HomeMy WebLinkAboutWESTFIELD PARK POOL - PDP - 27-94B - CORRESPONDENCE - RESPONSE TO STAFF REVIEW COMMENTS (3)Project: Date: ? a 1
w
Planner: Traffic Operations: Engineer:
t
Items Requested
Redlined Items Being Returned
LA
D
m
�
a
C'
c
' o
0
Other Items Required
q
�'
-
�
y
ru
n
N
M
'm C"
0
Other Items being
Returned
Engineering-
Stormwater
Water/Wastewater
Traffic Operations
Trans ortation'Plannin
Transfort
Natural Resources
Park Planning
TOTALS 4J,,'rZ&
Other:
:Note: All redlined items should be returned with the resubmittal/revisions.
t -~ -W
REVISION ROUTING SHEET
a/V-7AI
ITEM: *:-V( {4P' wec&L%,ejA e2&=ead
DATE RECEIVED:
p
<
ua
V F
z°
z o
2 N
z CL.o
Z
w o
FILE: PROJECT PLANNER
ENGINEERING PAVEMENT
ZONING
BUILDING INSPECTION
LIGHT & POWER
TECHNICAL SERVICES
FORESTRY
WATER & WASTEWATER/FCLD
PFA
POLICE - 6 OR! DIG rnnir �
ADVANCE PLANNING
STREETS
'
R.O.W. PLANNING
WATER CONSERVATION
POST OFFICE
US WEST
PUBLIC SERVICE �jcc:tt
SCHOOLS: POUDRE /TROMPS
AT & T DIGITAL CABLE
CDOT
DITCH COMPANY
RAILROAD: UP or BNSF
REA DOE PRPA
u
Project Comments Sheet
x
Selected Departments
City of Fort Collins
Current Planning
DATE: September 18, 2001
PROJECT: WESTFIELD PARK POOL PDP - TYPE II #27-94B
All comments must be received by STEVE OLT in Current Planning no later than the staff
review meeting:
Note - Please identify your redlines for future reference
Dept: Water Wastewater
20
Issue Contact: Jeff Hill
Will an irrigation tap be needed for this development? ^ C9
21 Issue Contact: Jeff Hill
Show locations of electric and gas mains on the overall utility plans. Maintain 4
feet minimum separation between curb stop and electric/gas mains. D k
22 Issue Contact: Jeff Hill
'Citto q e existfh_g= wafer an`df,fw"e' rin'e�s�r Corrwe�c
ycvnorefiechrso I
-
✓' L
23 Issue Contact: Jeff Hill
Provide the sanitary sewer service detail on the detail sheet.�cl k,-�>
Si a e Date
CH CK HERE IF YOU WISH TO RECEIVE COPIES OF REVISIONS
x Plat ((Site _ Drainage Report Other
_�CUtilit} xRedline Utility Landscape
1 or, �yTt
10
Issue Contact: Jenny Nuckols
Is there any kind of ground sign proposed? If so, please show its location.
11
Issue Contact: Jenny Nuckols
This could be a very popular site, I would recommend a couple more bike racks.
12 Issue Contact: Jenny Nuckols
This should be a type 1 review - not a type 2
This development request is scheduled to go to an administrative public hearing
before a hearing officer on Thursday, October 11, 2001, at 3:00 p.m., in
conference room 'A' at 281 North College Avenue (see attached notification
letter).
Plan revisions reflecting changes made in response to this comment letter must now
be done. Please submit the number of copies of each document as indicated on the
attached Revision Routing Sheet by Friday, October 5, 2001. Be sure and return all
of your redlined plans when you re -submit.
If you have any questions regarding these issues or any other issues related to this
project, please feel free to call me at (970) 221-6341.
Yours Truly,
lkt�e�
STEVE OLT
City Planner
Page 10
16
Erosion/Sediment Control Comments:
Issue Contact: Wes Lamarque
Please submit a complete erosion/sediment control plan and report for review. If you
have any questions, please call Bob Zakely at 221-6700. 0. 14-
Department: Water Wastewater
20
Issue Contact: Jeff Hill
Will an irrigation tap be needed for this development?
21 Issue Contact: Jeff Hill
Show locations of electric and gas mains on the overall utility plans. Maintain 4 feet
minimum separation between curb stop and electric/gas mains.
22
Issue Contact: Jeff Hill
City crews will make taps on the existing water and sewer lines. Correct notes on the
overall utility plans to reflect this.
23
Issue Contact: Jeff Hill
Provide the sanitary sewer service detail on the detail sheet.
Department: Zoning
R
Issue Contact: Jenny Nuckols
The vicinity map on the site plan has the county road labeled incorrectly - it should be
CR38E not CR32E.
7
Label building envelopes
1.1
Label handicap parking stall dimensions
0
Issue Contact: Jenny Nuckols
Issue Contact: Jenny Nuckols
Issue Contact: Jenny Nuckols
This is in the neighborhood sign district. If there are to be any building signs, please
show their locations - not actual signage just their locations
Page 9
r
Department: PFA
17
Issue Contact: Michael Chavez
Address Numerals - Address numerals shall be visible from the street fronting the
property, and posted with a minimum of 10 inch numerals on a contrasting background.
97 UFC 901.4.4
18 Issue Contact: Michael Chavez
Water Supply - No commercial building can be greater then 300 feet from a fire hydrant.
Fire hydrants are required with a maximum spacing of 600 feet along an approved
roadway. Each hydrant must be capable of delivering 1500 gallons of water per minute
at a residual pressure of 20 psi.
97 UFC 901.2.2.2
19
Issue Contact: Michael Chavez
Hazardous Materials - Corrosive, flammable liquids, reactive, or toxic materials ( As
defined in the Uniform Fire Code) if used, stored or handled on site must have a
Hazardous Materials Impact Analysis (HMIA) completed and supplied to the Fire
Department and the City Planning Department. The HMIA needs to address the
prevailing air, the spill flow direction, and the potential impacts to the nearest storm
drainage system. FCLUC 3.4.5(C)
Department: Police
13
Issue Contact: Joseph Gerdom
Landscape Plan: The Serviceberry and plantings at the north side of the entrance (east
side of bldg) could create a security problem for employees. Lower growing (3'-4') would
be more appropriate. (The Ash shown on the pool deck will create a maintenance
problem.)
14 Issue Contact: Joseph Gerdom
Lighting: Lighting is needed on west side of building to deter trespass (none shown on
plans.)
Department: Stormwater Utility
15
Issue Contact: Wes Lamarque
The Stormwater Utility agrees that no quantity detention is required for this site, however
water quality should be provided for the parking lot. The volume is very small, and could
be placed south of the parking lot.
Page 8
67 Issue Contact: Susan Joy
Landscape Plan: Label all buildings, pads, etc.
68 Issue Contact: Susan Joy
Landscape Plan: Expand the Legend, see previous comments.
.•
Issue Contact: Susan Joy
Landscape Plan: Incorporate the comments from the Utility Plans so that all the sheets
match (detached sidewalk, etc).
70
Issue Contact: Susan Joy
Landscape Plan: Add the words "On -Site" to the on -site curb details.
71
Issue Contact: Susan Joy
Street Oversizing comments from Matt Baker: Repayment due for improvements to
Seneca Street and Westfield Drive. Based on submitted TIS from Matt Delich, July 11,
2001, Street Oversizing fee is estimated to be $21,312.00 and Larimer County
Transportation Fee is estimated to be $235.00. Contact Matt Baker 221-6605.
Department: Light & Power
1
Issue Contact: Monica Moore
Normal electric development policies and charges will apply for this development.
7
Issue Contact: Monica Moore
Developer is responsible for obtaining the permit and any applicable fees to work in the
City's right-of-way.
3 Issue Contact: Monica Moore
Developer will be responsible for any system modifications needed to bring power to the
site, including boring Westfield Drive.
4 Issue Contact: Monica Moore
Developer will need to contact Light and Power and coordinate a transformer location.
The developer will also need to submit a Commercial Service Form (C-1).
Page 7
56
Issue Contact: Susan Joy
Overall Utility Plan Sheets: Show general location of signs and label.
57 Issue Contact: Susan Joy
Overall Utility Plan Sheets: Add "Print Date" - all sheets. ULw 6 r 1q!' -�
58 Issue Contact: Susan Joy
Overall Utility Plan Sheets: Update all details on Detail Sheet to current LCUASS details
and include details for the off -site im ovements (curb, gutter, sw, etc). Add Street Cut
Note and show Street Patch er 25.2.3 CUASS. See Detail Sheet redlines.
54&,Id not n�eez' s��ee4 Fa".) Fr,el o� oIJ
�� 0.cc�r6
59 �g�e Ir�s4,0 Issue Contact: Susan Joy
Overall Utility Ran Sheets: Dimension all sidewalks.
.o]
C)' t-c' Issue Contact: Susan Joy
Site Plan: Dimension Handicapped parking.
61
Site Plan: Dimension sidewalk.
G'
Issue Contact: Susan Joy
Issue Contact: Susan Joy
Site Plan: Vicinity Map should be 10"x10" and to a scale of 1"=1000-1500'.
63
Issue Contact: Susan Joy
Site Plan: Incorporate the comments from the Utility Plans so that all the sheets match
(detached sidewalk, etc).
64
Issue Contact: Susan Joy
Site Plan: Expand the legend to include the different line weights, etc.
65 O" Issue Contact: Susan Joy
Site Plan: Add Owner, Developer phone numbers.
W
66 Issue Contact: Susan Joy
Landscape Plan: Show existing and/or proposed utilities.
Page 6
46
Issue Contact: Susan Joy
Grading Sheet: Please show limits of construction. Are you removing existing c/g/sw,
etc? Please see previous comments regarding phasing.
47
Issue Contact: Susan Joy
Grading Sheet: Expand your Legend to show line weights, symbols, each sheet.
48
V,V—
Grading Sheet: Label Trash Enclosure, all sheets.
Issue Contact: Susan Joy
49 G k . Issue Contact: Susan Joy
Erosion Control: Labe nora Long Term erosion control devices.
50 UW �' Issue Contact: Susan Joy
Erosion Control: Provide revegetation methods and specific notes.
51 () AU-, Issue Contact: Susan Joy
Overall Utility Plan Sheets: Show concrete to property line at entrance.
52 �" �..` t La(Q Issue Contact: Susan Joy
Overall Utility Plan Sheets: Do not use the high volume driveway, use detail 7-29A
instead. Incorporate this into your plans instead of referencing a detail.
53
Issue Contact: Susan Joy
Overall Utility Plan Sheets: Expand Legend - Show Property, ROW, easement line
weights, symbols, etc - all sheets.
54
U'U
Overall Utility Plan Sheets
filing.
55
Issue Contact: Susan Joy
Show Phasing of the development in relation to the 4th
Issue Contact: Susan Joy
Overall Utility Plan Sheets: Show proposed utility connections with existing utilities -
how will this phase with the 4th filing?
ekt41w%
Page 5
35
Issue Contact: Susan Joy
Cover Sheet: Provide a Legend with symbols and lineweights, each sheet.
36 C- U • Issue Contact: Susan Joy
Cover Sheet: Need the following statement annotated on the Cover Sheet: "I hereby
affirm..." V-
37
Issue Contact: Susan Joy
Cover Sheet: Provide the names, addresses, phone numbers for the Developer(s)/or &
Owners(s), each sheet.
C
Issue Contact: Susan Joy
Cover Sheet: Provide a 4"x6" block on each sheet for the Local Entity to place their
stamp of approval, each sheet. v lL
39 Issue Contact: Susan Joy
Cover Sheet: Add the Indemnification Statement, "These plans have...." See E-4.
40 0- Issue Contact: Susan Joy
Cover Sheet: Drawing Index - TS100 is either Cover Sheet or Title Sheet. See redlines.
41 0- Issue Contact: Susan Joy
Grading Sheet: Add the statement: "The top of foundation elevations shown...". See
the Checklist in Appendix E-4.
42 0 Issue Contact: Susan Joy
Grading Sheet: Show Phasing - see previous comments.
43 sk.,(d PLO 4- b� KO-4ec) Issue Contact: Susan Joy
WCe C1 P e i � C�-,(-/r low, rh
Grading Sheet: Incorporate detail 7-29A and detached sidewalk.
44 V-' Issue Contact: Susan Joy
Grading Sheet: Tie proposed grade into existing in the southeast drainage swale. See
redlines.
45
Issue Contact: Susan Joy
Grading Sheet: Add signature block, each sheet.
d Page 4
25
Issue Contact: Susan Joy
General: If Westfield Drive will be constructed prior to this property developing, than
show the limits of construction and add the Street Cut Note. All repairs to the street C
must meet current street standards.
26 Issue Contact: Susan Joy r�
It. •�r� ��t�
General: Detach the sidewalk on the north side of the property and bring it up to
current street standards. This may require dedication of additional ROW. Show Lw%r-`t U
how the sidewalk will tie into existing on the west side. Coordinate with Progressive
Living Structures to detach the sidewalk all the way to Seneca. 4+°��
27
Issue Contact: Susan Joy
General: Complete and submit the Checklist in Appendix E-4.
28 Issue Contact: Susan Joy
Plat: Update the plat language where noted. 1-,
29 Issue Contact: Susan Joy
Plat: Please provide the drainage easements where shown. o •\C-.
30
Plat: Add the Vicinity Map.
31
Issue Contact: Susan Joy
(). V -
Issue Contact: Susan Joy
Cover Sheet: Minimum size for the Vicinity Map is 10" x 10" and to a scale of 1"=1000-
1500'. V-
I
32
Issue Contact: Susan Joy
Cover Sheet: Provide the legal description in the title area as required in LCUASS.
0u_.
33 Issue Contact: Susan Joy
Cover Sheet: Update the General Construction Notes, see Appendix E-2.
34 (2)- \Z- - Issue Contact: Susan Joy
Cover Sheet: Fill in the blanks, line 19 and 40 of the General Notes.
D-V- .
(50
Page 3
t
77
Issue Contact: Steve Olt
At staff review on 9119/01, Susan Joy of the Engineering Department offered the
following comments:
a. Improvements to both sides of Westfield Drive must be done when the street is
built. Coordination of the timing for the construction phasing is critical. What
happens if the Mountain Ridge Farms, 4th Filing project (to he north) stalls? o t��
IliluUnla,7n aG% - L0-w` �S lihiw/ CLrS �� K �o�t SM•dd N 91
b. Westfield Drive must be designed to current City street standards.
p�}ac1.�J S�cJ 6titrvj DeU.Sn¢� on Soe.+� Sides
78 Issue Contact: "Steve Olt
At staff review on 9/19/01, Kathleen Reavis of the Transportation Planning Department
offered the following comments:
a. What is the status of Seneca Street] rearding the timing of construction?
Gf�M�IG �G
b. If Mountain Ridge Farms, 4th Filing sta�ls, what happens to tfield Drives'
C. What traffic control measures will be included at the intersec ion of Westfield
Drive and Seneca Street? At least stop signs should be providecj
576- p S t `1n — Stitt wv-s4 u..18 t (P ^ �i lc
79 Issue Contact: Steve Olt
At staff review on 9/19/01, Wes Lamarque of the Stormwater Utility indicated that water
quality is required for the pool parking lot and the erosion control is currently
inadequate. �� Q�l t �orto� I►15 !lam% 7-
80 Issue Contact: Steve Olt
The Current Planning Department comments can be found on red -lined plans that are
being forwarded to the applicant.
Department: Engineering
24 (IS
'sue Contact: Susan Joy 5 .,
General: If this project develops before Westfield Drive is constructed, than this
project will have to show phasing. Show what interim improvements will be made to
the water/waste water lines so this facility can operate. All road improvements from
Seneca to the western property line shall be installed and serviceable before
commencement of above -ground construction. I have attached a copy of Sheet 11
from Mountain Ridge 4th Filing for your reference. Note: The City Inspector
confirmed that the sewer line is the only improvement installed at this time. The
water line is scheduled sometime in the next few weeks, and paving should occur
sometime around the end of October.
Page 2
�.. STAFF PROJECT REVIEW
City of Fort Collins
WICKHAM GUSTAFSON ARCHITECTS Date: 9/27/01
1449 RIVERSIDE AVE.
FT. COLLINS, CO 80524
Staff has reviewed your submittal for WESTFIELD PARK POOL PDP - TYPE/#27-
94B, and we offer the following comments:
ISSUES:
Department: Current Planning
72
Issue Contact: Steve Olt
Len Hilderbrand of Excel Energy (Public Service) offered the following comments:
a. Gas main distribution is located off -site. Please contact Rick Traynor, at 225-
7827, to arrange extension of the gas main to your site. �
Gas wo-'s Slti ewrn C0ur/ 4O SeI1CL'�- 4,, e�-Sf. 5-de--4 NIkJG�^n
b. No trees may be planted within 4' of gas mains.
73 Issue Contact: Steve Olt
Tim Buchanan, the City Forester, offered the following comments:
a. The proposed Silver Maple (Acer Saccharinum) should not be used as a
landscape tree. it does not survive in Fort Collins. Change the Silver Maple to
another shade tree species.
b. Add the required plant notes to the Landscape Plan (see attachment).
74 Issue Contact: Steve Olt
Craig Foreman of the Parks Planning Department indicated that the proposed drainage
swales are a tabtet�the ParksDenatfinent Easements will need to be granted for
the swale . They must be reseeded to City specifications. _. �� A-DPif P �D
75 Issue Contact: Steve Olt
Laurie D'Audney of the City's Water Conservation Department is forwarding a copy of
the City's Water Conservation Standards for Landscapes and Irrigation Systems. This is
attached to this comment letter.
76
Issue Contact: Steve Olt
Rick Lee of the Building Department is forwarding a copy of the various codes that the
Building Department will enforce. The information is attached to this comment letter.