Loading...
HomeMy WebLinkAboutCOTTONWOOD RIDGE SUBDIVISION - FINAL - 31-94A - SUBMITTAL DOCUMENTS - ROUND 1 - SUBMITTAL CHECKLISTCity of Fort Collins Current Planning SUBMITTAL CHECKSHEET #3/-9z1A- PINAL Awe 6 The following checksheet is to be used in the preparation of a complete submittal of a Final Subdivision Plat 2. 3. 4. V/ 5. Z 6. V/ 7. 8. Application form (1 copy) �L— c Filing Fee: $2176 t Final plat (21 folded copies) Final utility plans and drainage plans (10 unfolded copies) Final drainage report or letter ( copies) Final soils report (2 copies) Other documentation as determined by special circumstancesafe CI ) Signage (circle one) 1• �11/�Caiat� Large S.F. 100 or more D.U. M.F. 100 or more D.U. Non -Res 50,000 S.F. or more Non -Res w/regional impact Small S.F. up to 100 D.U. M.F. up to 100 D.U. Non -Res 25,000-50,000 S.F. All other projects not listed ** Preliminary or Final Subdivision Plats submitrted concurrently with a Preliminary or Final PUD Plan, RF/RC Site Plan, Non -Conforming Use Review, or IL/lP Site Plan shall be charged one-half the Preliminary or Final Subdivision Plat fee.