Loading...
HomeMy WebLinkAboutHARMONY SAFEWAY MARKETPLACE, LOT 6, FUEL FACILITY - PDP - 33-94F - SUBMITTAL DOCUMENTS - ROUND 3 - ROUTING SHEETProject. ± 2�- 9yf r� Planner: Engineer: A�lyr Tra>Nc Operations: Date: zz6 P aP. SETS Items Requested Site I Land I Plat Utility Drainage R t Other Items Required Engineering X Redlined Items Being Returned Site land Plat Utili ty Drainage R t Other Items Being Returned Stormwater ' K k water/Raitewater x Tragic Operations Trans. Planning Transfort Natural Resources Park Planning Totals Other: Note: All redlined items should be returned with the resubmittai/ revisions. Re"sions Routing Sheet i ENGINEERING: PAVEMENT ii®MAPPING ii�������� / DRAFTING m mmmm ADVANCE PLANNING -1000 m �mmmR.O.W. �� PLANNING m m WATER CONSERVATION M M •• • a mNoSTATE �� PUBLIC SERVICE m No m mm mm ... ���mm momRAILROAD: ���� UP or BN/CS mom mm iiiiiis mommom� ��� iii mm ,GoMflENrs o�E i.t-ao 00 3 OL