HomeMy WebLinkAboutHARMONY SAFEWAY MARKETPLACE, LOT 6, FUEL FACILITY - PDP - 33-94F - SUBMITTAL DOCUMENTS - ROUND 3 - ROUTING SHEETProject. ± 2�- 9yf r�
Planner:
Engineer: A�lyr
Tra>Nc Operations:
Date: zz6
P aP. SETS Items Requested
Site I Land I Plat Utility Drainage R t Other Items Required
Engineering X
Redlined Items Being Returned
Site land Plat Utili ty Drainage R t Other Items Being Returned
Stormwater
' K
k
water/Raitewater
x
Tragic Operations
Trans. Planning
Transfort
Natural Resources
Park Planning
Totals
Other:
Note: All redlined items should be returned with the resubmittai/ revisions.
Re"sions Routing Sheet
i
ENGINEERING: PAVEMENT
ii®MAPPING
ii��������
/ DRAFTING
m
mmmm
ADVANCE PLANNING -1000
m
�mmmR.O.W.
��
PLANNING
m
m
WATER CONSERVATION
M
M
•• • a
mNoSTATE
��
PUBLIC SERVICE
m
No
m
mm
mm
...
���mm
momRAILROAD:
����
UP or BN/CS
mom
mm
iiiiiis
mommom�
���
iii
mm
,GoMflENrs o�E i.t-ao 00 3
OL