the adjacent
neighborhoods. The applicable definition in the LUC is as
follows:
COMMUNITY PLANNING AND ENVIRONMENTAL SERVICES Z81 N. College Ave. P.O. Box580 Fort Collins, CO80522-0580 (970)221-6750
CURRENT PLANNING DEPARTMENT