HomeMy WebLinkAboutHARMONY SAFEWAY MARKETPLACE, LOT 6, FUEL FACILITY - PDP - 33-94F - CORRESPONDENCE - STAFF'S PROJECT COMMENTS (3)r
10. Please provide riprap for the pond outlet pipe including calculations in the report per
section 8.2 of the SDDC or section 5 of the Major Drainage section in the volume 2
of the Urban Storm Drainage Criteria Manual. A pan extension from the end of the
pipe may also work. However, it is a concern that erosion could occur on the swale
bank opposite the outlet. Please consider this in the erosion protection design.
RESPONSE: A r121CICl,E CI-�ANNc l_ t,�PtS Pi101) I��'J
kS P-(e- CO" VG-7?,r., 0M 9)ab 10c�
11. The Statement of Planning Objectives and the report discuss a phasing plan, but it is
unclear when the drainage facilities will be completed. Please clearly show that the
drainage facilities will be completed with Phase 1.
RESPONSE: NC,`—E ,AJ ,4, S A- t� E'I-,, I—tD yJ v M L�C.t S
S Ttt AT A LL 'M . 1=A-C I u 71 E7S ROE P"SE
12. Please provide a drainage easement by separate cover or a replat of the site for the
pond and other drainage facilities at the site.
RESPONSE: 'Di2 . CAS-F, PizoV 1 '-� Eft Q� S EPRT£ Gl�lt-LE N l
13. The pond orifice calculations are unclear. Please explain all the values used in the
calculations. Please show what the flow through the orifice would be for the head at
the spillway elevation. Also, please consider the tailwater elevation in the existing
swale in basin OS-S1 in these calculations.
RESPONSE: (�F1ilSED
AlLwf}`veE- WAS No CONSr'E7(2FT-'� s SW SSE- 6
rN -D2� RFtoo�i
Erosion/Sediment Control Comments:
The plan is OK. Thank you! KOOL-.
Please refer to the redlined plans and report for additional review comments.
HarmSafePad6-Ldoc Page 3 of 3
3. The location of the proposed spillway is unclear. Considering the previous comment,
please clearly show the location of the spillway with spot elevations. Also, please
consider the need for erosion control on the bank and provide it if necessary.
RESPONSE: -RA--V I SE
4. Please move the trash enclosure away from the existing drainage easement.
RESPONSE: T12A'-H .OS>✓ IZ Ai)L)TE l�2 , El3�, 607 1JOC'S
NOT 11A P Et� c o to 1-re
5. According to the Harmony Safeway Marketplace report by Northern Engineering
(March 7, 1997), Basin N-8, of which Basin OS -NI is a part, extends to the north
beyond what is shown on the plans. Please denote this and verify that these flows
will be accommodated by the proposed replacement (Type 13) inlet in the driveway.
Also, please provide a vane grate to capture as much flow as possible.
RESPONSE: 'FLvv-) S V�21 �p `S �ENO1 E� D ICI
6. Please provide storm sewer and inlet calculations that show these facilities are sized
correctly. Please provide a minimum 15-inch pipe for the pond outlet per section
5.3.2 of the SDDC.
RESPONSE: Pt I S i Pi P tnl f�S P2rJ V I� ©N�- 3C�F�uS� TN E
02 (FI ce REQu l eFD ►T, SEc7rC)ry 9.31o F - -OC -5btJ .
PE7lzT-Pr t m s Tn "pu &- i L S VS- EMS..
7. Please include flow arrows and concentration points on the drainage plan.
RESPONSE:
REVISE
8. Please be sure the pond outlet invert elevation is consistent on all details in the plans
and all calculations in the report.
RESPONSE:
Fe- V I SE-b
9. Please provide a profile view of the pond outlet pipe and its relation to the utilities it
crosses. If necessary, please concrete encase the storm sewer per section 5.3.4 of the
SDDC. Also, please include a note on the drainage plan that all storm sewers are to
be inspected by the City.
RESPONSE: RE-� IS
HarmSafePad6-Ldoc
Page 2 of 3
r n, PROJECT
w COMMENT SHEET
City of Fort Collins
Current PlanninF-
DATE: August 3, 2000 TO: Stormwater Util,
PROJECT: #33-94F Harmony Safeway Marketplace, Pad 6,
Fuel Facility — Type II - PDP (LUC)
All comments must be received by Ted Shepard no later than the staff
review meeting:
August 30, 2000
Note- Please identify your redlines for future reference
The City is requiring automatic spill containment at fueling stations. Enclosed is a
section from the pending criteria manual and an example of such a structure. Please
provide an automatic system rather than a manual shutoff gate. This means providing
a buried pipe, from the point of collection to the detention pond and calculations that
show the minimum containment of 150 gallons is being provided. If you have any
questions regarding this structure, please contact Glen Schlueter (970-224-6065).
RESPONSE: 1?EV SCE
2. Please provide one foot of freeboard from the spillway elevation to the finished floor
elevations of all buildings (including the store and kiosk) per section 9.2 of the Storm
Drainage Design Criteria (SDDC). Although not required, it is recommended that the
pump islands be elevated above the spillway elevation. As currently shown, water
would pond into half the site before passing through the spillway. It may be easier to
lower the existing sidewalk to get an appropriate spillway elevation.
RESPONSE: I� I SCE iJ to tNoT M 000 K I O S k To
AtJ ELt=�/ATlCDt l 1 ` #4 60V6- b/o/u-wp'y el- , PUMPS
�� `t C Fr- ►A- �
��/l s
A,11 may' N '1
Signature
CHECK HERE IF YOU WISH TO RECEIVE COPIES OF REVISIONS R#p rc WorN ,
Plat aSite jDrainage Report Other 95
utility (7Redline Utility kLandscape City of of F
t. 15. The future convenience store phase is not landscaped. It could be shown now or
must submit for a Minor Amendment in the future when applying for a building
permit. The convenience store parking lot must feature no less than 6% interior
parking lot landscaping.
16. The landscape plan does not indicate very much existing landscaping in the 80
foot wide setback area along Harmony Road. This area is considered part of the
site and should be landscaped in accordance with the Harmony Corridor Plan
Standards and Guidelines.
17. The lighting levels under the canopy are excessive. The Planning Department has
recently conducted a night survey with a light meter in conjunction with another
application for a convenience store with fuel station. Light levels at 25 foot
candles allow a customer to read the pump instructions as well as use a credit
card. The proposed light levels are so high in comparison to the private parking
lot and public roadway that the eye's pupils will constrict resulting in the opposite
of the intended effect. The foot candles under the canopy should be reduced so
that the highest reading is 25 directly under the fixtures.
18. Please provide manufacturer's specification sheets for both the under canopy
lights and the poles fixtures. The lighting plan should reflect these specifications.
19. If wall pack lighting will be featured on the future convenience store, then it must
be included now or in a Minor Amendment at the time of building permit.
20. Please describe the building envelope dimensions for the c-store and distance to
the nearest property line.
21. Under General Note number 12, please delete the word "Any."
22. Please add a note stating that all roof top mechanical equipment will be screened
from view.
23. Please add a note stating that the hours of operation are restricted and shall be
between 5:00 a.m. and 12:00 a.m.
This concludes Staff comments at this time. As always, please call if you have any
questions or concerns about these comments.
SSincc Iely:
Ted Shepard
Chief Planner
Enc.
the existing Safeway. The clearance specifications are three feet from sides and
rear. The front should feature a latched, but not locked gate. The west, south and
east sides of the enclosure should be landscaped.
5. Please refer to the attached comment sheet from Public Service Company. Please
note that the gas service to the future convenience store will come from the gas
main in Harmony Road. There is no gas line on the north side of the lot.
6. Please refer to the attached comment sheet from the Poudre Fire Authority.
Please note that a drawing will be needed illustrating the entrance and exit route
for the fuel truck.
7. Please refer to the attached comment sheet from Building Inspection. Please note
that a weather -resistive barrier is needed for EIFS construction.
8. The canopy, kiosk and future c-store should be rotated approximately 20 degrees
to parallel the internal access drive.
9. A sidewalk should be constructed along the north side of the site adjacent to the
internal access drive. This walk should be 5.5 feet wide and lined with two-inch
caliper deciduous shade trees on 30 foot intervals. Cut-outs may be necessary to
install the trees needed for screening a gas station.
10. The canopy should be re -designed to feature slightly pitched roof. The canopy is
an important design element since it dominates the pad site and creates a first
impression for the shopping center. A flat -roofed canopy is unacceptable.
11. The canopy fascia cannot be white. It must be beige/tan muted earth tone to
match the color of the exterior of Lot 5.
12. The proposed wall signage on the phase two convenience store is excessive for a
neighborhood shopping center. Signage on all four elevations will not be
permitted. The front elevation, canopy logo, and monument sign should be
sufficient. Wall signs on the north, west, and south should be eliminated.
13. Please add a note that pump -top signage on the fuel dispensers will be prohibited.
14. Please add the following note to the elevations for the future convenience store:
"The front facing windows may not be used for the display of advertising
messages, logos, posters, banners, window signage, neon tubing, pricing
information, coupon information or any type of product promotion, or any such
commercial message."
Commu y Planning and Environmental
Current Planning
City of Fort Collins
September 15, 2000
Ms. Peggy Friesen
Galloway, Romero & Associates
5350 DTC Parkway
Englewood, CO 80111
Dear Peggy:
-vices
Staff has reviewed the request for Safeway Fuel Facility at Harmony Safeway Market
Place and offers the following comments:
Please refer to the attached comment sheet from the Engineering Department. For
site planning purposes, please note the following:
A. The Transfort bus pad and shelter should be shifted to the west. As
presently located, it is too near the intersection of Harmony Road and the
private access drive. By shifting west, the bus stop can be aligned with the
existing north -south sidewalk that connects directly to the grocery store.
A bridge or culvert must be constructed over the existing drainage swale.
The developer is responsible for providing the shelter.
B. Both the trash enclosure and tower appear to encroach upon utility
easements. Also, the air and vacuum and telephone appear to encroach
into the 80 foot setback area along Harmony Road which is also platted as
an easement.
2. Please refer to the attached comment sheet from Stormwater Department. Please
note that the City is requiring automatic spill containment at fueling stations.
3. Please refer to the attached comment sheet from the Water and Wastewater
Department. Please note that the existing six-inch water line extended to the site
is intended to be a fire line.
4. Please refer to the attached comment sheet from the Light and Power Department.
Please note that there is a concern about the placement of shrubs. Rather than
remove landscaping from the front of the transformer as requested, the
transformer should be screened by a solid enclosure matching the stone veneer of
281 North College Avenue • P.O. Box 580 • Fort Collins, CO 80522-0580 • (970) 221-6750 • FAX (970) 416-2020